SourcingAI

Derrick crane

I have found results from8000+products and2000+suppliers aboutDerrick crane

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Straight Arm
Type: Top-Slewing Crane
Type: Under-Slewing Crane
Type: Tower Crane
Certification: CE
Condition: Used
Maximum Lifting Height: >40m
Shaft Number: 2
Crane Jib: Three-Arm
Maximum Lifting Weight: >10t
Installation: Jack-Up
Moving Type: Fixed
Operation Form: Cabin
Warranty: 1 Year
Control System: Manual Control
Drive Mode: Hydraulic System
Certification: ISO9001
Certification: GS
Certification: RoHS
Condition: New
Maximum Lifting Height: 150-200m
Maximum Lifting Height: <50m
Maximum Lifting Height: 100-150m
Maximum Lifting Height: 200-250m
Maximum Lifting Height: 30-40m
Maximum Lifting Height: 50-100m
Shaft Number: 3
Crane Jib: Five-Arm
Crane Jib: Four-Arm
Maximum Lifting Weight: 8t
Maximum Lifting Weight: >16t
Maximum Lifting Weight: <5t
Maximum Lifting Weight: 6t
Installation: Assembled
Overall Rapid Disassembly

Sourcing guidance for Derrick Crane

What are the key technical specifications to evaluate when sourcing a Derrick Crane?

When selecting a derrick crane, you must prioritize the Lifting Capacity (SWL) and Working Radius to ensure it meets your project's load requirements. Pay close attention to the Mast Height and Boom Length, as these determine the vertical and horizontal reach. Additionally, verify the Hoisting Speed and Slewing Angle (typically 360 degrees for modern units) to ensure operational efficiency. For heavy-duty applications, ensure the crane uses high-tensile Q345B or Q355B steel for the structural components to guarantee durability under stress.

Which compliance standards and certifications are mandatory for international procurement?

To ensure safety and legal operation, the equipment must adhere to international standards such as ISO 4301 for crane classification. For the European market, CE Marking and compliance with the Machinery Directive 2006/42/EC are essential. If you are importing to North America, look for ASME B30.6 standards. Always request Material Test Reports (MTRs) and Non-Destructive Testing (NDT) records for critical welds to verify structural integrity before shipment.

How do usage scenarios influence the choice of Derrick Crane type?

The choice depends heavily on the environment. For high-rise construction, a Roof Derrick is ideal due to its light self-weight and ease of disassembly. For marine or port operations, you require a derrick with enhanced anti-corrosion coatings (C5-M standard) and marine-grade electrical components. In quarrying or mining, focus on stiff-leg derricks which offer superior stability for repetitive, heavy lifting without the need for extensive guy-wire systems.

What safety features are non-negotiable for industrial-grade derrick cranes?

Safety is paramount in B2B heavy machinery sourcing. Ensure the crane is equipped with a Load Moment Indicator (LMI), Anti-Two-Block system, and Automatic Overload Protection. Furthermore, verify the presence of Emergency Stop buttons at all control stations and Limit Switches for hoisting, booming, and slewing. For electric-driven models, Phase Failure Protection and Low Voltage Protection are critical to prevent motor burnout.

Cross-Border Procurement Risks and Strategies for Heavy Machinery

How can I mitigate the risk of receiving substandard heavy machinery?

The most effective strategy is to mandate a Pre-Shipment Inspection (PSI) conducted by a reputable third-party agency like SGS or TÜV Rheinland. For platforms like Made-in-China.com, prioritize Audited Suppliers who have undergone comprehensive on-site factory verifications. Never release the final 30-70% balance payment until the inspection report confirms that the crane meets all technical specifications and safety tests.

What are the best practices for negotiating with Chinese crane manufacturers?

Focus on the Total Cost of Ownership (TCO) rather than just the sticker price. Negotiate for the inclusion of critical spare parts for 2 years of operation (e.g., wire ropes, seal kits, electrical contactors). Demand a warranty period of at least 12 to 24 months on major structural components. It is also wise to negotiate Incoterms 2020 clearly; for heavy machinery, CIF or CFR is often preferred by buyers to simplify the complex logistics of oversized cargo.

What logistics considerations are unique to shipping a Derrick Crane?

Derrick cranes are typically shipped as Oversized Cargo (OOG). You must decide between Breakbulk shipping or using Flat Rack (FR) containers. Ensure the supplier provides a detailed Packing List and Loading Plan to prevent damage during transit. Verify that all components are treated with rust-preventative wax or VCI film, especially for sea freight, to prevent salt-air corrosion during the 30-45 day transit period.

How do I ensure transaction security in high-value B2B trades?

Use secure payment methods such as a Letter of Credit (L/C at sight) for large transactions, which ensures payment is only released upon presentation of valid shipping documents. Alternatively, utilize the secured trading services provided by Made-in-China.com to protect your deposit. Always verify the supplier's bank account details via a secondary communication channel (like a video call) to avoid falling victim to email spoofing or phishing scams.

Related queries