SourcingAI
Try for free
Powered by Made-in-China.com
Professional Gold Cil Process Plant for Advanced Gold Mining Equipment
US$50,000.00
1 Piece

Product profile

Customization

Available

Type

Flotation Separator

Voltage

Customizable

Model NO.

CIL CIP

Weight

Customizable

Material

Carbon Steel

Material Feature

Oil Resistant

Certification

ISO9001:2008, ISO9001:2000, CE

Energy Saving

Energy Saving

Warranty

1 Year

Color

Multi Color

Customized

Customized

Condition

New

After-sales Service

One-Year Remote Warranty

Transport Package

Customizable

Specification

Customizable

Trademark

Sinolion

Origin

China

Production Capacity

300pieces/Year

Key features

High Gold Recovery Rate: Achieves over 99% gold recovery with optimized production lines minimizing loss.
Eco-Friendly Solutions: Complies with regulations using safe cyanide alternatives and energy-efficient designs.
Customizable Parameters: Voltage and weight are customizable to fit specific mining operation requirements.
Comprehensive Warranty: Provides a 1-year warranty with remote technical support for all equipment.
Proven Global Experience: 30+ years of manufacturing experience serving clients in Africa, Asia, and Americas.
Integrated CIL Process: Combines leaching and adsorption simultaneously for efficient gold extraction.
High Purity Output: Cyanidation process ensures gold purity of at least 99% with minimal losses.
Full Service Support: Offers installation, maintenance, and on-site technical support globally.

Company profile

HENAN SENKE EQUIPMENT CO., LTD
Customization from DesignsSelf-brandedProduct CertificationImporters and Exporters
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.34h

About Our Factory & Business Background

Address3rd Floor, Building 8, Yida Technology City, Lianhua Street, West Fourth Ring Road, High-tech Zone, Zhengzhou City, Henan Province
Plant Area4833 square meters
Number of Employees68
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners28

Our Production Capability & Technical Expertise

Main ProductsMobile Trommel Screen, Trommel Screen, Garbage Sorting Plant
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2019-07-19
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Australia, Domestic
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff9
Overseas Agent/BranchYes

Product Q&A

Q:What are CIL and CIP?
A:
CIL is carbon-in-leach, combining cyanidation and leaching. CIP is carbon-in-pulp, where heap leaching solution undergoes carbon adsorption for gold recovery.
Q:What is the difference between CIL and CIP?
A:
CIL suits cyanide gold extraction with <500 tons/day, requiring lower investment for small-scale ops, enabling faster gold recovery. CIP is for >500 tons/day capacities.
Q:What are the advantages of the cyanidation gold extraction process?
A:
Cyanidation maximizes gold recovery from ore, minimizes losses, achieving high purity of at least 99%.
Q:Are there specific requirements for carbon in the cyanidation gold extraction process?
A:
Activated carbon adsorbs gold-cyanide complexes post-cyanidation. Nut shell carbon shows good adsorption; coconut shell carbon is optimal.
Q:What reagents are required?
A:
Cyanide is crucial in cyanidation gold extraction, with ion concentration affecting leaching efficiency, typically between 0.03% and 0.1%. Alkaline substances (sodium hydroxide or quicklime) maintain slurry pH between 10 and 12, preventing cyanide loss to other metals.

Send Inquiry

*To:HENAN SENKE EQUIPMENT CO., LTDHENAN SENKE EQUIPMENT CO., LTD
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Cil Process Plant Gold Mining Extraction Machine Equipment
Made-in-China.com
Chinagold Mining Equipment Mine Washing Plant for Gold Mining
Made-in-China.com