Powered by Made-in-China.com
Large Processing Capacity Gold Mining Machine for Effective Results
US$3,900.001 Piece
Large Processing Capacity Gold Mining Machine for Effective Results
US$3,900.00
1 Piece
Product profile
Customization
AvailableType
Gravity SeparatorVoltage
Custom MadeModel NO.
GMTS0519Weight
650kgMaterial
Carbon SteelMaterial Feature
Fire ResistantCertification
ISO9001:2008Energy Saving
Energy SavingWarranty
1 YearColor
Custom MadeCustomized
CustomizedCondition
NewAfter-sales Service
One-Year Remote WarrantyProduct Name
Gold Panning Trommel ScreenAdvantage
High OutputFeature
Large Processing CapacityFunction
Screening\Separation\Sorting\Sieving\GradingUsage
SortingTransport Package
Custom MadeSpecification
custom madeTrademark
SinolionOrigin
ChinaKey features
High Gold Recovery Rate: Achieves over 98% gold recovery using trommel screen, sluice box, and centrifugal methods.
Large Processing Capacity: Handles 5-10 tons per hour, ideal for alluvial, river, and placer gold mining.
Mobile and Portable Design: Mounted on a trailer for easy movement, reducing transportation and infrastructure costs.
Customizable Specifications: Voltage, color, and product name are customizable to meet specific project needs.
Energy Efficient Operation: Features energy-saving design with low power consumption of 1.5kw.
Durable Carbon Steel Build: Constructed from fire-resistant carbon steel for long-lasting performance.
One-Button Diesel Start: Easy operation with a simple one-button diesel start mechanism.
Comprehensive Warranty: Provides a 1-year warranty with remote support and affordable spare parts.
Company profile

Customization from DesignsSelf-brandedProduct CertificationImporters and Exporters
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.02h
About Our Factory & Business Background
Address3rd Floor, Building 8, Yida Technology City, Lianhua Street, West Fourth Ring Road, High-tech Zone, Zhengzhou City, Henan Province
Plant Area4833 square meters
Number of Employees68
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners28
Our Production Capability & Technical Expertise
Main ProductsMobile Trommel Screen, Trommel Screen, Garbage Sorting Plant
Production MachinesShearing machine, Bending machine, Sawing machine, Maching equipment, Painting line
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2019-07-19
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Australia, Domestic
Repeat Buyers Choice30%~50%
Product Q&A
Q:What is the processing capacity of the GMTS 0519?
A:
The capacity is 5-10 tons per hour.
Q:How long does installation take?
A:
Installation takes 7-10 days if ready.
Q:What is the overseas service fee?
A:
Includes airline tickets, visa fees, and salaries.
Q:Are you a manufacturer or trading company?
A:
We are a factory, established in 1993.
Q:What is your delivery time?
A:
7-10 days for stock items, 15-30 days for large orders.
Send Inquiry
*To:
HENAN SENKE EQUIPMENT CO., LTD
HENAN SENKE EQUIPMENT CO., LTD*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Portable Gold Mining Machine with High Output Processing Capacity
US$3,900.00
1 Piece(MOQ)
Competitive Pricing 200tons/H Capacity Land-Use Sand Mining Machinery for Efficient Gold/Diamond Processing
US$55,000.00-95,000.00
1 Piece(MOQ)
High-Capacity Gold Shaker Large-Scale Automatic Gold Washing Machine with High-Manganese for Placer-Gold-Mining
US$32,800.00-34,720.00
1 Set(MOQ)
Mini Gold Mining Machine Featuring Large Processing Capacity Design
US$3,900.00
1 Piece(MOQ)
Easy Maintenance Gold Gravity Machine for Mining Processing
US$115,000.00
1 Set(MOQ)
High Capacity Jt6-3 Saw-Tooth Wave Jig Machine for Gold Ore Processing
US$12,000.00-13,000.00
1 Piece(MOQ)
High Capacity Xrt Ore Sorting Machine for Copper Gold Tungsten and Mineral Processing
US$200,000.00-300,000.00
1 Piece(MOQ)
High Output Mini Gold Mining Machine for Efficient Gold Recovery
US$3,900.00
1 Piece(MOQ)
Ffd Jig Machine for Mineral Processing Plant Jig Machine for Large Particles and High Capacity Mining Beneficiation
US$3,700.00-25,999.00
1 Piece(MOQ)
Large Capacity Gold Washing Machine for Optimal Processing Efficiency
US$3,900.00
1 Piece(MOQ)
Heavy Duty Sawtooth Wave Jigging Machine Diamond Gold Jig Machine for Mineral Processing
US$13,500.00
1 Set(MOQ)
Portable Alluvial Gold Wash Machine for Mining Processing Plant
US$28,000.00-43,000.00
1 Set(MOQ)
Large-Capacity Gold-Trommel-Screen 100 Tons/Hour Alluvial Gold Wash Machine with 85~90%-Recovery-Rate for Riverbed-Mining
US$35,800.00-38,800.00
1 Set(MOQ)
Large Capacity Gold Mining Equipment Mobile Gold Trommel Machine
US$5,500.00-6,500.00
1 Set(MOQ)
50t/H to 200t/H Land Gold Washing Machine for High-Capacity Alluvial Gold Processing and Recovery
US$32,900.00-45,830.00
1 Set(MOQ)
Large Centrifugal Gold Mining Machine for Ore Tailings Processing
US$1,536.00
1 set(MOQ)



















