Powered by Made-in-China.com
Efficient Electric Mining Locomotive for Seamless Underground Hauling
US$6,900.00
1-9 Pieces
US$6,500.00
10+ Pieces
Product profile
Customization
AvailableAfter-sales Service
ProvideWarranty
1.5yearsModel NO.
CTY2.5/6GBCustomized
CustomizedApplication
Train Engine, MiningMotive Power
ElectricHorsepower
8kwSpeed (Km/H)
5.8km/HBattery Voltage
48VTrack Gauge
600mmElectric Time
8hUse Time
10hElectrolyte Capacity
102LPass Minimum Curve Radius
4mFixed Weight
18tonsCharger Power
2.5kwTransport Package
BoxSpecification
1660*970*1550mmTrademark
ZlinktricOrigin
Shandong, ChinaKey features
Compact Underground Design: 1.66m width fits directly below cages in narrow tunnels.
High Strength Gearbox: Three-stage design with 40CrMnTi gears for high impact resistance.
Durable Manganese Steel Wheels: Cast wheels ensure exceptional wear resistance and durability.
Robust Steel Construction: Seamless steel tube casing offers moisture and earthquake resistance.
18 Ton Traction Capacity: Capable of pulling up to 18 tons of mining carts efficiently.
Long Battery Endurance: Up to 10 hours of working time with 8 hours charging.
Optional Wireless Remote: Wireless control extends up to 100 meters for safer operation.
1.5 Year Warranty: Comprehensive warranty coverage for peace of mind.
Company profile
Business Type: Manufacturer/FactoryAverage Response Time: ≤2.59h
About Our Factory & Business Background
AddressLangao Industrial Park, Yantai, Shandong, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsMining Locomotive, Mining Scooptram, Mining Mucking Rock Loader, Mining Wagon, Railway Steel
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What are your terms of payment?
A:
T/T 30% deposit, 70% before delivery. We'll show product photos before balance.
Q:What are your terms of delivery?
A:
EXW, FOB, CFR, CIF, DDU.
Q:How about your delivery time?
A:
Generally 15 to 30 days after advance payment. Stock items vary by order specifics.
Q:Do you test all your goods before delivery?
A:
Yes, we conduct 100% testing before delivery.
Q:How do you make our business long-term and good relationship?
A:
Through innovation, aiming for customer satisfaction, quality products, and after-sales service.
Send Inquiry
*To:
Yantai Zlinktric Mining Equipment Co., Ltd.
Yantai Zlinktric Mining Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Efficient 8-Ton Battery Locomotive for Underground Mining Transportation System
US$22,999.00
1 unit(MOQ)
Energy-Efficient Overhead Catenary Mining Locomotive for Underground Tunnel
US$4,900.00-15,000.00
1 Set(MOQ)
Lithium Battery Electric Locomotive for Efficient Underground Mining
US$2,688.00-5,000.00
1 Piece(MOQ)
Efficient Electric Mining Locomotive for Underground Rail Systems
US$7,500.00
1 Piece(MOQ)
Advanced Battery Electric Locomotive for Efficient and Eco-Friendly Underground Mining Operations
US$5,800.00-16,800.00
1 Set(MOQ)
8 Ton Battery Mining Locomotive Electric Rail Mine Trolley for Underground Mining
US$10,800.00-11,000.00
1 Piece(MOQ)
Customized 18ton Battery Electric Locomotive for Underground Mining Tbm Tunnel Freight
US$20,000.00-500,000.00
1 unit(MOQ)
Mediu Size Lead Acid Battery Electric Locomotive for Narrow Gauge Rail and Underground Mining
US$10,200.00-10,500.00
1 Unit(MOQ)
Electric Locomotive for 600mm Narrow Gauge Tunnel Underground Mining to Transport Ore Coal Rock with CE Certification
US$3,900.00-4,000.00
1 Piece(MOQ)
8ton Mining Electric Locomotive Narrow Gauge Railway Locomotive for Underground Work
US$5,800.00-16,800.00
1 Set(MOQ)
Hot Sale Ccg Electric Battery for Locomotives Underground Mining Mine Diesel Locomotive
US$2,688.00-5,688.00
1 Piece(MOQ)
Reliable Mining Battery Electric Locomotives for Efficient Operations
US$10,000.00
1 Piece(MOQ)
Overhead Line Locomotive Battery Powered Electric Locomotive For Underground Mining
US$9,000.00-15,000.00
1 Piece(MOQ)
Cty2.5 Battery Mining Electric Locomotive for Underground Tunnel Ore Transport
US$4,250.00
1 Piece(MOQ)
Cjy Transportation Electric China Coal Battery for Underground Trolley Mining Locomotive
US$1,869.00-4,599.00
1 Piece(MOQ)
Eco-Friendly Battery Electric Locomotive for Underground Mining Needs
US$2,500.00
1 Piece(MOQ)
Hot Sale Diesel Mining Underground Electric Train Railway Shunting Locomotive for Mining Support
US$2,688.00-5,688.00
1 Piece(MOQ)
Diesel Mine Electric Battery Locomotive Underground Mining Locomotive for Coal Mine Ore and Material Hauling
US$12,300.00-16,590.00
1 Piece(MOQ)



















