SourcingAI
Try for free
Powered by Made-in-China.com
Engineered Wood Flooring Prefab Houses 20FT Container House Luxury Price
US$1,100.00-1,450.00
6 Pieces

Product profile

Customization

Available

After-sales Service

3 Years

Connection Form

Welded Connection

Model NO.

zontop

Feature

Anti-Corrosion, Earthquake Resistance, Easy To Install

Install

Online or Offline

Name

Steel Structure Prefab House

Place of Origin

Shandong, China

Color

White, Blue, Green, Red, Yellow/Customerized

Service Life

30 Years

Brand Name

Zontop

Door and Window Material

Aluminium, Steel Materials and Can Be Fixed Flexib

Frame

Steel

Wall

Sandwich Wall Panels

Floor

Cement Fiber

Roof

Insulated Roof

Packing

as Client Requirement

Structure

Two Storey

Transport Package

40hq Container

Specification

6000*3000*2920mm

Trademark

ZONTOP

Origin

Weifang, Shandong, China

HS Code

9406900090

Production Capacity

18000/Month

Key features

Customizable Colors: Available in White, Blue, Green, Red, Yellow or customer-specific color cards.
Rapid Installation: Installs in 2 hours with 4 workers, requiring minimal manpower and time.
High Durability: Features waterproof, fireproof, anti-corrosion, and earthquake resistance properties.
Fast Lead Time: Regular sizes ship within 7-15 days after receiving the deposit.
Versatile Application: Suitable for offices, dormitories, warehouses, classrooms, and temporary housing.
Premium Materials: Constructed with galvanized steel frames, sandwich panels, and fiber cement floors.
Easy Disassembly: Movable design allows for easy disassembly and convenient transportation.
Proven Quality: Zero water leakage issues in overseas orders due to professional manufacturing.

Company profile

Business Type: Manufacturer/Factory, Group CorporationExport Year: 2020-02-19Nearest Port: Qing DaoAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA

AI-Powered supplier vetting

SummaryWeifang Zontop Prefab Steel Structure Co., Ltd. is a China-based limited company and manufacturer/factory offering prefab houses. It reports annual productivity of 100,000 sets, exports to multiple regions, and generally states lead times within 15 workdays in both peak and off-peak periods. Quality assurance, complaint-handling procedures, and supplier-service procedures are documented, but raw-material traceability is absent and finished-product inspections lack written records. The supplier supports customization from samples and has participated in the 134th China Import and Export Fair, but provides no overseas showroom, agent, or branch. Financial records are identified by year, but no financial performance values are provided. No SDK is available, and no customer cases are explicitly documented.
Supplier typeThe supplier is identified as a limited company, manufacturer/factory, and group corporation, while another record states it has no larger-company affiliation. Its offered product is prefab houses, and it reports six employees.
After-Sales capabilityThe supplier has a clear complaint-handling procedure with records, documented corrective and preventive-action procedures, and a service-capability assessment process. However, it has no overseas showroom, agent, or branch; the evidence supports procedural capability but not broad overseas service coverage.
R&D capabilityThe supplier offers customization from samples, indicating some product development or adaptation capability. However, it explicitly has no available SDK, and no broader R&D resources or innovation results are documented.
Production capacityThe supplier reports annual productivity of 100,000 prefab-house sets and lead times within 15 workdays during both peak and off-peak periods. It also reports 10 qualified service-capability suppliers, although the overall workforce is stated as six employees and the records do not reconcile these figures.
Customization capabilityThe supplier explicitly provides customization from samples for prefab houses. No additional customization scope, engineering resources, or formal customization process is described.

Product Q&A

Q:How much manpower and time does it take to install the container?
A:
It takes 2 hours and 4 workers to install one unit.
Q:What tools and equipment do I need to prepare for the installation of container?
A:
You need a crane, hand saw, hand drill, hexagonal screwdriver, rubber hammer, utility knife, hole saw, non-slip gloves, glass glue gun, tape measure, medical box, marker, foot ladder, and spirit level.
Q:How many days is your fastest lead time?
A:
For regular sizes, the lead time is generally 7-15 days after receiving the deposit.
Q:Can you customize colors?
A:
Yes, we accept color customization. Regular colors are White, Blue, Green, Red, and Yellow. You can also provide a color card number for reference.
Q:What is your payment method?
A:
We generally use TT (wire transfer) with a 30% deposit and the remaining 70% paid before shipment.

Send Inquiry

*To:Weifang Zontop Prefab Steel Structure Co., Ltd.Weifang Zontop Prefab Steel Structure Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like