SourcingAI
Try for free
Powered by Made-in-China.com
Mobile Smart Control System Portable Containerized Fuel Station with Fuel Management
US$8,000.00-35,000.00
1 Piece

Product specifications

50 m^3

Wall Layer

Product profile

Customization

Available

After-sales Service

2 Years

Flow Rate

80- 100 L/min

Model NO.

30

Size

5000L - 50000L

Capacity

Double Tank

Type

Container Portable Fuel Station

Medium

Diesel

Application

Transport, Mining, Construction, Industrial, Airpo

Certification

ISO9001, CE, ASME

Material

Carbon Steel / Stainless Steel

Anti-Explosion Type

Barrier Explosion-Proof

Compartment

Single or Dual Compartments

Refueling Equipment

Fuel Dispenser, Oil Pump, Level Gauge, Control Box

Wall Type

Double Wall (Inner Carbon Steel, Outer Steel or Fi

Voltage

380V

Transport Package

Standard Sea Shipping Container / Nude Packing

Specification

5000L - 50000L

Trademark

ZHONGNENG HUAJIAN

Origin

China

HS Code

8479899990

Production Capacity

10 Units / Month

Key features

Advanced barrier technology prevents explosions from fire, sparks, or lightning.
Pre-assembled for instant use; no on-site welding required with high mobility.
Double-wall leak monitoring; GB50156 compliant for corporate and specific site use.

Company profile

Zhongneng Huajian (Shandong) Metal Structure Co., Ltd.
Overseas ServicesFull CustomizationODM ServicesCooperated with Fortune 500
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.52h

About Our Factory & Business Background

AddressNo. 188, South of the Road, East of Sizhuting Village, Xinglongzhuang Subdistrict, Yanzhou District, Jining City, Shandong Province, China
Plant Area16500 square meters
Number of Employees14
Registered Capital66,000,000 RMB
Terms of PaymentT/T, LC, Western Union, PayPal, D/P, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 PCS
Supply Chain Partners25

Our Production Capability & Technical Expertise

Main ProductsStorage Tank, Oil Storage Tank, Fuel Storage Tank, Water Storage Tank, Liquid Storage Tank, Pressure Vessel, Mobile Fuel Station, Container Fuel Station, Double-Walled Tank, Space Frame
Production Lines7
Production MachinesFlame Cutting Facility, Stamping Facility, Spinning Facility, Shot Blasting Facility, Plate Rolling Facility, Painting Room, Automatic Welding Facility
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Test Reports for Raw MaterialsOthers

Our Industry Experience & Global Business Record

Year of Establishment2023-11-15
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What are the key site requirements for this larger unit?
A:
In addition to the horizontal foundation layer, the following points should also be considered: Accessibility: A 40-foot-long truck needs sufficient turning radius for cargo transportation. Service: A three-phase power supply connection with higher current capacity is required, and a water supply/drainage system may be necessary to meet the usage requirements of the water tank. Foundation: It is recommended to use a reinforced concrete foundation layer for permanent fixation.
Q:For a multi-year project, how does the cost-benefit analysis compare to building separate facilities?
A:
1) Speed: Compared to the design-build model, it can be operational within weeks rather than months. 2) Capital efficiency: It eliminates the need to construct separate structures, foundations, and utility infrastructure for the workshop. 3) Resale value: At the end of the project, the entire asset can be redeployed or resold, whereas permanent facilities represent sunk costs.
Q:How is delivery handled for two different fuels?
A:
The unit will have two distinct, clearly labeled fill points, often on opposite sides or ends of the container. Delivery drivers must be instructed on the product layout. Interlock systems can be installed to prevent mis-delivery, such as different sized adapters for the fill connections.
Q:Does this design require more maintenance?
A:
It essentially doubles the maintenance items (two filters, two pumps, etc.), so service interval checks are more frequent. However, the systems are independent, so servicing one does not affect the availability of the other, minimizing operational disruption.
Q:How does this affect lead time compared to a standard container unit?
A:
Lead time is longer, often by 2-4 weeks. This accounts for the detailed engineering review, the physical load testing and securing validation, and the inspection and certification process by the classification society surveyor.

Send Inquiry

*To:Zhongneng Huajian (Shandong) Metal Structure Co., Ltd.Zhongneng Huajian (Shandong) Metal Structure Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Eaglestar Mobile Gas Fuel Station with Atg System
Made-in-China.com
Portable Mobile Fuel Gas Station with Pump for Africa
Made-in-China.com