SourcingAI

Liquid nitrogen production

I have found results from100000+products and30000+suppliers aboutLiquid nitrogen production

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Ice Machine
Application Fields: Chemical
Certification: CE
Condition: New
Noise Level: Low
Parts: Filters
Purpose: Gas Purification
Adsorption Nitrogen Generator
Usage: Industry
Industrial Pure Air
Grade Standard: Industrial Grade
Chemical Property: Non-Flammable Gas
Application: Lab
Customized: Non-Customized
Structure: Portable
Material: Stainless Steel
Working principle: Condensation separation
Application Fields: Electronic
Application Fields: Food
Application Fields: Medical
Application Fields: New Energy
Application Fields: Petroleum
Application Fields: Pharmaceutical
Certification: ISO
Certification: RoHS
Certification: UR
Certification: CCC
Noise Level: Ultra Low
Parts: Adsorption Tower
Parts: Gas Tank
Air Purification Components
Purpose: Gas Separation
Purpose: Gas Manufacturing
Purpose: Gas Storage
Air separation equipment
Structure: Horizontal
Structure: Vertical

Sourcing guidance for Liquid Nitrogen Production

What are the primary technologies used for liquid nitrogen production and how to choose between them?

There are two main technologies: Cryogenic Air Separation and PSA (Pressure Swing Adsorption) combined with a Cryocooler. For large-scale industrial needs (>50L/h), Cryogenic units are most efficient as they produce high-purity liquid nitrogen through distillation at extremely low temperatures. For small to medium laboratory or medical use (1L/h - 20L/h), a PSA system integrated with a Stirling or Gifford-McMahan liquefier is preferred due to its compact size, lower startup time, and ease of operation.

What key technical specifications should a B2B buyer verify before purchasing?

Buyers must confirm the Nitrogen Purity (typically 99.9% to 99.999%), the Liquefaction Rate (Liters per hour), and the Power Consumption (kWh/L). Additionally, check the Cooling Method (Air-cooled vs. Water-cooled); water-cooled systems are more stable in hot climates but require a dedicated water chiller. Ensure the system includes a PLC (Programmable Logic Controller) with a touch-screen interface for automated monitoring of pressure, purity, and liquid levels.

What compliance standards and safety certifications are mandatory for this equipment?

Since these systems involve high pressure and cryogenic temperatures, they must adhere to ASME Section VIII or PED (Pressure Equipment Directive) 2014/68/EU for pressure vessels. The electrical components should carry CE, UL, or CSA markings. For medical applications, look for ISO 13485 certification. It is critical to verify that the supplier provides a Certificate of Conformity (CoC) and pressure test reports for all tanks and piping.

What are the maintenance requirements for long-term operational stability?

Regular maintenance is vital for the Air Compressor (oil and filter changes every 2,000-4,000 hours) and the Air Pre-treatment System (replacing desiccant and activated carbon). For cryogenic cold boxes, ensure the vacuum insulation is intact. Buyers should prioritize suppliers who offer remote diagnostic capabilities and a 2-year spare parts kit including valves, sensors, and gaskets to minimize downtime.

Cross-Border Procurement & Risk Management for Heavy Industrial Equipment

How can buyers mitigate the risks of shipping sensitive cryogenic machinery?

Liquid nitrogen plants contain delicate sensors and high-precision compressors. You must insist on Seaworthy Vacuum Packaging and Reinforced Steel-Framed Crate Packing. Request the installation of Impact Indicators (ShockWatch labels) and Tilt Indicators on the crates. For shipping to distant regions, use CIF (Cost, Insurance, and Freight) terms to ensure the cargo is fully insured against transit damage, and choose carriers experienced in handling Oversized (OOG) cargo if the unit is skid-mounted.

What are the best strategies for negotiating with industrial suppliers on Made-in-China.com?

Focus on the Total Cost of Ownership (TCO) rather than just the initial purchase price. Negotiate for Extended Warranties (24-36 months) and On-site Installation/Commissioning services. Ask the supplier to provide a FAT (Factory Acceptance Test) video or a live stream demonstration before final payment. For large orders, a payment structure of 30% deposit, 60% after FAT, and 10% after successful installation is a standard way to protect your interests.

What transaction security measures should be taken for high-value industrial orders?

Utilize Secured Payment services provided by professional platforms like Made-in-China.com to ensure funds are only released upon proof of shipment. Conduct a Third-Party Factory Audit (e.g., SGS or TÜV Rheinland) to verify the supplier's manufacturing capacity and quality control systems. Ensure the Proforma Invoice (PI) clearly states the technical parameters, lead time, and specific penalties for delays or failure to meet purity standards.

Related queries