Powered by Made-in-China.com
Zulin High quality Slab and Floor Formwork for Concrete Pouring
US$55.00-101.00
500 Square Meters
Product profile
Customization
AvailableAfter-sales Service
Online Technical SupportWarranty
1 YearCertification
ISOMaterial
Steel WoodType
Slab FormworkColor
Yellow, Blue or CustomizedLength
3300~5000 mmWidth
2440~3600 mmThickness of Slab
100~500mmBearing Capacity
5~15kn/Square MeterAuxiliary Equipment
Lifting Fork, Shifting TrolleyCertificate
SGS / ISO9001:2015Application
Slab PouringTransport Package
Package Box, Steel Pallet, Steel Frame, ContainerSpecification
2440*4880mm, 3300*5000mmTrademark
ZULINOrigin
ChinaProduction Capacity
15000 Square Meters/MonthKey features
Customizable Dimensions: Length 3300-5000mm, Width 2440-3600mm, Thickness 100-500mm, and Color options.
High Bearing Capacity: Supports 5-15KN/sqm with lifting fork load 10-15KN and trolley load 11-20KN.
Versatile Application: Suitable for slabs, high-rise buildings, bridges, stadiums, and hydropower stations.
Cost-Effective Design: Simple structure and flexible adaptation to any ground plan and floor height.
ISO & SGS Certified: Manufactured under ISO9001:2015 standards with SGS certification available.
Complete Service Support: Includes remote/on-site instruction, layout drawings, and online technical support.
Proven Track Record: Completed 600+ projects including PAFC, Beijing Nest Stadium, and Hong Kong-Zhuhai-Macau Bridge.
OEM/ODM Capability: Offers custom manufacturing services with dedicated R&D engineers and production facilities.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2017-11-01 CertifiedNearest Port: Tianjin PortAverage Response Time: ≤8.71h CertifiedTerms of Payment: LC, T/T
AI-Powered supplier vetting
SummaryBeijing Zulin Formwork & Scaffolding Co., Ltd. is a China-based limited company established in 2003, with 281 employees, a 40,000 m² manufacturing plant, four production lines, and stated manufacturing capabilities in formwork and scaffolding. It reports ISO 9001:2015 certification, 10 R&D engineers, 11–20 quality-control staff, and production capacities across climbing formwork, wall and column formwork, table formwork, timber beams, and ring-lock scaffolding. Zulin states that it serves domestic and overseas markets through multiple branches, exports to several regions, and has participated in major construction projects. Its after-sales capability and innovation claims are supported by company statements, while financial credibility cannot be assessed because financial figures are excluded.
Supplier typeThe supplier is identified as a combined, limited company headquartered in Beijing, while another record describes its company nature as a trading company. Its business scope and product keywords also explicitly cover manufacturing and processing machinery and construction products, indicating a mixed manufacturing and trading profile.
CertificationsThe supplier explicitly reports holding an ISO 9001:2015 certificate. This provides direct evidence of a certified quality-management system, although no additional certifications are listed.
After-Sales capabilityZulin states that it has established cooperative relationships through high-quality products and comprehensive after-sales service. This is supported by its stated domestic and overseas branch network, but no specific service response times, service locations, or staffing details are provided.
R&D capabilityThe supplier reports 10 years of total R&D engineer experience, numerous intellectual property rights, hydraulic climbing formwork technologies, and capabilities for multiple formwork types. These statements provide direct evidence of technical development activity, although the specific patents or R&D team size are not detailed.
Production capacityZulin reports a 40,000 m² manufacturing plant, four production lines, 281 employees, and stated annual capacities including 3,000 climbing-formwork sets, 3,000 wall and column formwork sets, 5,000 table-formwork sets, 10,000 tons of ring-lock scaffolding, and 1,000,000 meters of timber beams. These figures directly support substantial production capability across several product categories.
Customization capabilityThe supplier states that its products can meet requirements across high-rise buildings, bridges, and hydraulic engineering, and that its production design ability enables it to design complex and difficult projects. Its listed products include multiple specialized formwork and scaffolding systems, supporting customization capability, although no formal customization process or project-specific technical metrics are provided.
Client casesZulin states that it has participated in notable domestic and international projects, including Shenzhen Ping An IFC, the Nest, the CCTV new site, Suramadu Bridge, and Kuwait Police College. It also reports relationships with many Chinese and foreign enterprises and multiple domestic and overseas branches, providing direct evidence of project and international customer experience.
Product Q&A
Q:What types of projects can this formwork be used for?
A:
It is widely used for concrete pouring in housing, multi-story structures, high-rise buildings, towers, sports stadiums, bridges, hydropower stations, and industrial structures.
Q:What information is needed to get a design and quotation?
A:
You need to provide structural drawings and section drawings of the construction project.
Q:How long does it take to receive a design and quotation?
A:
Generally, it takes 5-7 days after receiving the structural drawings, depending on specific project requirements.
Q:What is the manufacturing lead time after signing the contract?
A:
It typically takes 30-60 days based on the type and quantity of products to be produced.
Q:Are the products available for leasing?
A:
Yes, products are available for leasing in Indonesia, Singapore, Dubai, Australia, and New Zealand, subject to local regulations.
Send Inquiry
*To:
Beijing Zulin Formwork & Scaffolding Co., Ltd
Beijing Zulin Formwork & Scaffolding Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Factory Durable Flexible Wall Column Slab Steel Aluminum Frame H20 Timber Beam Formwork for Assorted Concrete Building
US$70.00-80.00
300 Square Meters(MOQ)
Lianggong High Strength Adjustable Drop Head Slab and Timber Beam Formwork for Efficient Concrete Slab and Beam Pouring
US$68.00-88.00
10 Square Meters(MOQ)
High-Quality Steel Formwork System for Durable Concrete Walls and Slabs
US$100.00-120.00
500 Square Meters(MOQ)
China High Quality Concrete Metal Steel Tunnel Slab Formwork for Similar to Mesa
US$1,000.00-1,200.00
50 Square Meters(MOQ)
Lianggong Building Construction Material Steel Frame and Plywood Drop Head Slab Formwork for Concrete Pouring
US$900.00-1,300.00
10 Tons(MOQ)
High-Quality Reusable Formwork System for Concrete Sustainable and Long-Lasting in Construction Use
US$78.00-128.00
500 Square Meters(MOQ)
Lianggong Labor-Saving Large Area Slab Table Formwork for Concrete Pouring
US$70.00-90.00
100 Square Meters(MOQ)
Safety and Efficiency Tested Slab Concrete Formwork for Floors and Roofs
US$80.00-120.00
100 Pieces(MOQ)
Lianggong Building Construction Material Lightweight High Quality Steel Drop-Head Slab Formwork for Concrete Pouring
US$900.00-1,300.00
10 Tons(MOQ)
High Quality and High Efficency Concrete Slab Formwork System for Concrete Construction
US$50.00-70.00
1,000 Pieces(MOQ)
Reusable Aluminium Formwork for Concrete Pouring in Industrial Warehouse and Villa
US$28.00-100.00
1 Piece(MOQ)
Premium High-Quality Concrete Formwork Solution Trusted for Precision and Durability in Construction
US$78.00-128.00
500 Square Meters(MOQ)
High-Quality Aluminum Alloy Formwork for Commercial Concrete Floor Project
US$80.00-110.00
50 Square Meters(MOQ)
High Quality Modular Floor Slab Formwork for School Teaching Building
US$70.00-100.00
50 Square Meters(MOQ)



















