SourcingAI

Power transformer manufacturers

I have found results from2000+products and1000+suppliers aboutPower transformer

Pearl Electric Co., Ltd.mic-icon
Satisfies 1/1 of your requirement
Industrial 150MVA 138kV/69kV FR3 3 Phase hv ONAN/ONAF Oil Immersed Power Transformer UL Certified

Industrial 150MVA 138kV/69kV FR3 3 Phase hv ONAN/ONAF Oil Immersed Power Transformer UL Certified

US$180,000.00
1 Piece(MOQ)
Reliable 80MVA 132kV ONAN/ONAF FR3 3 Phase Class A Insulation Copper Winding 50/60Hz OLTC Silicon Steel Core Power Transformer

Reliable 80MVA 132kV ONAN/ONAF FR3 3 Phase Class A Insulation Copper Winding 50/60Hz OLTC Silicon Steel Core Power Transformer

US$150,000.00
1 Piece(MOQ)
High Voltage Three Phase 66kV 69kV 115kV Oil-Immersed Power Transformer for Grid Substation

High Voltage Three Phase 66kV 69kV 115kV Oil-Immersed Power Transformer for Grid Substation

US$2,000,000.00
1 Piece(MOQ)
Advanced Technology Pearl Electric 25MVA 110kV ONAF Mineral Oil Insulation Oil-immersed power transformer for US Data Center Power Supply UL Certified

Advanced Technology Pearl Electric 25MVA 110kV ONAF Mineral Oil Insulation Oil-immersed power transformer for US Data Center Power Supply UL Certified

US$21,000.00
1 Piece(MOQ)
High Overload Capacity Pearl Electric 40MVA 230kV Oil-immersed power transformer for US Commercial System IEEE Tested

High Overload Capacity Pearl Electric 40MVA 230kV Oil-immersed power transformer for US Commercial System IEEE Tested

US$130,000.00
1 Piece(MOQ)
Long Service Life Pearl Electric 5MVA 35kV OLTC 3 Phase Oxygen-free Oil-immersed power transformer for US Airport Power KEMA Tested

Long Service Life Pearl Electric 5MVA 35kV OLTC 3 Phase Oxygen-free Oil-immersed power transformer for US Airport Power KEMA Tested

US$33,800.00
1 Piece(MOQ)
Compact Footprint Pearl Electric 100MVA 118kV Mineral Oil Insulation Three Phase Oil-immersed power transformer for US Mining Excavation Site UL Certified

Compact Footprint Pearl Electric 100MVA 118kV Mineral Oil Insulation Three Phase Oil-immersed power transformer for US Mining Excavation Site UL Certified

US$150,000.00
1 Piece(MOQ)
Custom Industrial High Voltage Three Phase 20MVA 25MVA 30MVA 40MVA 50MVA Oil Immersed Power Electrical Transformer

Custom Industrial High Voltage Three Phase 20MVA 25MVA 30MVA 40MVA 50MVA Oil Immersed Power Electrical Transformer

US$450,000.00
1 Piece(MOQ)
Premium-grade Pearl Electric 63MVA 138kV Three Phase 50/60Hz Oil-immersed power transformer for US Data Center Grid IEEE Standard

Premium-grade Pearl Electric 63MVA 138kV Three Phase 50/60Hz Oil-immersed power transformer for US Data Center Grid IEEE Standard

US$150,000.00
1 Piece(MOQ)
Proven Reliability Pearl Electric 10MVA 132kV Silicon Steel Core On-load Tap Oil-immersed power transformer for Azerbaijan LNG Terminal IEC 60076

Proven Reliability Pearl Electric 10MVA 132kV Silicon Steel Core On-load Tap Oil-immersed power transformer for Azerbaijan LNG Terminal IEC 60076

US$68,000.00
1 Piece(MOQ)
High Efficiency Three Phase 630kVA 1000kVA 1250kVA 2000kVA 2500kVA 3150kVA Cast Resin Dry Type Power Transformer

High Efficiency Three Phase 630kVA 1000kVA 1250kVA 2000kVA 2500kVA 3150kVA Cast Resin Dry Type Power Transformer

US$25,000.00
1 Piece(MOQ)
Three Phase Cast Resin Dry Type Power Transformer 3MVA/4MVA/5MVA/6MVA up to 26MVA

Three Phase Cast Resin Dry Type Power Transformer 3MVA/4MVA/5MVA/6MVA up to 26MVA

US$15,000.00
1 Piece(MOQ)
High Voltage Three Phase 3500kVA 5000kVA 8000kVA Dry Type Power Distribution Transformer for Grid

High Voltage Three Phase 3500kVA 5000kVA 8000kVA Dry Type Power Distribution Transformer for Grid

US$3,250.00
1 Piece(MOQ)

Sourcing guidance for Power Transformer

What are the key technical specifications to consider when selecting a Power Transformer?

When sourcing power transformers, you must prioritize Rated Capacity (kVA/MVA), Voltage Ratio (e.g., 11kV to 415V), and Phase Configuration (Single or Three-phase). Ensure the Insulation Class (Class F or H) matches your thermal requirements and verify the Cooling Method (ONAN, ONAF, or Dry-type AN). Additionally, check the Impedance Voltage percentage, as it directly affects short-circuit current and voltage regulation.

Which international compliance standards are mandatory for global trade of transformers?

Suppliers must adhere to IEC 60076 for power transformers or IEEE/ANSI C57 for North American markets. For European distribution, CE marking and compliance with the Ecodesign Directive (Tier 2 efficiency levels) are essential. Ensure the manufacturer holds ISO 9001 for quality management and ISO 14001 for environmental standards to mitigate operational risks.

How can I evaluate the energy efficiency and economic feasibility of a transformer?

Focus on the No-load losses (Iron losses) and Load losses (Copper losses). While high-efficiency transformers (using Amorphous Alloy cores) have a higher initial purchase price, they offer a lower Total Cost of Ownership (TCO) over a 20-year lifespan. Request a Loss Capitalization Formula from the supplier to calculate long-term energy savings against the upfront investment.

What usage scenarios dictate the choice between Oil-Immersed and Dry-Type transformers?

Oil-Immersed transformers are preferred for outdoor high-voltage substations and industrial plants due to superior cooling and durability. However, for indoor environments, high-rise buildings, or hospitals, Cast Resin Dry-Type transformers are mandatory because they are fire-resistant, self-extinguishing, and environmentally friendly (no oil leakage risk).

Cross-Border Procurement Strategy & Risk Management

What are the primary risks in cross-border transformer purchasing and how to mitigate them?

The biggest risks include damage during transit and specification mismatch. To mitigate these, mandate Seaworthy Packaging (vacuum sealing and heavy-duty wooden crates) and hire a third-party agency like SGS or Intertek for a Pre-Shipment Inspection (PSI). Always use Made-in-China.com’s secured payment services to ensure funds are only released upon proof of shipment.

How should I negotiate with Chinese transformer manufacturers for the best terms?

Focus on the Copper vs. Aluminum winding debate; copper is more expensive but more conductive. Negotiate based on the current LME (London Metal Exchange) copper prices to ensure transparent pricing. Request a warranty period of at least 24 months and ask for 5% spare parts (bushings, gaskets) to be included in the bulk price.

What logistics and shipping precautions are unique to heavy power equipment?

Transformers are heavy and sensitive. Ensure the bill of lading specifies 'No Stack' and 'Top Heavy'. For large units, require Impact Recorders to be attached to the crate to monitor G-force shocks during sea freight. Confirm the supplier provides a Full Set of Technical Documents, including Type Test Reports and Routine Test Certificates, which are vital for customs clearance and local grid connection.

Related queries