Final drive
I have found results from200000+products and100000+suppliers aboutFinal drive
Kayaba Kyb Travel Motor Original Kyb Final Drive Mag-230vp
Ini Low Speed Final Drive PC130 Dh135 Sk130 HD450 E312 Hydraulic Excavator High Torque Hydraulic Track Drive Travel Motor
Excavator Undercarriage Parts Final Drive Assy Itm22 Travelmotor
High-Quality Undercarriage Parts Final Drives for Skid Steer Loaders and Mini Excavators
Brevini Ctu3150.1 Ctu3200.1 Ctu3300.1 Ctu3500.1 Ctu3700.1 Dana Spicer Riduttori Final Drive From China
High-Quality Final Drive Assembly for Hyundai Excavators R305 R330
Construction Machinery Parts Kyb Final Drive Msf-340vp-EL2
Gft60 Gft80 Gft110 Gft160 Gft220 Gft330 Atlas Copco Epiroc 57415929 Hydraulic Gft Hydraulic Final Drive
GM06 Ktm06 TM06 Phv-390 Travel Motor Final Drive for PC50 PC55 PC56 Zx60 E305.5
San'y Excavator Final Drive Unit 12940338 Travel Motor Gearbox Suitable for Sy305c
Final Drive Jmv16 for Excavator 3 Tons Hitachi Ex 35
Construction Travel Motor/Final Drive for Sumitomo Sh120/Kobelco Sk120 Excavator
227-6188 / 2276188 Travel Motor Final Drive Assembly for C at 365c Ca T374D Excavator
10-13ton Jeil 14TM Doosan TM18vc Hydraulic Travel Motor Final Drive for Sumitomo Sh120 Excavator
E315 1550157 E315b Excavator Travel Transfer Gearbox 155-0157 Final Drive
Travel Motor 378-9568 378-9567 3789568 3789567 Final Drive for Cat 330gc
R220LC-9s 39q7-40100 R220-9 R225-9 R215-9 R210-9 R260-9 R210LC-7 Final Drive for Hyund*Ai Excavator Parts
Hot Selling Sk210-8 Travel Motor Sk200-8 Final Drive with Cheap Price
Good Price Mantall 2 Bare Pacing China Wheel Loader Part Final Drive Self-Propelled Xe140W
21t-27-72120 Final Drive for Komatsu PC2000LC-8 PC2000-11 PC2000-8 Excavator Spare Part
Wsg New 324D Final Drive Excavator Parts E324D E324D Travel Motor Final Drive
561-88-70203 561-88-70204 Final Drive Assembly for Komatsu Original Dump Truck HD785-7 Parts
Sourcing guidance for Final Drive
What are the key technical specifications to evaluate when sourcing a final drive?
When selecting a final drive, you must prioritize torque density and gear reduction ratios to ensure the unit matches the machine's hydraulic output. Key specs include the displacement (cc/rev), maximum operating pressure (typically 30-35 MPa), and output torque. Ensure the mounting dimensions (flange diameter and bolt hole patterns) are 100% compatible with your specific excavator or crawler model to avoid costly installation failures.
How can I verify the quality and durability of the internal components?
The longevity of a final drive depends on the heat treatment process of the planetary gears and the quality of the floating seals. Request suppliers to provide evidence of induction hardening or carburizing for gears to ensure a surface hardness of HRC 58-62. Additionally, verify that the unit uses high-grade bearings (such as NSK or SKF) and high-pressure resistant oil seals to prevent leakage and premature wear in harsh environments.
What compliance standards and certifications should a professional supplier possess?
Reliable manufacturers should hold ISO 9001:2015 certification for quality management systems. For hydraulic components, look for compliance with CE marking (for the European market) and evidence of rigorous factory testing, including 100% hydraulic leakage tests and noise level testing (typically <80dB) before shipment. Suppliers on Made-in-China.com with 'Audited Supplier' status provide an extra layer of verification regarding their production capabilities.
What are the common usage scenarios and maintenance requirements for final drives?
Final drives are critical for tracked construction machinery like excavators, bulldozers, and drill rigs. To ensure a service life of 5,000+ hours, buyers must emphasize regular gear oil changes (every 500-1,000 hours) and the use of high-viscosity extreme pressure (EP) lubricants. Advise end-users to check for metal shavings in the magnetic plug, which serves as an early warning sign of internal gear fatigue.
Cross-Border Procurement Risks and Strategic Advice
How can I mitigate the risk of receiving a final drive that doesn't fit my machine?
The most common risk is dimensional mismatch. Always provide the supplier with the machine model, part number, and the number of frame/sprocket bolt holes. Request a technical drawing (PDF or CAD) for approval before production. For customized OEM orders, a sample trial is highly recommended to verify hydraulic port alignment and travel speed synchronization.
What are the best practices for negotiating price and lead times with Chinese suppliers?
Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (12-24 months) instead of small price cuts, as this proves the supplier's confidence in their product. For bulk orders, aim for a 10-15% discount at the 10-unit tier. Ensure the contract specifies a lead time (usually 7-15 days for stock items) with clear penalties for delays to protect your supply chain.
How should final drives be packaged and shipped to ensure safe arrival?
Final drives are heavy, high-precision hydraulic components. They must be shipped in fumigated wooden crates with internal shock-absorbing foam and anti-rust VCI bags. Since these units contain residual oil, ensure the supplier provides a Non-Hazardous Chemical Declaration to avoid customs delays. For international shipping, FOB or CIF terms are standard; however, ensure the cargo is insured for its full replacement value.
How can I ensure transaction security when dealing with overseas suppliers?
Utilize secure payment methods and prioritize suppliers on Made-in-China.com who offer Star Ratings and comprehensive audit reports. Always conduct a pre-shipment inspection (PSI)—either via a third-party agency or by requesting a video of the unit undergoing a pressure test with your specific serial number visible—to ensure the product meets the agreed-upon performance benchmarks before final payment.





























