SourcingAI

Oil drilling equipment manufacturers

I have found results from7000+products and2000+suppliers aboutOil drilling equipment

Shandong Light Fir Machinery Equipment Co., Ltd.mic-icon
Satisfies 2/2 of your requirements
PDC Drillable Float Equipment Float Collar/Shoe/Cementing Tools Oil Drilling Equipment

PDC Drillable Float Equipment Float Collar/Shoe/Cementing Tools Oil Drilling Equipment

US$50.00-1,000.00
1 Piece(MOQ)
Sample Available
Xj750 Xj650 Xj550 Xj350 Mobile Oil Drilling Rig Truck Mount Workover Rig Machine Oilfield Equipment

Xj750 Xj650 Xj550 Xj350 Mobile Oil Drilling Rig Truck Mount Workover Rig Machine Oilfield Equipment

US$200,000.00
1 Set(MOQ)
Sample Available
Xj250 Workover Rig Supporting Equipment for Oil Drilling Rig

Xj250 Workover Rig Supporting Equipment for Oil Drilling Rig

US$200,000.00
1 Set(MOQ)
Sample Available
Xj450 Workover Rig Supporting Equipment for Oil Drilling Rig

Xj450 Workover Rig Supporting Equipment for Oil Drilling Rig

US$200,000.00
1 Set(MOQ)
Sample Available
Xj550 Workover Rig Supporting Equipment for Oil Drilling Rig

Xj550 Workover Rig Supporting Equipment for Oil Drilling Rig

US$200,000.00
1 Set(MOQ)
Sample Available
Oil Well Drilling Handling Tool Casing Slip Sdxl, Sdml Oilfield Equipment

Oil Well Drilling Handling Tool Casing Slip Sdxl, Sdml Oilfield Equipment

US$400.00-1,000.00
1 Set(MOQ)
Sample Available
Hydraulic Double Stage Cementing Collar Oil Drilling Equipment

Hydraulic Double Stage Cementing Collar Oil Drilling Equipment

US$500.00-1,500.00
1 Piece(MOQ)
Sample Available
API Standard Oil Drilling Equipment for Hollow Sucker Rod Solid Sucker Rod Polish Rod

API Standard Oil Drilling Equipment for Hollow Sucker Rod Solid Sucker Rod Polish Rod

US$15.00-30.00
1 Joint(MOQ)
Sample Available
Hydraulic Bonnet Opening Type Bop Blowout Preventer Oil Drilling Equipment

Hydraulic Bonnet Opening Type Bop Blowout Preventer Oil Drilling Equipment

US$25,000.00-35,000.00
1 Set(MOQ)
Sample Available
API 16A Bop/Drill Bop/RAM Bop/U Type RAM/Annular Bop/Blowout Preventer Oil Drilling Equipment

API 16A Bop/Drill Bop/RAM Bop/U Type RAM/Annular Bop/Blowout Preventer Oil Drilling Equipment

US$10,000.00-60,000.00
1 Set(MOQ)
Sample Available
Xq Series of Hydraulic Tubing Power Tong Oil Drilling Equipment

Xq Series of Hydraulic Tubing Power Tong Oil Drilling Equipment

US$1,000.00-10,000.00
1 Set(MOQ)
Sample Available
Ht Tong/Manual Tong/API Spec 7K/Drilling Tool Oil Drilling Equipment

Ht Tong/Manual Tong/API Spec 7K/Drilling Tool Oil Drilling Equipment

US$500.00-3,000.00
1 Set(MOQ)
Sample Available
Ddz Elevator/API Spec 8c/Drilling Tool Oil Drilling Equipment

Ddz Elevator/API Spec 8c/Drilling Tool Oil Drilling Equipment

US$800.00-1,100.00
1 Set(MOQ)
Sample Available
Puyang Chensheng Petroleum Technology Co., Ltd.mic-icon
Satisfies 2/2 of your requirements
Liquid-Gas Separator for Processing Drilling Fluid Oil & Gas Drilling Machine Solid Control Equipment

Liquid-Gas Separator for Processing Drilling Fluid Oil & Gas Drilling Machine Solid Control Equipment

US$3,000.00
1 Set(MOQ)
Drilling Fluid Agitator Petroleum Drilling Equipment Solids Control Equipment for The Drilling Fluid Purification System

Drilling Fluid Agitator Petroleum Drilling Equipment Solids Control Equipment for The Drilling Fluid Purification System

US$3,000.00
1 Set(MOQ)
Xj550HP/Zj20/2000m Land Oil Drilling and Workover Rig Drilling Rig Zyt Petroleum Equipment Oil Drilling Workover

Xj550HP/Zj20/2000m Land Oil Drilling and Workover Rig Drilling Rig Zyt Petroleum Equipment Oil Drilling Workover

US$320,000.00
1 Set(MOQ)
Xj650HP/Zj20/2000m Land Oil Drilling and Workover Rig Drilling Rig Oil Drilling Workover Zyt Petroleum Equipment

Xj650HP/Zj20/2000m Land Oil Drilling and Workover Rig Drilling Rig Oil Drilling Workover Zyt Petroleum Equipment

US$320,000.00
1 Set(MOQ)
Completed Service Xj250 Workover Rig 50t/70t Truck Mounted Drilling Rig Zyt Petroleum Equipment for Repair Oil Well

Completed Service Xj250 Workover Rig 50t/70t Truck Mounted Drilling Rig Zyt Petroleum Equipment for Repair Oil Well

US$320,000.00
1 Set(MOQ)
Completed Service Xj150 Workover Rig Lifting Unit 30t/50t Truck Mounted Drilling Rig Zyt Petroleum Equipment for Repair Oil Well

Completed Service Xj150 Workover Rig Lifting Unit 30t/50t Truck Mounted Drilling Rig Zyt Petroleum Equipment for Repair Oil Well

US$320,000.00
1 Set(MOQ)
Completed Service Light Rig Xj150 Workover Rig 30t/50t Truck Mounted Drilling Rig Zyt Petroleum Equipment for Repair Oil Well

Completed Service Light Rig Xj150 Workover Rig 30t/50t Truck Mounted Drilling Rig Zyt Petroleum Equipment for Repair Oil Well

US$320,000.00
1 Set(MOQ)
Xj850HP/Zj40/4000m Land Oil Drilling and Workover Rig Drilling Rig Zp375 Rotary Table Substructure Mud Tank Circulation System Zyt Petroleum Equipment

Xj850HP/Zj40/4000m Land Oil Drilling and Workover Rig Drilling Rig Zp375 Rotary Table Substructure Mud Tank Circulation System Zyt Petroleum Equipment

US$320,000.00
1 Set(MOQ)
Zj20 Land Oil Drilling Rig and Xj650 Workover Rig 2000m Drilling Rig Zp275 Rotary Table Substructure Mud Tank Circulation System Zyt Petroleum Equipment

Zj20 Land Oil Drilling Rig and Xj650 Workover Rig 2000m Drilling Rig Zp275 Rotary Table Substructure Mud Tank Circulation System Zyt Petroleum Equipment

US$320,000.00
1 Set(MOQ)
Zj30 Land Oil Drilling Rig Trailer Truck Mounted 180t and Xj750 Workover Rig 3000m Completed Service Drilling Rig Petroleum Equipment

Zj30 Land Oil Drilling Rig Trailer Truck Mounted 180t and Xj750 Workover Rig 3000m Completed Service Drilling Rig Petroleum Equipment

US$320,000.00
1 Set(MOQ)
Zj30 Land Oil Drilling and Xj750 Workover Rig 130t 3000mtruck Mounted Drilling Rig Substructure Mud Tank Circulation System Zyt Petroleum Equipment

Zj30 Land Oil Drilling and Xj750 Workover Rig 130t 3000mtruck Mounted Drilling Rig Substructure Mud Tank Circulation System Zyt Petroleum Equipment

US$320,000.00
1 Set(MOQ)
Xj150 Workover Rig 30t/45t Truck Mounted Drilling Rig Pulling out The Rod Tubing Zyt Petroleum Equipment for Repair Oil Well

Xj150 Workover Rig 30t/45t Truck Mounted Drilling Rig Pulling out The Rod Tubing Zyt Petroleum Equipment for Repair Oil Well

US$320,000.00
1 Set(MOQ)
Light Rig Xj150 Workover Rig 30t/45t Truck Mounted Drilling Rig Pulling out The Rod Tubing Zyt Petroleum Equipment for Repair Oil Well

Light Rig Xj150 Workover Rig 30t/45t Truck Mounted Drilling Rig Pulling out The Rod Tubing Zyt Petroleum Equipment for Repair Oil Well

US$320,000.00
1 Set(MOQ)

Sourcing guidance for Oil Drilling Equipment

What are the critical technical specifications to consider when sourcing oil drilling equipment?

Buyers must prioritize API (American Petroleum Institute) Standards, specifically API Spec 4F for drilling structures and API Spec 7-1 for drill stem elements. Key technical parameters include Maximum Hook Load capacity, Drilling Depth Rating, and Pump Pressure ratings. For offshore or high-pressure environments, ensure the equipment features BOP (Blowout Preventer) stacks with a minimum rating of 10,000 to 15,000 psi to ensure operational safety and structural integrity.

How can I verify the quality and durability of drilling components?

Request Non-Destructive Testing (NDT) reports, such as Magnetic Particle Inspection (MPI) or Ultrasonic Testing (UT), to detect internal flaws in steel components. Ensure the use of high-grade alloy steel (e.g., AISI 4145H) for drill collars and subs. For moving parts like top drives or mud pumps, verify the bearing life (L10 life) and ensure the supplier provides material traceability certificates (MTC) for all load-bearing components.

What compliance standards are mandatory for international oil and gas markets?

Beyond API certifications, equipment destined for the EU must carry the CE mark and comply with the ATEX Directive for equipment used in explosive atmospheres. For the North American market, adherence to ASME (American Society of Mechanical Engineers) codes for pressure vessels is essential. Always confirm that the manufacturer is an API Monogram licensed facility, as this is the industry gold standard for quality management.

What are the common usage scenarios and environmental considerations for this equipment?

Equipment must be selected based on the environment: Desert rigs require enhanced sand filtration and cooling systems, while Arctic rigs need low-temperature resistant steel (down to -40°C) and winterization packages. For offshore platforms, high-grade anti-corrosion coatings (C5-M standard) and stainless steel hydraulic lines are mandatory to resist salt spray and humidity.

Cross-Border Procurement Risks and Strategic Advice

How can I mitigate the risks of purchasing heavy industrial machinery from overseas?

Utilize third-party inspection services (such as SGS, BV, or Intertek) to conduct Factory Acceptance Tests (FAT) before the final balance payment. Given the high value of oil equipment, always use Secure Payment Terms or Letters of Credit (L/C). For sourcing reliable Chinese manufacturers with proven export track records, platforms like Made-in-China.com offer verified supplier profiles and audit reports to reduce transaction risks.

What are the logistics and shipping challenges for oversized drilling equipment?

Oil rigs and large components are often Out-of-Gauge (OOG) cargo. You must negotiate Incoterms carefully; CIF or DAP are preferred if you want the supplier to handle complex shipping, but FOB allows you more control over the freight forwarder. Ensure the supplier provides a detailed Packing List and Crating Plan using IPPC-certified heat-treated wooden pallets or specialized steel frames to prevent damage during sea transit.

How should I handle customs and international trade policy alignment?

Verify the HS Codes (typically under Chapter 84) to determine applicable import tariffs and anti-dumping duties in your country. Ensure all documentation, including the Certificate of Origin and API Compliance Certificates, is prepared in advance to avoid costly port storage fees. Be aware of dual-use technology regulations which may require specific export licenses for high-tech drilling sensors or specialized alloys.

What strategies should be used when negotiating with large-scale equipment suppliers?

Focus on the Total Cost of Ownership (TCO) rather than just the initial purchase price. Negotiate for the inclusion of critical spare parts kits (2-year operation supply) and on-site commissioning services. Ask for a performance bond or a retention percentage (usually 5-10%) to be held until the equipment is successfully installed and operational at the drill site.

Related queries