SourcingAI

Jack-up drilling rig

I have found results from9000+products and4000+suppliers aboutJack-up drilling rig

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Crawler
Type: Crawler Excavator
Hull Material: Steel
Customized: Customized
Certification: ISO
Max Pay Load: <5000ton
Self Propelled: Yes
Condition: New
Length (Feet): < 100'
Manufacturing Process: CNC Milling
Surface Treatment: Sand Blast
Operation Pressure: Atmospheric Pressure
Material: Cast Steel
Motor: AC Motor
Drill Hole Diameter: >300mm
Drill Hole Depth: 150-200m
Bit Type: Diamond Bit
Drilling Way: Compound
Standard: GB
Energy Source: Ultrasonic
Usage: Special Excavator
Bucket: Backhoe
Transmission: Hydraulic Transmission
Internal Combustion Drive
Bucket Capacity: 0.5~1.0m³
Size: Medium-Sized
Certification: CE
Certification: RoHS
Certification: ISO 9001:2000
Certification: ISO 9001:2008
Certification: SGS
Certification: ISO9001: 2000
Surface Treatment: Powder Coated
Material: Stainless Steel
Motor: DC Motor
Drill Hole Diameter: <100mm
Drill Hole Depth: >150m
Drill Hole Depth: <30m
Drill Hole Depth: <100m
Bit Type: Cone Bit
Bit Type: Drag Bit
Drilling Way: Rotary
Drilling Way: Impactor
Standard: EN
China GB Code
Standard: JIS Code
Standard: TEMA
Standard: ASME
Standard: API
Usage: Marine Excavator
Usage: Mining Excavator

Sourcing guidance for Jack-up Drilling Rig

What are the critical technical specifications to evaluate when sourcing a Jack-up Drilling Rig?

Buyers must prioritize the Maximum Water Depth (typically ranging from 200 to 450 feet) and the Drilling Depth capacity (often up to 30,000 feet). It is essential to verify the Leg Length and Type (triangular lattice vs. cylindrical) to ensure stability against seabed soil conditions. Additionally, check the Cantilever Reach and Variable Deck Load (VDL), as these determine the rig's operational flexibility and ability to carry essential drilling consumables without frequent resupply.

Which international compliance standards are mandatory for offshore drilling units?

The rig must adhere to IMO MODU Code (Code for the Construction and Equipment of Mobile Offshore Drilling Units). It is non-negotiable to have certifications from recognized Classification Societies such as ABS (American Bureau of Shipping) or DNV (Det Norske Veritas). For specific regions, ensure compliance with MARPOL for pollution prevention and SOLAS for safety of life at sea. If sourcing from China, ensure the shipyard follows CCS (China Classification Society) standards equivalent to international benchmarks.

How should a buyer assess the 'Jacking System' reliability?

The jacking system is the heart of the rig. You should request documentation on the Jacking Speed and the Number of Pinions per Leg. Ensure the system features Redundant Power Supplies to prevent failure during elevation. Inquire about the Fixation System used once the rig reaches its working height, as high-quality Rack and Pinion systems significantly reduce wear and tear during the rig's 20-25 year lifespan.

What are the key considerations for the drilling equipment package (DER)?

Verify the Top Drive System (TDS) capacity and the Drawworks horsepower (typically 2,000 to 3,000 HP). The Mud Pump configuration (usually three pumps for redundancy) and the BOP (Blowout Preventer) Stack rating (e.g., 15,000 psi) are critical for well control safety. Ensure the equipment is sourced from reputable global brands or high-tier Chinese manufacturers that offer Global After-sales Service Networks.

Cross-Border Procurement & Risk Management for Offshore Assets

What are the primary risks in cross-border purchasing of heavy offshore equipment?

The most significant risks include Technical Non-compliance with the destination country's maritime laws and Delivery Delays due to complex shipyard schedules. To mitigate this, buyers should utilize Third-Party Inspection Agencies (e.g., SGS or Intertek) to conduct milestone audits during the construction or refurbishment phase. Always use Escrow-based payment terms or Letters of Credit (L/C) to ensure funds are only released upon meeting specific technical 'Class' milestones.

How can buyers effectively negotiate with large-scale shipyards?

Negotiation should focus on the Payment Milestone Structure rather than just the total price. Aim for a lower down payment (e.g., 10-20%) and link the remaining payments to the successful completion of the Sea Trials and Final Acceptance Testing (FAT). Additionally, negotiate for a comprehensive spare parts package for the first two years of operation and on-site crew training included in the contract price.

What logistics and shipping methods are used for Jack-up Rigs?

Jack-up rigs are typically transported via Dry Tow (Heavy Lift Vessels) or Wet Tow (Tugboats). For long-distance cross-border delivery (e.g., China to the Middle East or North Sea), Dry Tow is preferred as it minimizes hull stress and is significantly faster, though more expensive. Ensure the Marine Warranty Surveyor (MWS) approves the transportation plan to maintain insurance validity during transit.

How to ensure transaction security when sourcing via Made-in-China.com?

When sourcing through Made-in-China.com, prioritize Audited Suppliers who have undergone comprehensive on-site verification. Use the platform's Secured Trading Services to protect your deposit. Always request the supplier's Export Licenses for Dual-Use Goods (if applicable) and verify their history of delivering similar offshore structures to international clients to ensure they understand Export Customs Clearance for oversized maritime assets.

Related queries