SourcingAI
Try for free
Powered by Made-in-China.com
Premium Closed Cat Litter Box with Advanced Odor Control
US$10.50
500 Pieces

Product specifications

Color

Sample price:US$10.50/piece.Request sample

Product profile

Customization

Available

Type

Cat Litter Box

Cleaning Products Type

Toilet Products

Model NO.

XMGC-A2

Grooming Products Type

Cat Litter Box

Application

Cat

Operation Type

Manual

Size

Small

Waterproof

Waterproof

Packaging

Box

Transport Package

Box

Specification

580*370*130mm

Trademark

GOAL

Origin

China

HS Code

3924900000

Production Capacity

5000

Key features

Splash-Proof Design: Heightened fence and splash-proof pedal prevent litter scattering.
Premium Materials: Constructed from corrosion-resistant stainless steel and durable ABS.
Easy Maintenance: Detachable design allows for instant rinsing and simple cleaning.
Odor Control: Non-absorbent materials rinse clean instantly, preventing odor buildup.
Customization Options: Available in multiple colors and supports full or minor customization.
Durable Pedal: Stainless steel pedal offers good load-bearing capacity and stability.
Comprehensive Warranty: 1-year warranty covers factory defects with free replacement units.
Certified Quality: Product holds CE certification and factory has ISO9001:2015 certification.

Company profile

Zhongshan Goal Electrical Appliances Co., Ltd.
Experienced TeamYears of Export ExperienceHigh Repeat Buyers ChoiceProduct Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 22 years CertifiedNearest Port: Zhongshan PortAverage Response Time: ≤5.42h

AI-Powered supplier vetting

SummaryThe supplier is a manufacturing factory located in Zhongshan, offering extensive customization services and notable production capabilities with an annual output exceeding 2 million units. They hold ISO9001:2015 and CE certifications, indicating a commitment to quality standards. Despite strong financial indicators over the past three years, the supplier does not manage overseas warehouses or showrooms, limiting their international service footprint. Their after-sales service procedures are well-documented, including effective customer complaint handling, although no overseas service presence is noted. The supplier actively participates in trade shows like the Canton Fair and supports well-known brands with OEM services.
Supplier typeThe supplier is classified as a manufacturing factory located in Zhongshan.
CertificationsThe supplier holds ISO9001:2015 and CE certifications, demonstrating adherence to quality and safety standards.
After-Sales capabilityThe supplier has written procedures for effective after-sales service, including a clear mechanism for handling customer complaints.
Financial creditThe supplier shows strong financial performance with consistent figures over the past three years.
R&D capabilityThe supplier has R&D capabilities with recent new products and offers ODM services, but lacks SDK availability.
Production capacityWith an annual output of over 2 million units, the supplier supports flexible OEM/ODM customization and low MOQ.
Customization capabilityThe supplier provides a range of customization options from full to minor, including flexible solutions.
Client casesThe supplier provides OEM services to well-known brands, indicating established client relationships.

Product Q&A

Q:What is the lead time for orders?
A:
Usually 30-35 days for MOQ orders. For larger quantities or peak seasons, lead time is discussed based on the actual production plan.
Q:What are the payment terms?
A:
We accept T/T or Irrevocable L/C at sight.
Q:How is the warranty and after-sales service?
A:
We provide a 1-year warranty upon arrival at POD. If defects are confirmed due to factory responsibility, we replace defective units for free with new orders.
Q:What is the MOQ for customized orders?
A:
Usually 1,000 pcs for customized orders. For first trial orders, further discussion is possible.
Q:How long does it take to get a sample?
A:
Samples will be ready for delivery in 5-7 days. Free samples are available if in stock, but freight is paid by the buyer.

Send Inquiry

*To:Zhongshan Goal Electrical Appliances Co., Ltd.Zhongshan Goal Electrical Appliances Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like