Powered by Made-in-China.com
Efficient Operation Trailing Suction Hopper Dredger for Port Maintenance
US$200,000.00-400,000.001 Piece
Efficient Operation Trailing Suction Hopper Dredger for Port Maintenance
US$200,000.00-400,000.00
1 Piece
Product profile
Customization
AvailableType
Trailing Suction Hopper DredgerPower Type
Hybrid Electric VehicleModel NO.
DONGNANJUN18Cyclone Type
HydrocycloneSlot Type
CTSCustomized
CustomizedCondition
NewWarranty
1 YearAfter-sales Service
SupportAuxiliary Engine Power
600 Kw/1000 R/Min*2Mud Hopper Volume
8650m³Blowing Distance
≥3kmCruising Speed
≥15 KnotsBlowing Time
95 Minutes Per ShipTransport Package
Transport PackageSpecification
117*24*8mTrademark
ZHONGSHENGOrigin
ChinaKey features
Hybrid Electric Power System: Equipped with two 4500KW MAN engines and two 600KW auxiliary engines for high efficiency.
Massive Mud Capacity: Features an 8650 cubic meter mud hopper volume for large-scale dredging operations.
Extended Blowing Distance: Capable of reaching a blowing distance of up to 3 kilometers to meet project requirements.
Deep Dredging Capability: Achieves a dredging depth of 31 to 35 meters with a 45-degree rake angle.
CCS International Certification: Built according to latest CCS specifications with drawings reviewed by Guangzhou Center.
Advanced Wave Compensation: Equipped with two heave compensators to reduce wave impact on operations.
Fast Unloading Cycle: Mud unloading time is approximately 10 minutes per ship for rapid turnaround.
Company profile

High Repeat Buyers ChoiceYears of Export ExperiencePatents AwardedLow MOQ
Business Type: Manufacturer/FactoryExport Year: 2011-07-15Nearest Port: Pingtan Port, Mawei Port, Zhoushan PortAverage Response Time: ≤0.03hTerms of Payment: T/T, LC, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW, FAS, CIP, FCA, CPT, DDP, Others
About Our Factory & Business Background
AddressNo. 16, 1st Floor, Building A, Zhongtai Yunhai Environmental Science Park, No. 99, Gaoxin Avenue, Shangjieshi Town, Minhou County, Fuzhou City, Fujian Province
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 6-12 months
Our Production Capability & Technical Expertise
Main ProductsTrailing Suction Hopper Dredger, Dredger, Cutter Suction Dredger, Mud Barge, Grab Dredger, Dredging Vessel, Sand Carrier, Hopper Dredger, Engineering Vessel, Tshd
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What is the mud hopper volume of this dredger?
A:
The mud hopper volume is 8650 cubic meters.
Q:What is the maximum blowing distance?
A:
The blowing distance is greater than or equal to 3 kilometers.
Q:What is the dredging depth capability?
A:
The dredging depth can reach 31 to 35 meters when the empty rake is extended at 45 degrees.
Q:How long does it take to unload mud?
A:
The mud unloading time is approximately 10 minutes per ship.
Q:What is the hourly dredging volume?
A:
The dredging volume per hour can reach 25000 cubic meters.
Send Inquiry
*To:
Zhongsheng Port Channel Southeast Marine Engineering Co.,Ltd
Zhongsheng Port Channel Southeast Marine Engineering Co.,Ltd*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Ready to Ship Brand New Built 8650m3 Trailing Suction Hopper Dredger with Two Tube and CCS Class for Port Construciton
US$1,500,000.00-2,400,000.00
1 Piece(MOQ)
Ready to Ship Brand New Built 8650m3 Trailing Suction Hopper Dredger with Two Tube and CCS Class for Port Construciton
US$100,000.00-1,000,000.00
1 Piece(MOQ)
Easy Operation Cutter Suction Dredger for Port Maintenance
US$458,000.00-589,000.00
1 Piece(MOQ)
Modular Disassembled Trailing Suction Hopper Dredger for Limited Dock Condition Projects
US$23,800.00-26,800.00
1 Set(MOQ)
Heavy Duty Cutter Suction Dredger 20 Inch 24 Inch Cutter Suction Dredger for Efficient Dredging Operations for Port Construction
US$65,000.00-99,999.00
1 Piece(MOQ)
Budget Small-Medium Trailing Suction Hopper Dredger for MID Scale Dredging Contracts
US$23,800.00-26,800.00
1 Set(MOQ)
Trailing Suction Hopper Dredger, Factory Direct Cummins Powered Custom Vessel for Global Dredging Reclamation Projects
US$13,600.00-13,800.00
1 Set(MOQ)
Sand Mining Trailing Suction Hopper Dredger for Deep Water Dredging and Material Transport
US$30,000.00-100,000.00
1 Piece(MOQ)
Stable Performance Trailing Suction Hopper Dredger Industrial Sand Suction Dredger for Port Maintenance
US$22,000.00-27,000.00
1 Piece(MOQ)
Eco-Friendly Small Trailing Suction Hopper Dredger for Wetland Restoration Dredging Works
US$23,800.00-46,800.00
1 Set(MOQ)
Reliable 12 Inch Cutter Suction Dredger with Underwater Pump Superior Power for Deep Dredging Efficient River Sand Mining Operations
US$63,000.00-75,000.00
1 Piece(MOQ)
18 Inch Heavy-Duty Mud Dredger for Efficient Port Operations
US$531,600.00
1 Piece(MOQ)
Advanced Cutter Suction Dredger for Efficient Port Channel Operations
US$50,000.00-150,000.00
1 Set(MOQ)
Cost Efficient 8 Inch Sand Recovery Dredger for Commercial River Maintenance and Mining Operations
US$120,000.00-680,000.00
1 Set(MOQ)
Mobile Easy Operation Cutter Suction Sand Dredger for Port Maintenance
US$350,000.00-1,500,000.00
1 Set(MOQ)
High Power Zhd-Dredge Cutter Suction Dredger for Efficient Dredging Operations
US$450,000.00-550,000.00
1 Piece(MOQ)
5500m3 Self-Propelled Dredging Ships (TSHD) Trailing Suction Hopper Dredger for Port Maintenance in Asia Iran
US$3,000,000.00-4,000,000.00
1 Set(MOQ)
High Power Eco-Dredge Cutter Suction Dredger for Efficient Dredging Operations
US$614,285.71
1 Piece(MOQ)
Customized Large 9000m3 Dredge Machine Sand Trailing Suction Hopper Dredger for River Lake Port Dredging
US$4,000,000.00-6,000,000.00
1 Set(MOQ)
Custom Hydraulic Dredger for Efficient Port Maintenance Operations
US$50,000.00-150,000.00
1 Set(MOQ)



















