SourcingAI
Try for free
Powered by Made-in-China.com
Durable Plastic Flat Modular Belt for Efficient Bottle Transport
US$55.00
5 Square Meters

Product profile

Customization

Available

Material

Plastic

Feature

Acid And Alkali Resistant, Tear-Resistant, Heat-Resistant, Cold-Resistant, Wear-Resistant

Model NO.

ZE200A

Tensile Strength

Strong

Pitch

25.4 mm

Factory

Zhejiang

Chain Material

POM, PA, PP, PE.

Rod Material

PP, PA, PE.

Rod Diameter

4.6 mm

Width 1

75*N

Color

Customized

Min. Back Flex

30mm

Width 2

75+15*N

Transport Package

Carton

Specification

Optional

Trademark

zuoer

Origin

China

HS Code

8431390000

Key features

Customized Color Options: Color is customizable to meet specific market positioning needs.
Rapid Production Capability: First batch production within 5 days after mold readiness.
OEM/ODM Support: Full customization services including exclusive labels and brand markings.
Durable Material Composition: Constructed from POM, PA, PP, PE with high tensile strength.
Versatile Application Scenarios: Suitable for food, packaging, logistics, and manufacturing industries.
Strict Quality Control: Full process control with source traceability and pre-production samples.
Flexible MOQ Policy: No strict minimum order quantity requirements for various scales.
Tiered Pricing Strategy: Larger order quantities receive greater discounts.

Company profile

SHANGHAI ZUOER TRANSMISSION EQUIPMENT CO., LTD.
Importers and ExportersYears of Export ExperienceHigh Repeat Buyers ChoiceExperienced Team
Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤5.01h

AI-Powered supplier vetting

SummaryZuo' Er is a supplier with a strong focus on conveyor systems and related components. They have substantial production capabilities with over 10 production lines and a robust export market presence. While they offer customization services and have ODM/OEM capabilities, their innovation in terms of new product development is limited. Although they have clear procedures for quality assurance and customer complaints, they lack overseas warehousing and showroom services. Their financial credibility is not clear, but they have been operational in international markets since 2017.
Supplier typeZuo' Er specializes in conveyor systems and related components, with a production base in China and a focus on international markets.
CertificationsThe supplier holds a CE certification, indicating compliance with European standards for health, safety, and environmental protection.
After-Sales capabilityThe company has clear procedures for handling customer complaints and offers maintenance, repair, and training services in Europe.
R&D capabilityWhile the supplier offers 3D design services, they have not developed new products in the past year.
Production capacityThe supplier operates over 10 production lines, with a significant annual output and a global export presence.
Customization capabilityThe supplier provides customization services and has both ODM and OEM capabilities.

Product Q&A

Q:Are samples available and what are the shipping costs?
A:
We provide free samples for testing and evaluation. However, the shipping cost must be borne by the customer. Shipment is arranged after confirming recipient information.
Q:How do you ensure product quality?
A:
We implement a strict full process quality control system including standardized production processes, source traceability from raw materials to finished products, and pre-production sample confirmation before mass production.
Q:Do you offer customization and OEM/ODM services?
A:
Yes, we support in-depth customized services. Beyond conventional colors, designs, and textures, we can customize exclusive labels, packaging labels, and brand markings to meet your market positioning.
Q:What is the Minimum Order Quantity (MOQ)?
A:
We generally do not set strict MOQs to support procurement needs of various scales. Specific pricing plans are calculated based on your expected purchase quantity.
Q:What is the lead time for production?
A:
The first batch of products can be produced within 5 days after the mold is ready. Peak season lead time is 6-12 months, while off-season lead time is one month.

Send Inquiry

*To:SHANGHAI ZUOER TRANSMISSION EQUIPMENT CO., LTD.SHANGHAI ZUOER TRANSMISSION EQUIPMENT CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Opb Large Pitch Modular Conveyor Belt for Efficient Transport
Made-in-China.com