SourcingAI

Mould

I have found results from200000+products and60000+suppliers aboutMould

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Special Casting
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Process Combination Type: Single-Process Mode
Application: Car
Runner: Hot Runner
Design Software: UG
Installation: Fixed
Certification: ISO
Standard: HASCO
Customized: Customized
Plastic Material: ABS
Material: Aluminium
Demoulding: Pull Core
Surface Treatment: Heat Treatment
Using Hardness: >HRC45
Average Wall Thickness: >3mm
Mould Life: >1,000,000 shots
Condition: New
Function: Anti-Corrosion
Mold Material: Metal Mold
Runner System: Hot Runner
Cavity Quantity: 48
Processing Method: Forming Mould
Technics: Drawing Die
Process Combination: Single-Process Mould
Manufacturing Technology: Automation Technology
Driving Motor Type: Hybrid
Mold Cavity Technology: CNC Milling
Milling Speed: Normal Speed
Parts Detection Method: Geometric Detection
Plastic Molding Die
Surface Finish Process: Electroplating
Surface Finish Process: Mirror Polishing
Mould Cavity: Multi Cavity
Process Combination Type: Progressive Die
Process Combination Type: Compound Die
Application: Household Appliances
Application: Furniture
Application: Commodity
Application: Electronic
Application: Home Use
Application: Hardware
Runner: Cold Runner
Design Software: Pro-E
Design Software: AutoCAD
Installation: Mobile
Certification: TS16949
Certification: CE
Certification: FDA
Standard: DME
Standard: PUNCH
Plastic Material: PE
Plastic Material: PC
Plastic Material: HDPE
Material: Steel
Hard Alloy and Steel Bonded Carbide

Sourcing guidance for Mould

How to choose the right mould steel grade for high-volume production?

For high-volume production (over 500,000 cycles), you must prioritize high-hardness and wear-resistant steel. For plastic injection, H13 or S136 stainless steel is recommended to prevent corrosion and ensure a mirror finish. For die casting, 8407 or SKD61 steel is essential to withstand thermal fatigue. Always request a Steel Certificate from the supplier to verify the material origin and heat treatment hardness (HRC).

What technical specifications are critical for mould precision and compatibility?

Buyers must specify the mould base standard (e.g., LKM, HASCO, or DME) to ensure global compatibility for spare parts. Key technical parameters include the number of cavities, runner type (Hot Runner vs. Cold Runner), and shrinkage rate calculation based on the specific plastic resin (e.g., ABS, PC, or PP). Ensure the supplier provides 2D/3D CAD designs for approval before steel cutting begins.

How can I verify the quality and lifespan of a mould before shipment?

Implement a Mould Trial (T1, T2, T3) process. The supplier should provide a Mould Trial Report and sample parts for your inspection. Check for defects like flash, short shots, or sink marks. A critical benchmark is the Cycle Time; a shorter cycle time increases your production efficiency. Demand a guaranteed mould life (e.g., 300,000 shots) written into the contract.

What are the compliance and safety standards for industrial moulds?

Moulds must comply with the Machinery Directive 2006/42/EC for European markets, often requiring CE marking. Ensure the mould includes safety protection features like limit switches and transport locking bars. For food-grade or medical products, the mould must be manufactured in a cleanroom environment and use NSF-certified lubricants.

Cross-Border Procurement Risks and Strategic Advice

What are the common risks in cross-border mould purchasing?

The biggest risk is Intellectual Property (IP) leakage and material substitution (using cheaper steel than quoted). To mitigate this, sign a Non-Disclosure Agreement (NDA) and use third-party inspections during the heat treatment stage. Another risk is shipping damage; moulds are heavy and prone to rust, so ensure they are coated with anti-rust oil and packed in vacuum-sealed foil within fumigated wooden crates.

How should I negotiate payment terms and lead times with mould suppliers?

Standard industry payment is 40% deposit, 30% after T1 sample approval, and 30% before shipment. Never pay 100% upfront. For lead times, typical mould fabrication takes 35 to 60 days. Include a penalty clause for delays in the contract to ensure the supplier prioritizes your project. For sourcing reliable manufacturers, platforms like Made-in-China.com offer verified suppliers with audited manufacturing capabilities.

What is the best shipping method for heavy industrial moulds?

Due to the extreme weight, Sea Freight (LCL or FCL) is the most economical method. For urgent modifications, Air Freight is possible but very costly. Ensure the Incoterms are clearly defined; FOB (Free On Board) is recommended as it allows you to control the shipping costs and logistics through your own forwarder.

How can I ensure transaction security in international trade?

Use Secured Payment services provided by reputable B2B platforms like Made-in-China.com to protect your funds until the mould reaches the agreed milestone. Always verify the supplier's Business License and ISO 9001 Certification to ensure they are a legitimate factory and not a middleman.

Related queries