
Factory 18 20 Plastic Facial Skincare Serum Hair Oil Dropper for Cosmetic

Injection Molding Dropper for Cream, Oil, Serum for Cosmetics

Electroplated New Products T Shape Press Foundation Droppers for Cosmetic

I have found results from400+products and200+suppliers aboutPlastic dropper mould factory
























































Buyers should prioritize factories that utilize high-grade steel such as S136, H13, or 718H for mould bases and cores to ensure corrosion resistance and a long mould life (typically 500,000 to 1,000,000 shots). It is essential to verify the factory's capability in multi-cavity design (e.g., 16, 32, or 48 cavities) to maximize production efficiency. Additionally, ensure the factory uses hot runner systems (like Yudo or Husky) to reduce material waste and ensure consistent wall thickness in the droppers.
A professional factory must possess high-precision CNC machines, EDM (Electrical Discharge Machining), and wire-cutting equipment with tolerances within ±0.01mm. You should request a Mould Flow Analysis report before production to identify potential defects like air traps or sink marks. Furthermore, ensure the factory adheres to ISO 9001:2015 standards and provides a Full Dimensional Inspection Report for the first article samples (T1 samples).
Since droppers are often used for pharmaceuticals or skincare, the mould factory must operate under dust-free workshop conditions if they are also providing injection services. The materials used must be BPA-free and FDA-compliant. Ensure the mould design facilitates easy cleaning and sterilization, especially if the end product is intended for a GMP-certified environment.
The factory should support OEM/ODM services, providing 2D/3D CAD/UG/Pro-E design assistance. Look for suppliers who can integrate automatic unscrewing mechanisms for threaded droppers and those who offer interchangeable inserts, allowing you to produce different dropper sizes or styles using the same mould base to save costs.
Always utilize Trade Assurance services provided by reputable platforms like Made-in-China.com to protect your payment. It is highly recommended to hire a third-party inspection agency (such as SGS or Intertek) to conduct a Mould Trial Video Inspection and a physical check of the mould's movement and cooling system before final balance payment and shipment.
Focus on the Total Cost of Ownership (TCO) rather than just the initial price. Negotiate for a longer mould warranty period (e.g., 2 years) and request a spare parts package (including heaters, ejector pins, and O-rings) to be included in the price. For large orders, aim for a payment structure of 40% deposit, 30% after T1 sample approval, and 30% before shipment.
Moulds are heavy and prone to rust during sea transit. Ensure the factory applies anti-rust oil, wraps the mould in vacuum-sealed plastic, and uses fumigated wooden boxes compliant with international shipping standards. Verify the HS Code (typically 848071) to accurately calculate import duties in your specific country and ensure all technical manuals and steel certificates are included in the shipping documents.