SourcingAI
Try for free
Powered by Made-in-China.com
High-Performance 3 M³ Underground Mining LHD Loader Equipment
US$160,000.00-170,000.00
1 unit

Product profile

Customization

Available

Material

Carbon Steel

Certification

ISO9001:2008, CE

Model NO.

ZDL307

Energy Saving

Energy Saving

Warranty

1 Year

Color

Yellow

Customized

Customized

Condition

New

Type

Underground Vehicle

Structure

Underground Loader

Material Feature

Wear-Resistant

After-Sales Service

Localized After-Sales Service

Rated Power/Rated Speed of The Engine

165kw/2200 R/Min

Rated Load Capacity

7 T (Full Load)

Bucket Capacity (Stacking)

3 M³

Hydraulic Oil Tank

300 L

Fuel Tank

200 L

Transport Package

Nude Packing

Specification

9250× 2600× 2250 mm

Trademark

ZONGDA

Origin

China

Key features

High Performance Engine: Equipped with DEUTZ BF6M1013EC water-cooled engine, 165kW power.
Robust Transmission System: DANA R32000 series automatic shift with C270 torque converter.
Advanced Braking System: Wet multi-disc spring brake with hydraulic release for safety.
Customized Engineering: Tailor-made engineering services for unique mining project challenges.
Global Service Network: Prompt maintenance, repair, and spare parts supply to minimize downtime.
ISO and CE Certified: Meets ISO9001:2008 and CE safety and quality standards.
Wear-Resistant Material: Constructed with carbon steel featuring wear-resistant properties.

Company profile

QINGDAO ZONGDA MACHINERY CO., LTD
Importers and ExportersHigh Repeat Buyers ChoiceExperienced Team
Business Type: Manufacturer/Factory, Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 7 yearsAverage Response Time: ≤4.18h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressRoom 1618, 16th Floor, Weidong Shiao International Plaza, No. 30 Hong Kong Middle Road, Qingdao 266071, CHINA
International Commercial Terms(Incoterms)FOB, EXW, CFR, CIF
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsUnderground Mining LHD, Underground Mining Loader, Underground Mining Truck

Our Industry Experience & Global Business Record

Main MarketsEastern Europe, Southeast Asia, Africa

Product Q&A

Q:What mechanical products do you mainly produce?
A:
We are producing underground mining vehicles and spare parts for metal mines.
Q:Can the technical parameters and specifications of the products be customized?
A:
Yes.
Q:Does the quotation include freight, tariffs, or insurance?
A:
Our quotations usually under CIF terms include Freight and Insurance but no Tariffs.
Q:What is the production cycle for regular orders?
A:
1 or 2 months usually. Yes and there are stock available sometime.
Q:How is transportation arranged?
A:
Our forwarder partner will arrange the proper transportation solution and can arrange the door-to-door service as well.

Send Inquiry

*To:QINGDAO ZONGDA MACHINERY CO., LTDQINGDAO ZONGDA MACHINERY CO., LTD
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Explosion-Proof Grab Equipment for Underground Hydraulic Mining
Made-in-China.com
Grab Equipment for The Withdrawal of Underground Mining Equipment
Made-in-China.com
High Rate Alluvial and Placer Mining Gold Washing Equipment
Made-in-China.com
High-Performance 4.5m³ LHD Mining Equipment for Underground Use
Made-in-China.com
Advanced Equipment for Mining Granite and Marble

Advanced Equipment for Mining Granite and Marble

US$22,000.00-25,000.00
1 Piece(MOQ)
Made-in-China.com