SourcingAI
Try for free
Powered by Made-in-China.com
Zontop Building Prefabricated Luxury 20 FT Prefab Container Modular House Home
US$1,100.00-1,450.00
6 Sets

Product profile

Customization

Available

After-sales Service

3 Year

Application

Carport, Hotel, House, Kiosk, Booth

Model NO.

ZTPH0009

Material

Steel Structure

Name

20 FT 40 FT Building Shipping Modular Prefab Conta

Place of Origin

Shandong, China

Color

White, Blue, Green, Red, Yellow/Customerized

Service Life

30 Years

Brand Name

Zontop

Door and Window Material

Aluminium, Steel Materials and Can Be Fixed Flexib

Frame

Steel

Wall

Rock Wall Panels

Floor

Cement Fiber

Roof

Insulated Roof

Structure

Two Storey

Warranty

3 Year

Usage

Dormitories, Temporary Offices, Workshop

Certification

CE, ISO

Customized

Customized

Transport Package

Load in Shipping Container

Specification

steel structure, sandwich panels

Trademark

ZONTOP

Origin

Weifang, Shandong, China

HS Code

9406900090

Production Capacity

80000000/Month

Key features

Customizable Colors: Available in White, Blue, Green, Red, Yellow or customer-specific colors.
Fast Installation: Requires only 4 workers and 2 hours to install one unit.
Durable Structure: Galvanized steel frame with rock wool/EPS/PU sandwich panels for 10-20 year lifespan.
Waterproof Design: High-quality construction ensures no water leakage issues in overseas orders.
High Production Capacity: Daily output of 500 units with annual capacity of 50,000 sets.
Versatile Application: Suitable for dormitories, offices, workshops, warehouses, and temporary housing.
CE & ISO Certified: Products meet international standards with CE and ISO certifications.
Easy Transportation: Foldable and movable design allows for convenient disassembly and transport.

Company profile

Business Type: Manufacturer/Factory, Group CorporationExport Year: 2020-02-19Nearest Port: Qing DaoAverage Response Time: ≤15hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, Others, FCA

AI-Powered supplier vetting

SummaryWeifang Zontop Prefab Steel Structure Co., Ltd. is a China-based limited company and manufacturer/factory offering prefab houses. It reports annual productivity of 100,000 sets, exports to multiple regions, and generally states lead times within 15 workdays in both peak and off-peak periods. Quality assurance, complaint-handling procedures, and supplier-service procedures are documented, but raw-material traceability is absent and finished-product inspections lack written records. The supplier supports customization from samples and has participated in the 134th China Import and Export Fair, but provides no overseas showroom, agent, or branch. Financial records are identified by year, but no financial performance values are provided. No SDK is available, and no customer cases are explicitly documented.
Supplier typeThe supplier is identified as a limited company, manufacturer/factory, and group corporation, while another record states it has no larger-company affiliation. Its offered product is prefab houses, and it reports six employees.
After-Sales capabilityThe supplier has a clear complaint-handling procedure with records, documented corrective and preventive-action procedures, and a service-capability assessment process. However, it has no overseas showroom, agent, or branch; the evidence supports procedural capability but not broad overseas service coverage.
R&D capabilityThe supplier offers customization from samples, indicating some product development or adaptation capability. However, it explicitly has no available SDK, and no broader R&D resources or innovation results are documented.
Production capacityThe supplier reports annual productivity of 100,000 prefab-house sets and lead times within 15 workdays during both peak and off-peak periods. It also reports 10 qualified service-capability suppliers, although the overall workforce is stated as six employees and the records do not reconcile these figures.
Customization capabilityThe supplier explicitly provides customization from samples for prefab houses. No additional customization scope, engineering resources, or formal customization process is described.

Product Q&A

Q:How much manpower and time does it take to install the container?
A:
It requires 4 workers and 2 hours to install one unit.
Q:What tools and equipment do I need to prepare for the installation of container?
A:
You need a crane, hand saw, hand drill, hexagonal screwdriver, rubber hammer, utility knife, hole saw, non-slip gloves, glass glue gun, tape measure, medical box, marker, foot ladder, and spirit level.
Q:How many days is your fastest lead time?
A:
For regular sizes, the lead time is generally 7-15 days after receiving the deposit, depending on the quantity.
Q:Can you customize colors?
A:
Yes, we accept color customization. Regular colors are White, Blue, Green, Red, and Yellow. You can also provide a color card number for reference.
Q:What is your payment method?
A:
We generally use TT (wire transfer) with a 30% deposit and the remaining 70% paid before shipment.

Send Inquiry

*To:Weifang Zontop Prefab Steel Structure Co., Ltd.Weifang Zontop Prefab Steel Structure Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like