SourcingAI

Digital energy meter

I have found results from200000+products and60000+suppliers aboutDigital energy meter

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Energy Meter
Type: Power Meter
Display: Digital
Multi-Functional Energy Meter
Electric Equipment: Three-phase Four-wire
Theory: Electronic Meter
Power Meter Connection: Terminal
Certification: RoHS
Customized: Customized
Installation: Direct Connected
Measured Signal: Pulse Peak
AC and DC
DC Voltmeter Type: Electrostatic
AC Voltmeter Type: Electromagnetic
Accuracy: 1
Kind: Rotating Coil
Application: Electric Power
Display Ammeter Type: Single-phase Digital
Install: Horizontal
Medium Temperature: Cold Water
Level Measurement: A
Counter Instructions: Digital
Nominal Diameter: 15-50mm
Speed of Water Meter
General Water Meter
Liquid Sealed Water Meter
Usage: Watt-Hour Meter
Meter for Industry and Home Use
Standard Electric Energy Meter
Reactive Energy Meter
Multi-rate Watt-hour Meters
Maximum Demand Meter
Usage: Prepayment Meter
Electric Equipment: Three-phase Three-wire
Electric Equipment: Single-phase
Theory: Electric Apparatus
Power Meter Connection: Feed-through Type
Certification: ISO
Certification: CE
Customized: Non-Customized
Installation: Portable Precise
Measured Signal: Continuous Wave
Power Source: AC Meter
Application: Civil
Application: Industrial

Sourcing guidance for Digital Energy Meter

What are the key technical specifications to consider when selecting a Digital Energy Meter for industrial use?

When sourcing for industrial applications, prioritize Accuracy Class (typically Class 0.5s or 0.2s for billing and high-precision monitoring). Ensure the meter supports True RMS measurement to accurately capture distorted waveforms in environments with high non-linear loads. Key parameters should include Voltage, Current, Active/Reactive/Apparent Power, Power Factor, and Frequency. Additionally, verify the Data Logging capacity and the presence of a backlit LCD display for clear local readings.

Which communication protocols and integration capabilities are essential for smart grid or building management systems?

For seamless integration into SCADA or Building Management Systems (BMS), the meter must support RS485 interface with Modbus-RTU protocol as a standard. For advanced IoT applications, look for units offering Ethernet (Modbus-TCP), NB-IoT, or LoRaWAN connectivity. Ensure the supplier provides API documentation or communication registers maps to facilitate software integration.

What international compliance standards and certifications are mandatory for Digital Energy Meters?

To ensure safety and global market access, products must adhere to IEC 62053-21/22 for electricity metering equipment. For the European market, MID (Measuring Instruments Directive) certification is essential for billing purposes. Additionally, look for CE, RoHS, and UL marks to confirm the device meets electromagnetic compatibility (EMC) and safety requirements for high-voltage environments.

How can I evaluate the physical durability and installation efficiency of the meters?

Check for DIN Rail mounting (35mm) compatibility, which is the industry standard for easy installation in distribution boards. The housing should be made of flame-retardant VO grade plastic. For outdoor or harsh environments, verify the IP (Ingress Protection) rating, typically IP51 or higher for the front panel. Also, confirm if the meter supports CT (Current Transformer) or PT (Potential Transformer) ratios that are programmable to match your existing hardware.

Cross-Border Procurement & Risk Management for Energy Meters

What are the common risks when sourcing Digital Energy Meters internationally?

The primary risk is technical incompatibility with local grid frequencies (50Hz vs 60Hz) or wiring configurations (Single-phase vs Three-phase 3-wire/4-wire). Another risk is counterfeit components inside the meter that lead to premature failure. To mitigate this, request Type Test Reports from accredited third-party labs and use Made-in-China.com's Secured Trading services to ensure the product meets the agreed-upon specifications before final payment.

How should I negotiate with suppliers to ensure long-term quality and price stability?

Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for a warranty period of at least 2-3 years, as energy meters are long-term infrastructure assets. Ask for tiered pricing based on annual volume forecasts to secure discounts of 10-20% for bulk orders. Request a sample for bench testing to verify accuracy against a calibrated reference meter before placing a mass production order.

What logistics and customs precautions should be taken for electronic measuring instruments?

Energy meters contain sensitive electronic circuits; ensure the supplier uses anti-static packaging and moisture-proof vacuum sealing. For customs, ensure the HS Code (typically 9028.30) is correctly declared to avoid tariff disputes. If the meters include lithium batteries for memory backup, ensure the supplier provides a UN38.3 test report and follows international air/sea freight regulations for hazardous materials.

How can I verify the credibility of a Digital Energy Meter manufacturer on Made-in-China.com?

Prioritize Audited Suppliers who have undergone on-site inspections by third-party institutions like SGS or Bureau Veritas. Check their Export Experience to your specific region, as they will be more familiar with your local grid standards. Review their R&D capabilities—top-tier manufacturers usually hold multiple patents and software copyrights related to energy management algorithms.

Related queries