SourcingAI

GPU server

I have found results from10000+products and5000+suppliers aboutGPU server

Commonly used:
US$
Customization Available
Sample Available
Manufacturer First
Product attributes:
Application: Enterprise Level
Instruction System: RISC
Max. CPUs: 2
System Architecture: X86 Server
Server Form Factor: 4U
Storage Capacity: >1TB
Form Factor: 4U
Management Interface: iDRAC
Network Connectivity: 10GbE
Operating System: VMware
Processor Type: AMD EPYC
RAM Capacity: 16GB
Storage Type: NVMe
Number of CPu Threads: 4
Supporting Memory Capacity: >1TB
Power Supply: Redundant PSU
Application: Department Level
Instruction System: CISC
Max. CPUs: 1
Max. CPUs: 4
Max. CPUs: ≥8
System Architecture: Non-X86 Server
Server Form Factor: 2U
Server Form Factor: 1U
Storage Capacity: < 320GB
Storage Capacity: 500-1000GB
Form Factor: 2U
Form Factor: 1U
Form Factor: 8U
Management Interface: BMC
Management Interface: IPMI
Network Connectivity: 100GbE
Network Connectivity: 25GbE
Network Connectivity: 1GbE
Network Connectivity: 40GbE
Operating System: Windows Server
Operating System: Linux
Processor Type: Intel Xeon
RAM Capacity: 128GB
RAM Capacity: 32GB
RAM Capacity: 64GB
Storage Type: SSD
Hybrid Storage(Combination of HDDs and SSDs)
Storage Type: HDD
Number of CPu Threads: 16
Number of CPu Threads: 20
Supporting Memory Capacity: 32GB
Supporting Memory Capacity: ≤8GB
Supporting Memory Capacity: 512GB
Power Supply: Single PSU

Sourcing guidance for Gpu Server

What are the key hardware specifications to consider when sourcing a GPU Server?

When evaluating GPU servers, the most critical factor is the GPU architecture (e.g., NVIDIA H100, A100, or RTX series) and the interconnect technology (like NVLink) which determines data transfer speeds between cards. You must also verify the CPU compatibility (Intel Xeon or AMD EPYC) to ensure no bottlenecks occur, and ensure the Power Supply Unit (PSU) has 80 PLUS Platinum or Titanium efficiency with sufficient wattage (often 2000W+) to handle peak loads.

How do I ensure the GPU server meets international compliance and safety standards?

For cross-border procurement, ensure the equipment carries CE (Europe), FCC (USA), and RoHS (Environmental) certifications. Since these are high-power devices, UL or IEC 60950-1/62368-1 safety reports are essential to prevent fire hazards. Additionally, check for CCC certification if sourcing from China to ensure the product meets national quality benchmarks before export.

What cooling and thermal management features are necessary for high-performance GPU servers?

GPU servers generate immense heat; therefore, you should prioritize servers with redundant high-speed cooling fans (N+1 redundancy) and optimized airflow chassis designs. For enterprise-level AI training, inquire if the supplier supports liquid cooling integration, which can significantly improve PUE (Power Usage Effectiveness) and extend the lifespan of the silicon components.

How can I verify the scalability and technical compatibility of the server?

Confirm the number of PCIe 5.0/4.0 slots available for future expansion and the maximum supported RAM capacity (DDR5 ECC memory). It is vital to ask the supplier for IPMI 2.0 or BMC support for remote management, ensuring your technical team can monitor hardware health and deploy OS images without physical access to the data center.

Cross-Border Procurement Risks and Strategies for GPU Servers

How should I handle the risk of damage during international transit?

GPU servers are heavy and contain fragile high-value components. You must insist on professional server packaging, including anti-static shielding, thick EPE foam buffers, and wooden crate reinforcement. It is highly recommended to purchase comprehensive cargo insurance and request that GPUs be shipped uninstalled in their original retail boxes if the server is not integrated with a specialized mounting rail system to prevent PCIe slot breakage.

What are the trade policy and export control considerations for high-end GPUs?

Be aware of international export controls (such as US EAR regulations) that may restrict the sale of high-performance chips (e.g., H100/A100) to certain regions. Always verify the HS Code (typically 8471.41) and consult with a customs broker to confirm if an export license is required. Sourcing through reputable platforms like Made-in-China.com can help you find suppliers experienced in navigating these complex regulatory frameworks.

How can I ensure transaction security and quality assurance with a new supplier?

Use Trade Assurance or Escrow services to protect your payment until the goods are delivered and inspected. For high-value orders, hire a third-party inspection agency (like SGS or Intertek) to perform a Pre-Shipment Inspection (PSI), specifically testing the server's 'Power-On Self-Test' (POST) and verifying that the GPU serial numbers match the invoice.

What is the best strategy for negotiating price and lead times for GPU servers?

GPU prices fluctuate based on global chip supply. To get the best deal, negotiate based on Total Cost of Ownership (TCO) rather than just the unit price, asking for extended warranties (3-5 years) or spare parts kits. For lead times, clarify if the components are 'In-Stock' or 'Built-to-Order', as the latter can take 4-8 weeks depending on the current semiconductor market demand.

Related queries