Powered by Made-in-China.com
Efficient Gold Mining Equipment with Large Processing Capacity Design
US$3,900.00
1 Piece
Product profile
Customization
AvailableType
Gravity SeparatorVoltage
Custom MadeModel NO.
GMTS0519Weight
650kgMaterial
Carbon SteelMaterial Feature
Fire ResistantCertification
ISO9001:2008Energy Saving
Energy SavingWarranty
1 YearColor
Custom MadeCustomized
CustomizedCondition
NewAfter-sales Service
One-Year Remote WarrantyProduct Name
Gold Panning Trommel ScreenAdvantage
High OutputFeature
Large Processing CapacityFunction
Screening\Separation\Sorting\Sieving\GradingUsage
SortingTransport Package
Custom MadeSpecification
custom madeTrademark
SinolionOrigin
ChinaKey features
High Recovery Rate: Achieves 98% gold recovery using trommel screen and sluice box combination.
Large Processing Capacity: GMTS 0519 model handles 5-10 tons per hour efficiently.
Customizable Voltage: Voltage is custom made to meet specific power requirements.
Customizable Color: Color is custom made to match client preferences.
Fire Resistant Material: Constructed from carbon steel with fire resistant features.
One-Year Warranty: Includes one-year remote warranty and affordable spare parts.
Flexible Power Options: Supports motor, diesel engine, and generator sets.
ISO9001 Certified: Manufacturing process certified under ISO9001:2008 standards.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤3.59h
About Our Factory & Business Background
Address3rd Floor, Building 8, Yida Technology City, Lianhua Street, West Fourth Ring Road, High-tech Zone, Zhengzhou City, Henan Province
Plant Area4833 square meters
Number of Employees68
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners28
Our Production Capability & Technical Expertise
Main ProductsMobile Trommel Screen, Trommel Screen, Garbage Sorting Plant
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2019-07-19
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Australia, Domestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff9
Overseas Agent/BranchYes
Product Q&A
Q:How long does installation take?
A:
Installation takes 7-10 days if ready.
Q:What is the overseas service fee?
A:
Includes airline tickets, visa fees, salaries.
Q:Are you a manufacturer or trading company?
A:
We are a factory, established in 1993.
Q:What services do you offer?
A:
Engineers design lines, pre-check, approve products, offer technical guidance.
Q:What is your delivery time?
A:
7-10 days for stock, 15-30 days for large orders.
Send Inquiry
*To:
HENAN SENKE EQUIPMENT CO., LTD
HENAN SENKE EQUIPMENT CO., LTD*Content:
Supplier replies will be sent to your registered email
You may also like
Large-Scale Gold Washing Drum Equipment with Integrated Cleaning & Screening for River-Gold-Mining
US$35,800.00-38,800.00
1 Set(MOQ)
Large-Scale Gold Mining Equipment with Smelting-Furnace for Alluvial-Gold-Processing
US$32,800.00-34,720.00
1 Set(MOQ)
Alluvial Gold Mining Equipment for Efficient Ore Processing Plants
US$5,978.00
1 Piece(MOQ)
Large-Scale Gold Trommel Equipment with Modular-Design for Desert Gold Mining
US$35,800.00-38,800.00
1 Set(MOQ)
Large-Scale Gold Washing Drum Equipment with Anti-Blocking Design for Alluvial-Gold-Processing
US$35,800.00-38,800.00
1 Set(MOQ)
Dry Washer Gold Mining Equipment with Large Capacity Features
US$3,900.00
1 Piece(MOQ)
Compact Gold Mining Equipment with Advanced Trommel Screen Design
US$3,900.00
1 Piece(MOQ)
China Manufacturing Efficient Extraction Gold and Diamond Mining Equipment for Processing
US$45,000.00
1 Piece(MOQ)
Gold Mining Equipment with High Output Trommel for Easy Use
US$3,900.00
1 Piece(MOQ)
Mini Gold Mining Equipment with Large Capacity Trommel Screen
US$3,900.00
1 Piece(MOQ)
High-Capacity Alluvial Gold Mining Equipment for Africa with Efficient Recovery and Durable Performance
US$25,000.00-48,000.00
1 Piece(MOQ)
Large Processing Volume Washing Plant Alluvial Gold Mining Equipment with ISO9001: 2008
US$5,978.00
1 Piece(MOQ)
Alluvial Gold Mining Equipment with Customizable Processing Capacity
US$5,978.00
1 Piece(MOQ)
Competitive Pricing Alluvial Gold Mining Washing Equipment for Efficient Recovery with Trommel
US$65,000.00-95,000.00
1 Piece(MOQ)
Efficient Extraction Gold Mining with Sluice Box Waste Sorting Equipment
US$5,000.00-150,000.00
1 Piece(MOQ)
Large Processing Volume Gravity Separator Gold Washing Machine Mining Equipment
US$5,978.00
1 Piece(MOQ)
Reasonable Design Land Gold Mining Equipment with Agitation Chute
US$40,000.00-300,000.00
1 Set(MOQ)
Gold Mining Equipment with Forced Oil Circulation and Large Bowl
US$3,000.00-5,000.00
1 Piece(MOQ)
Gold Washing Equipment with Conveyor Mining Machine Processing Plant
US$35,000.00
1 Set(MOQ)



















