SourcingAI

Changjiang crane

I have found results from600+products and100+suppliers aboutChangjiang crane

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Straight Arm
All Terrain Crane
Type: Folding
Certification: CE
Condition: Used
Maximum Lifting Height: 25-30m
Maximum Lifting Weight: 11-13t
Shaft Number: 3
Crane Jib: Five-Arm
Boom Length: 50 meters
Control System: Computerized Control
Drive Mode: Electric Motor
Maximum Lifting Capacity: 50 tons
Automatic Grade: Full-Automatic
Warranty: 1 Year
Certification: ISO9001
Certification: SGS
Certification: GS
Certification: RoHS
Certification: BV
Condition: New
Maximum Lifting Height: 20-25m
Maximum Lifting Height: >40m
Maximum Lifting Height: 30-40m
Maximum Lifting Height: 10-15m
Maximum Lifting Weight: 14-16t
Maximum Lifting Weight: >16t
Maximum Lifting Weight: 8-10t
Maximum Lifting Weight: 5-7t
Shaft Number: 2
Crane Jib: Four-Arm
Crane Jib: Three-Arm
Boom Length: 40 meters
Drive Mode: Diesel Engine
Maximum Lifting Capacity: 500 tons

Sourcing guidance for Changjiang Crane

What are the key technical specifications to evaluate when sourcing a Changjiang Crane?

When selecting a crane, you must prioritize the Maximum Lifting Capacity and the Working Radius to ensure it meets your project requirements. Pay close attention to the Boom Length (fully extended vs. retracted) and the Lifting Height. For mobile cranes, verify the Engine Power (kW) and Chassis Gradeability to ensure performance on uneven terrain. Additionally, ensure the crane uses High-Strength Manganese Steel for the boom structure to guarantee durability and safety under heavy loads.

Which international compliance standards should a Changjiang Crane meet for cross-border trade?

To ensure legal operation and safety, the crane should adhere to ISO 9001 Quality Management Systems. For the European market, CE Certification is mandatory, while US-bound equipment should align with ASME B30 standards. Furthermore, verify that the manufacturer provides a Load Moment Indicator (LMI) and Anti-Two-Block systems, which are critical safety requirements in most international jurisdictions.

How can I verify the structural integrity and performance of a used or new crane?

Request a Third-Party Inspection Report (such as SGS or BV) focusing on Non-Destructive Testing (NDT) for weld seams and hydraulic pressure tests. For new units, ask for a Factory Acceptance Test (FAT) video. For used units, check the Hour Meter for actual engine usage and inspect the Hydraulic Cylinders for leaks or scoring. Swing Bearing play should also be measured to ensure the rotation mechanism is not excessively worn.

What are the maintenance requirements for ensuring the longevity of a Changjiang Crane?

Regular maintenance should include Lubrication of the Slewing Ring and Wire Ropes every 50-100 operating hours. The Hydraulic Oil should be filtered or replaced according to the manufacturer’s schedule to prevent valve blockages. It is essential to source from suppliers who provide a Comprehensive Spare Parts Kit (including filters, seals, and sensors) to minimize downtime in regions where local parts may be scarce.

Cross-Border Procurement & Risk Management for Heavy Machinery

What are the most effective shipping methods for heavy cranes to international destinations?

Due to the size and weight, Roll-on/Roll-off (RoRo) shipping is the safest and most common method for mobile cranes, as it allows the unit to be driven onto the vessel. For stationary or larger crawler cranes, Breakbulk shipping is required. If the crane can be partially disassembled, 40ft Flat Rack (FR) or Open Top containers may offer a more cost-effective solution. Always ensure the supplier uses Marine-Grade Anti-Corrosion Wax to protect the metal surfaces during sea transit.

How can I mitigate transaction risks when purchasing high-value machinery?

Always use Secure Payment Terms such as a Letter of Credit (L/C) or escrow services provided by reputable platforms like Made-in-China.com. Avoid full upfront payments; a standard structure is 30% deposit and 70% against the Bill of Lading (B/L) after a successful pre-shipment inspection. Ensure the Proforma Invoice (PI) explicitly lists the serial numbers of the engine and chassis to prevent equipment swapping.

What strategies should be used when negotiating with heavy equipment suppliers?

Focus negotiations not just on the unit price, but on the Inclusion of Wear-and-Tear Parts and Extended Warranty Periods (ideally 12-24 months). Inquire about Technical Training—many top-tier suppliers will provide online video training or send engineers for on-site commissioning for large orders. Leverage Volume Discounts if purchasing multiple units, as shipping costs per unit significantly decrease when consolidating cargo.

What documentation is critical for customs clearance in the destination country?

Beyond the standard Commercial Invoice and Packing List, you must secure a Certificate of Origin (CO) to potentially benefit from preferential tariffs. For heavy machinery, a Technical Data Sheet and Engine Emission Standard Certificate (e.g., EPA or Euro V) are often required by customs to ensure the vehicle meets local environmental regulations. Failure to provide these can lead to Costly Port Storage Fees or seizure of the goods.

Related queries