SourcingAI

Crane hook block manufacturers

I have found results from400+products and200+suppliers aboutCrane hook block

Shandong Jielong Technology Co., Ltd.mic-icon
Satisfies 1/1 of your requirement
10 Ton 16 Ton 20 Ton 32 Ton 50 Ton Crane Hook Block with Forged Steel Hook and Pulley for Overhead Crane Replacement

10 Ton 16 Ton 20 Ton 32 Ton 50 Ton Crane Hook Block with Forged Steel Hook and Pulley for Overhead Crane Replacement

US$150.00-2,500.00
1 Piece(MOQ)
16 Ton 20 Ton 32 Ton 50 Ton Heavy Duty Crane Hook Block with Forged Hook Pulley Sheave for Double Girder Overhead Crane Workshop

16 Ton 20 Ton 32 Ton 50 Ton Heavy Duty Crane Hook Block with Forged Hook Pulley Sheave for Double Girder Overhead Crane Workshop

US$20.00-660.00
1 Piece(MOQ)
20 Ton 32 Ton 50 Ton 75 Ton 100 Ton Heavy Duty Double Pulley Crane Hook Block for Steel Mill Foundry Overhead Crane High Temperature Operation

20 Ton 32 Ton 50 Ton 75 Ton 100 Ton Heavy Duty Double Pulley Crane Hook Block for Steel Mill Foundry Overhead Crane High Temperature Operation

US$20.00-880.00
1 Piece(MOQ)
10 Ton 20 Ton 50 Ton Crane Hook Block with Pulley Sheave for Heavy Duty Overhead Crane and Gantry Crane Lifting

10 Ton 20 Ton 50 Ton Crane Hook Block with Pulley Sheave for Heavy Duty Overhead Crane and Gantry Crane Lifting

US$50.00-5,000.00
1 Piece(MOQ)
5 Ton 10 Ton 20 Ton 32 Ton 50 Ton Crane Hook Block Single Sheave Lifting Hook Assembly for Overhead Bridge Crane Heavy Duty Lifting

5 Ton 10 Ton 20 Ton 32 Ton 50 Ton Crane Hook Block Single Sheave Lifting Hook Assembly for Overhead Bridge Crane Heavy Duty Lifting

US$20.00-500.00
1 Piece(MOQ)
Customized Crane Hook Block for Single Girder and Double Girder Overhead Crane

Customized Crane Hook Block for Single Girder and Double Girder Overhead Crane

US$20.00-5,000.00
1 Piece(MOQ)
50 Ton Heavy Duty Crane Hook Block for Large Capacity Overhead Crane and Steel Plant Applications

50 Ton Heavy Duty Crane Hook Block for Large Capacity Overhead Crane and Steel Plant Applications

US$20.00-5,000.00
1 Piece(MOQ)
Replacement Crane Hook Block for Overhead Crane Repair and Maintenance Projects

Replacement Crane Hook Block for Overhead Crane Repair and Maintenance Projects

US$20.00-5,000.00
1 Piece(MOQ)
25 Ton Crane Hook Block for Heavy Duty Overhead Crane Steel Handling Applications

25 Ton Crane Hook Block for Heavy Duty Overhead Crane Steel Handling Applications

US$20.00-5,000.00
1 Piece(MOQ)
10 Ton Crane Hook Block for Overhead Crane Heavy Duty Lifting Applications

10 Ton Crane Hook Block for Overhead Crane Heavy Duty Lifting Applications

US$20.00-5,000.00
1 Piece(MOQ)
5 Ton 10 Ton 20 Ton 30 Ton 50 Ton Crane Hook Block Customized Forged Lifting Hook Assembly with Sheave for Overhead Gantry Crane Replacement

5 Ton 10 Ton 20 Ton 30 Ton 50 Ton Crane Hook Block Customized Forged Lifting Hook Assembly with Sheave for Overhead Gantry Crane Replacement

US$20.00-880.00
1 Piece(MOQ)
Forged Alloy Steel Crane Hook Block for Heavy Industrial Lifting Equipment

Forged Alloy Steel Crane Hook Block for Heavy Industrial Lifting Equipment

US$20.00-5,000.00
1 Piece(MOQ)
Double Sheave Crane Hook Block for Heavy Load Overhead Crane Lifting Operation

Double Sheave Crane Hook Block for Heavy Load Overhead Crane Lifting Operation

US$20.00-5,000.00
1 Piece(MOQ)
Metallurgical Crane Hook Block for High Temperature Steel Plant Crane Operations

Metallurgical Crane Hook Block for High Temperature Steel Plant Crane Operations

US$20.00-5,000.00
1 Piece(MOQ)
10 Ton 20 Ton 30 Ton 50 Ton Double Sheave Crane Hook Block Forged Hook Assembly with Pulley for Gantry Crane Steel Mill Lifting

10 Ton 20 Ton 30 Ton 50 Ton Double Sheave Crane Hook Block Forged Hook Assembly with Pulley for Gantry Crane Steel Mill Lifting

US$20.00-500.00
1 Piece(MOQ)
Double Sheave Hoist Hook Block for High Capacity Overhead Crane Lifting System

Double Sheave Hoist Hook Block for High Capacity Overhead Crane Lifting System

US$20.00-5,000.00
1 Piece(MOQ)

Sourcing guidance for Crane Hook Block

What are the key technical specifications to consider when selecting a crane hook block?

Buyers must prioritize the Safe Working Load (SWL) or Rated Capacity, ensuring it exceeds the maximum intended lift by a safety margin. Key technical factors include the number of sheaves (which determines the mechanical advantage), the sheave diameter-to-rope diameter ratio (D/d ratio) to prevent wire rope fatigue, and the material grade (typically 35CrMo or 45# forged steel). Additionally, ensure the hook features a 360-degree swivel design with high-quality thrust bearings for smooth rotation under load.

Which international compliance standards are mandatory for crane hook blocks?

For global trade, products should adhere to ISO 16877 for short-link chains and hooks. Specifically, for the US market, compliance with ASME B30.10 is essential, while the European market requires CE marking and adherence to EN 13001-3-5. Always request a Manufacturer’s Test Certificate (MTC) and a Third-Party Inspection (TPI) report from recognized bodies like SGS or BV to verify load-bearing integrity.

How do usage scenarios dictate the choice of hook block type?

The environment significantly impacts selection. For offshore or marine applications, hooks must have galvanized or epoxy coatings and stainless steel components to resist corrosion. In high-heat environments (like steel mills), heat shields and specialized high-temperature lubricants are required. For general construction, a standard weighted block is preferred to ensure the hook descends properly when unloaded.

What safety features are non-negotiable for industrial lifting hooks?

Every hook must be equipped with a heavy-duty safety latch to prevent the sling from accidental detachment. Furthermore, look for forged-in deformation indicators (small marks that show if the hook has stretched) and non-destructive testing (NDT) marks, such as Magnetic Particle Inspection (MPI) or Ultrasonic Testing (UT), which confirm the absence of internal cracks or flaws.

Cross-Border Procurement & Risk Management for Crane Components

How can I mitigate the risk of receiving substandard heavy-lifting equipment?

Utilize Made-in-China.com's Secured Trading services to ensure payment is only released after confirmation of receipt. Always mandate a pre-shipment inspection (PSI) where a technician verifies the hardness testing and load-test results (usually 1.25 to 2 times the rated capacity). Avoid suppliers who cannot provide traceability codes stamped directly on the hook body.

What are the best practices for negotiating with heavy machinery suppliers?

Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for spare parts inclusion (such as extra bearings or latches) and clarify the warranty period (standard is 12-24 months). For bulk orders, request custom branding (OEM) and ask for a tiered pricing structure where the unit cost drops by 10-15% for container-load volumes.

What logistics and shipping precautions should be taken for heavy steel components?

Crane hook blocks are dense and heavy; they must be packed in fumigated seaworthy wooden crates with internal VCI (Volatile Corrosion Inhibitor) bags to prevent rusting during sea transit. Ensure the Incoterms are clearly defined; FOB (Free On Board) is recommended for buyers with their own freight forwarders to better control costs, while CIF (Cost, Insurance, and Freight) is suitable for those wanting a landed-cost solution.

How do I ensure alignment with international trade policies and customs?

Verify the HS Code (typically 8431.41 for crane parts) to calculate accurate import duties in your country. Ensure the supplier provides a Certificate of Origin (CO), which may qualify the shipment for preferential tariff rates under specific Free Trade Agreements (FTAs). Always check for anti-dumping duties that might apply to steel products in your specific region.

Related queries