SourcingAI

Glass glazing system

I have found results from70000+products and20000+suppliers aboutGlass glazing system

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Overhang Curtain Wall
Type: Elevation
Type: Float Glass
Awning Curtain Wall
Material: Aluminum Alloy
Frame Material: Aluminum Alloy
Function: Heat Insulation
Surface Finishing: Finished
Screen Netting Material: Fiberglass
Style: Modern
Opening Pattern: Horizontal
Security Rating: A
Open: Closed
Full Glass Curtain Wall
Frame Curtain Wall Kind: Mixed Frame
Half Block Construction
Number of Layers: Double
Aluminum Composite Panel Curtain Wall
Shape: Standard Plane
Usage: Exterior Wall
Photovoltaics Curtain Wall
Certification: ASTM
Frame Finishing: Powder Coated
Surface Treatment: Coated
Structure: Solid
Glass Thickness: 4mm
Air Cavity Depth: 6mm
Moh's Hardness: 8
Energy Transfer: Convection
Deep Processing Depth: Hollow Glass
Color: Clear
Open Style: Swing
Position: Room
Material: Glass
Material: Aluminum
Material: Steel
Function: Soundproof
Function: Airproof
Function: Dust-proof
Function: Decoration
Function: Anti-Theft
Function: Insect-proof
Function: Invisible
Security Rating: B
Open: Opening
Frame Glass Curtain Wall
Frame Curtain Wall Kind: Semi-exposed Frame
Supporting Construction: Frame Type
Number of Layers: Single
Aluminum Panel Curtain Wall
Shape: Flat
Shape: Column
Usage: Interior Wall
Usage: Furniture
Usage: Door
Usage: Building
Usage: Window
Ventilation Curtain Wall
Intelligent Curtain Wall
Certification: ISO9001
Certification: RoHS
Certification: CE
Air Cavity Depth: 12mm
Moh's Hardness: 9
Energy Transfer: Conduction

Sourcing guidance for Glass Glazing System

What are the key technical specifications to consider when selecting a Glass Glazing System?

Buyers must prioritize thermal performance (U-value) and Solar Heat Gain Coefficient (SHGC) to ensure energy efficiency. For structural integrity, specify tempered or laminated safety glass that meets ASTM C1048 or EN 12150 standards. Additionally, the aluminum profile thickness should typically be ≥2.0mm for curtain walls to handle wind loads, and the sealing system must utilize EPDM gaskets or high-grade structural silicone to prevent air and water leakage.

Which compliance standards are mandatory for international glass procurement?

Compliance varies by destination: CE Marking (EN 14351) is mandatory for the European market, while SGCC (Safety Glazing Certification Council) or ANSI Z97.1 is required for the United States. For Australian projects, ensure adherence to AS/NZS 2208. Always request verified test reports from the supplier to confirm the glass meets impact resistance and fragmentation requirements.

How do I evaluate the acoustic and security functions of a glazing system?

For high-noise environments, select Sound Transmission Class (STC) rated glass, typically achieved through varying glass thicknesses or acoustic PVB interlayers. For security, multi-point locking systems and SGP (SentryGlas Plus) interlayers offer superior protection against forced entry and hurricanes compared to standard PVB.

What are the common usage scenarios for different glazing types?

Unitized curtain walls are ideal for high-rise commercial buildings due to fast on-site installation. Point-supported (spider) glazing is best for architectural lobbies requiring maximum transparency. For residential projects, double or triple-glazed Insulated Glass Units (IGU) with Low-E coatings are the standard for balancing comfort and cost.

Cross-Border Procurement Strategy & Risk Management

What are the primary risks when shipping glass systems internationally?

The biggest risk is breakage during transit. Ensure the supplier uses customized fumigated wooden crates with cushioning materials and steel banding. It is critical to include 'Fragile' and 'This Side Up' labels and consider CIF terms to ensure the cargo is covered by marine insurance that specifically includes breakage.

How should I negotiate with suppliers on Made-in-China.com?

Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for spare glass panels (typically 2-3% extra) to be included in the bulk order to cover potential job-site breakage. Request a detailed production timeline with milestones and link payments to third-party inspection (e.g., SGS or Intertek) results before the final balance is paid.

What transaction security measures should be taken?

Always use secure payment channels and verify the supplier's Business License and Export Qualifications on the platform. For large-scale projects, utilize Letters of Credit (L/C) or Escrow services to ensure funds are only released upon the presentation of valid Bill of Lading and Quality Inspection Certificates.

How do I ensure the glazing system aligns with local building codes?

Before finalizing the order, provide the supplier with your local wind pressure data and building height. Professional suppliers on Made-in-China.com can provide structural calculations and shop drawings (CAD/BIM). Ensure the thermal break technology used in the aluminum frames is sufficient for your local climate zone to avoid condensation issues.

Related queries