SourcingAI
Try for free
Powered by Made-in-China.com
Lab PLD Pulsed Laser Deposition Coating Equipment
US$65,000.00-80,000.00
1 set

Product profile

After-sales Service

on-Line Service

Warranty

1 Year

Type

Spin Coating

Model NO.

TN-PLD

Coating

Vacuum Coating

Substrate

Steel

Certification

CE

Condition

New

Production Name

PLD Coating Equipment

Chamber Material

SS304

Voltage

3 Phase 380V

Pulased Laser

Optional

Transport Package

Fumigated Wooden Box

Specification

2000*2500mm

Trademark

TN

Origin

China

HS Code

8486209000

Production Capacity

20

Key features

Multi-Target Rotation System: Supports 4 targets with independent rotation (5-50 rpm) to prevent cross-contamination.
Ultra-High Vacuum Performance: Ultimate vacuum better than 5x10^-5 Pa with leakage rate <5.0x10^-8 Pa.l/s.
Versatile Material Growth: Ideal for optical crystals, superconductors, and complex layered superlattice thin films.
Customizable Laser Source: Pulsed laser source is optional, allowing customization based on specific research needs.
Robust Chamber Construction: Made of 1Cr18Ni9Ti stainless steel with argon arc welding and matte surface treatment.
Flexible Customization Options: Supports full customization, minor customization, and design-based modifications.
Comprehensive Control System: PLC + 7-inch touch screen control for vacuum, rotation, and heating processes.

Company profile

CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Shanghai Port; Qingdao PortAverage Response Time: ≤3.73h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressRoom 401, 4th Floor, Building 5, Zhengzhou Yida Science and Technology New City, Jinzhan Street, Zhengzhou High-tech Zone
Plant Area100 square meters
Number of Employees13
Registered Capital100,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 PC
Supply Chain Partners10

Our Production Capability & Technical Expertise

Main ProductsEvaporation Coater; Film Coater
Production Lines2
Production MachinesBench Drill, Lathe, Welding Machine
QA/QC inspectors3 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers4 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2017-04-19
Main MarketsNorth America
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are a professional manufacturer of laboratory instruments with a professional R&D team and workshop, ensuring quality and after-sale service.
Q:What is the warranty period?
A:
Our warranty is 12 months, and we provide lifetime maintenance with 24 hours on-line service.
Q:How long is the delivery time?
A:
In-stock items take 5-10 days. Customized products usually take 30-60 days depending on your requirements.
Q:What are the power supply and plug standards?
A:
We can provide products according to your local voltage and plug standard.
Q:What payment methods do you accept?
A:
We accept T/T, L/C, D/P, PayPal, Western Union, and Small-amount payment.

Send Inquiry

*To:Zhengzhou CY New Materials Technology Co., Ltd.Zhengzhou CY New Materials Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Metal Lab Powder Coating Equipment L-02c

Metal Lab Powder Coating Equipment L-02c

US$167.00-245.00
1 Piece(MOQ)
Made-in-China.com
PVD Plasma Deposition Coating Equipment for Tableware
Made-in-China.com
Ultra-Efficient Lab Desktop for Pouch Cell Coating Equipment
Made-in-China.com