SourcingAI

Foam mould

I have found results from200000+products and70000+suppliers aboutFoam mould

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Polyurethane Foam Machine
Type: Special Casting
Clay Dry Sand
Type: Folding
EPS Foam Machine
Type: Profile Extruder
Raw Material: Mixing
Automation: Automatic
Computerized: Non-Computerized
Certification: CE
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Application: Car
Runner: Hot Runner
Design Software: UG
Customized: Customized
Plastic Material: ABS
Process Combination Type: Single-Process Mode
Installation: Fixed
Standard: DME
Material: Steel
High Temperature Resistance
Mold Material: Metal Mold
Warranty: 6 Months
Metal Color: Non-Ferrous Metal
Condition: New
Automatic Grade: Automatic
Power Source: Electric
Screw Design: Single-Screw
Thermal Gravity Casting
Clay Sand Core
Machining: CNC Machining
Surface Treatment: Sand Blast
Surface Roughness: Ra6.3
Molding Material: Metal Mould
Extrusion: Extrusion
Extrusion Mould: Hollow Mould
Nose Application: Profile Molding
Group Control Multi-mode
Pressure of Nose: High Pressure
Non Metal Mould: Inorganic Mould
Metal Mould: Forging Die
Age: 3-8 Years
Usage: Sports
Imprint: Pad Print
Logo Print: Simple Color
Lost Wax Casting
Molding Technics: Gravity Casting
Surface Preparation: Sand Blast
Machining Tolerance: +/-0.10mm
High-Pressure Air Type
File Format: STEP
Printer Material: Metal
Nozzle Number: 4
Plastic Processed: PVC
Extrusion Molding Machine
Feeding Mode: One Feed
Integral Type Extruder
Screw: Twin-Screw
Engagement System: Intermeshing
Screw Channel Structure: Deep Screw
Exhaust: Exhaust
Grade: Top Grade
Computerized: Computerized
Certification: ISO9001:2008
Certification: QS
Certification: ISO
Certification: TS16949
Certification: FDA
Certification: RoHS
Certification: ISO 9001:2000
Certification: ISO 9001:2008
Certification: EN71
Certification: ASTM
Certification: ISO9001
High Foaming Polystyrene Mould
Mould Cavity: Multi Cavity
Application: Home Use
Application: Hardware
Application: Electronic
Application: Household Appliances
Application: Furniture
Application: Commodity
Application: Machinery Parts
Design Software: Pro-E
Process Combination Type: Compound Die
Installation: Semi Fixed
Standard: HASCO
Standard: MISUMI
Standard: ASTM
Material: Iron
Material: Aluminium
Material: Plastic
Material: Cast Steel
Material: PVC
Function: Moisture-proof
Function: Insulation
Function: Soundproof
Function: Heat Insulation
Function: Light
Function: Corrosion Resistance
Function: High Stiffness
Warranty: 12 Months
Warranty: 24 Months
Screw Design: Double-Screw
Surface Roughness: Ra3.2
Surface Roughness: Ra12.5

Sourcing guidance for Foam Mould

How to choose the right material for a Foam Mould?

Selecting the correct material is critical for durability and production volume. For high-volume production, Aluminum (7075 or 6061 grade) is the industry standard due to its excellent thermal conductivity and lightweight nature. For low-volume prototyping, epoxy resins or CNC-machined plastics may be used. If you are producing EPS (Expanded Polystyrene) or EPP (Expanded Polypropylene), ensure the mould material can withstand high steam pressure and frequent thermal cycling without warping.

What technical specifications are essential for Foam Mould performance?

Buyers must prioritize surface finish and venting systems. A Teflon coating is often required to ensure easy demoulding and prevent foam tearing. Furthermore, the venting hole distribution must be precise to allow air to escape, ensuring uniform foam density and preventing 'voids' in the final product. Always request a wall thickness analysis to ensure the mould can handle the expansion forces of the chemical reaction.

What compliance and quality standards should Foam Moulds meet?

Suppliers should adhere to ISO 9001:2015 for quality management. For moulds used in the automotive or medical sectors, verify compliance with IATF 16949 or specific biocompatibility standards. Ensure the mould design follows safety factors for pressure vessels if it is an injection-foam process, and confirm that all cooling channels are pressure-tested to prevent leaks that could contaminate the foam chemistry.

How can I evaluate the economic feasibility of a custom Foam Mould?

Calculate the Total Cost of Ownership (TCO) by factoring in the mould life cycle (number of shots). A cheaper steel mould might suffer from corrosion or slower cycle times compared to a precision-engineered aluminum mould. Look for suppliers on Made-in-China.com who offer DFM (Design for Manufacturing) reports; this helps identify potential cost savings in the design phase before the first cut is made.

Cross-Border Procurement Considerations for Foam Moulds

What are the primary risks in international Foam Mould procurement?

The biggest risk is intellectual property (IP) leakage and technical misalignment. To mitigate this, ensure you sign a Non-Disclosure Agreement (NDA) and provide detailed 2D and 3D CAD drawings (STEP or IGES format). Another risk is shipping damage; because moulds are heavy and precision-aligned, they must be treated with anti-rust oil and packed in fumigated wooden crates with internal bracing.

How should I negotiate with Foam Mould suppliers?

Focus on the milestone payment structure. A standard industry practice is 40% deposit, 30% after T1 samples approval, and 30% before shipment. Negotiate for a guaranteed number of cycles (e.g., 100,000 shots) and ensure the contract includes a warranty period covering mould repair or component replacement if defects are found upon arrival.

What are the best practices for shipping heavy industrial moulds to a specific country?

Due to the weight, Sea Freight (LCL or FCL) is the most economical method. Ensure the supplier provides a Packing List, Commercial Invoice, and Bill of Lading. For customs clearance, use the correct HS Code (typically 848071 for injection moulds) to avoid tariff penalties. If you are sourcing via Made-in-China.com, consider using their Secured Trading services to ensure payment is only released once shipping documents are verified.

How can I verify the quality of the mould before it leaves the factory?

Always request a Video Trial (T1/T2) and Sample Inspection Report. If possible, hire a third-party inspection agency to perform a 'dry run' of the mould to check for mechanical alignment, cooling leak tests, and ejector pin functionality. Never authorize final payment until you have reviewed the physical samples produced by the mould.

Related queries