Powered by Made-in-China.com
Wet Pan Mill Equipment for Gold Ore Crushing Grinding Recover
US$6,552.00-7,656.00
1 set
Product profile
Customization
AvailableType
Wet Pan MillMotor Type
AC MotorModel NO.
1500Motor Power
22kw Level 6Rotationl Speed
23-25r/minApplication
Gold Mining, Gold Ore Grinding, Mineral BeneficiatMaterials
Rock Gold, Alluvial Gold, Quartz Gold OreCondition
NewWarranty
1 YearAfter-sales Service
1 YearModel
1500Roller Diameter
1500mm*2 RollersRoller Thickness
350mmMotor
22kw Level 6Speed Reducer
500Production Capactity
2-3(T/H)Weight
11.8tExternal Dimensions
2800×2800×2500mmBasin Diameter
2800mmPelvic Floor Diameter
2050mm20-Foot Container Volume
2(Pieces)Transport Package
Wooden CaseSpecification
2800×2800×2500 mmTrademark
RutongOrigin
ChinaProduction Capacity
1000pieces/YearKey features
High grinding efficiency, improve gold recovery rate
Thickened wear-resistant wheels, long service life
Simple structure, easy installation and maintenance
Low energy consumption, save production cost
Suitable for rock gold and alluvial gold processing
Custom voltage and model available
Company profile
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.73h CertifiedTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressBuilding 1, Haobuska, Zhengshang, Shihe Road, Gongyi City, Zhengzhou, Henan, China
Registered Capital1,300,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month, 1-3 months Off Season Lead Time: within 15 workdays, one month, 1-3 months
Minimum Order Quantity1 unit
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsDouble Shaft Shredder, Plastic Crusher, Single Drive Double Shaft Shredder, Copper Wire Granulator, Jaw Crusher, Hammer Crusher, Metal Crusher, Tire Shredder, Metal Briquetting Machine, Single Shaft Shredder
Our Industry Experience & Global Business Record
Year of Establishment2019-04-28
Main MarketsDomestic
Repeat Buyers Choice30%~50%
Overseas Agent/BranchNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What kind of ore can this wet pan mill process?
A:
It is suitable for rock gold, alluvial gold and quartz gold ore, widely used in small gold mines.
Q:What is the working principle of the wet pan mill?
A:
Two heavy rollers rotate and grind the ore, to separate gold from gangue by wet grinding.
Q:Can you customize the machine voltage for our local power grid?
A:
Yes. We can customize the motor voltage according to your country's requirement.
Q:What is the output capacity of the wet pan mill?
A:
The output capacity varies according to different machine models.
Q:What are the wearing parts of the machine?
A:
The main wearing parts are grinding rollers and liner plates, we can supply spare parts.
Send Inquiry
*To:
Zhengzhou Rutong Machinery Equipment Co., Ltd.
Zhengzhou Rutong Machinery Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Industrial Wet Ball Mills Gold Ore Fine Grinding Wet Grinding Equipment
US$5,500.00
1 Piece(MOQ)
Gold Pan Mill Equipment for Maximum Gold Recovery Efficiency
US$650.00-5,000.00
1 Piece(MOQ)
High-Quality Mining Equipment for Gold Lead Zinc and Copper Ore Grinding Mill
US$3,000.00-6,000.00
1 Set(MOQ)
Wet Disc Mill Professional Gold Extraction Grinding Equipment
US$12,000.00
1 Piece(MOQ)
Overflow Wet Ball Mill Mining Equipment for Gold Ore Mineral Machine
US$10,000.00-600,000.00
1 set(MOQ)
Nile Machinery High-Quality Gold Ore Grinding Equipment Sold Directly From Chinese Factories
US$3,900.00-4,100.00
1 Piece(MOQ)
Ball Milling Equipment for Gold Ore Grinding Processing
US$147,000.00-150,000.00
1 Set(MOQ)
Disc Mill Ore Wet Mill New Type of Metal Ore Grinding Equipment
US$3,000.00-6,000.00
1 Set(MOQ)
Mining Clinker Ore Slag Grinding Ball Mill Equipment for Tailing Processing for Gold Chrome Cement and Copper Ore
US$1,500.00-3,500.00
1 Set(MOQ)
Durable Rock Grinding Equipment for Gold Ore Mineral Processing
US$4,500.00-6,000.00
1 Piece(MOQ)
Double-Wheel Stone Wet Grinding Mill 1100 Wet Pan Gold Extraction Equipment
US$4,500.00
1 Piece(MOQ)
Supply New Type of Double-Wheel Wet Gold Grinder, Wheel Wet Pan Mill, Beneficiation Grinding Equipment
US$4,100.00-4,300.00
1 Piece(MOQ)
Innovative Rock Grinding Equipment for Gold Mining Operations
US$4,500.00-6,000.00
1 Piece(MOQ)
900*3000 Gold Processing Ball Mill Wet Small-Capacity Continuous Grinding Equipment
US$5,500.00
1 Piece(MOQ)
Ore Wet Ball Mill Small Scale Gold Mining Equipment
US$2,000.00-30,000.00
1 set(MOQ)
Grinding Ball Mill Small Scale Gold Mining Equipment for Gold Mining
US$7,000.00-8,000.00
1 Piece(MOQ)



















