Powered by Made-in-China.com
1.5 Ton Flameproof Battery Powered Mining Locomotive for Underground Tunnel
US$4,000.00
1 Piece
Product profile
Customization
AvailableCustomized
CustomizedMotive Power
ElectricModel NO.
CTY1.5/6GBTransport Package
Standard Export QualityTrademark
ZlinktricOrigin
ChinaHS Code
86011011Production Capacity
1000 Piece YearKey features
Meets mining flameproof/explosion-proof standards (Ex/MA optional). Suitable for gassy mines.
Compact structure with a small turning radius, perfectly adapted to narrow tunnels and curved roadways in underground mining operations.
Equipped with maintenance-free lead-acid or lithium batteries, delivering zero emissions and extended runtime for continuous mining shifts.
Company profile
Business Type: Manufacturer/FactoryAverage Response Time: ≤1.70h
About Our Factory & Business Background
AddressLangao Industrial Park, Yantai, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsMining Locomotive, Mining Scooptram, Mining Mucking Rock Loader, Mining Wagon, Railway Steel
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What are your terms of payment?
A:
T/T 30% deposit, 70% before delivery. We'll show product photos before balance.
Q:What are your terms of delivery?
A:
EXW, FOB, CFR, CIF, DDU.
Q:How about your delivery time?
A:
Generally 15 to 30 days after advance payment. Stock items vary by order specifics.
Q:Do you test all your goods before delivery?
A:
Yes, we conduct 100% testing before delivery.
Q:How do you make our business long-term and good relationship?
A:
Through innovation, aiming for customer satisfaction, quality products, and after-sales service.
Send Inquiry
*To:
Yantai Zlinktric Mining Equipment Co., Ltd.
Yantai Zlinktric Mining Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
High-Performance 5-Ton Battery-Powered Mining Locomotive for Efficient Transport
US$5,000.00
1 Piece(MOQ)
Efficient 8-Ton Battery Locomotive for Underground Mining Transportation System
US$22,999.00
1 unit(MOQ)
Underground Mining Battery Electric Locomotive for Tunnel Ore Transportation
US$4,000.00
1 Piece(MOQ)
2.5t/5t/8t/12t Small Mining Battery Electric Locomotive for Underground Mine Tunnel Use
US$5,800.00-16,800.00
1 Set(MOQ)
1 Ton 3 Ton 5 Ton Battery Electric Diesel Mining Locomotive for Mine Tunnel
US$3,500.00
1 Piece(MOQ)
High-Performance 1.5 Ton Lithium Battery Locomotive for Mining
US$2,700.00-3,000.00
1 Unit(MOQ)
Heavy-Duty 1.5 Ton Electric Locomotive for Underground Mining
US$2,700.00-3,000.00
1 Unit(MOQ)
5 Ton Underground Mine Battery Locomotive Mining Cty5 Narrow Gauge Tunnel Locomotive
US$7,900.00-9,600.00
1 sets(MOQ)
Customizable 1.5-Ton Battery-Powered Locomotive for Underground Ore Rail Transport
US$1,900.00-2,600.00
1 sets(MOQ)
5 Ton Underground Battery Mining Electric Locomotive
US$3,500.00
1 Piece(MOQ)
Eco-Friendly Battery Electric Locomotive for Underground Mining Needs
US$2,500.00
1 Piece(MOQ)
Underground Trolley Mining Locomotives Battery Electric Narrow Gauge Locomotive for Transportation
US$1,869.00-4,599.00
1 Piece(MOQ)



















