SourcingAI

Oil pump jack

I have found results from30000+products and10000+suppliers aboutOil pump jack

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Hydraulic Jack
Type: Floor Jack
Type: Tower CNC
Type: Claw-Type Jack
Type: Bottle Jack
Certification: ISO 9001:2000
Condition: New
Transmission: Mechanical
Pumping Way: With Rod
Structure: Hydraulic Jack
Power Source: Hydraulic
Max Height: >400mm
Capacity (Load): 41-50T
Certification: ISO 9001:2008
Certification: CE
Certification: RoHS
Certification: EPA
Certification: CS
Transmission: Hydraulic
Pumping Way: Without Rod
Structure: Pneumatic Jack
Power Source: Pneumatic
Power Source: Electric
Max Height: 100-150mm
Max Height: 301-350mm
Max Height: 251-300mm
Max Height: 151-200mm
Max Height: 351-400mm
Capacity (Load): 1-10T
Capacity (Load): 21-30T
Capacity (Load): 31-40T
Capacity (Load): 11-20T

Sourcing guidance for Oil Pump Jack

What are the key technical specifications to consider when selecting an oil pump jack?

Buyers must prioritize the API Spec 11E certification, which is the international standard for pumping units. Key parameters include the Peak Torque Rating (measured in inch-pounds), the Polished Rod Load (PRL) capacity, and the Stroke Length. For deep-well operations, ensure the unit supports long-stroke capabilities to reduce the number of cycles and extend the life of the sucker rod.

How do I evaluate the structural durability and material quality of a pump jack?

Focus on the structural steel grade used for the walking beam and Samson post; high-strength low-alloy steel is preferred. The gearbox is the heart of the unit; verify that it uses double-reduction herringbone gears or high-quality helical gears for balanced loading. Additionally, check for heavy-duty bearings with centralized lubrication systems to minimize maintenance downtime in harsh oilfield environments.

What compliance and safety standards are mandatory for international oilfield equipment?

Beyond API 11E, ensure the manufacturer complies with ISO 9001 for quality management. For electrical components (motors and control panels), look for UL, CSA, or CE markings, and specifically ATEX or IECEx certifications if the unit will be operated in explosive atmospheres (Zone 1 or Zone 2). Safety guards for the crank and belt are essential for OSHA or regional safety compliance.

What are the common usage scenarios and power options for these units?

Oil pump jacks are primarily used for artificial lift in mature wells. Depending on the site infrastructure, you should choose between Electric Motors (high efficiency, low maintenance) or Gas Engines (ideal for remote locations using wellhead gas). For modern operations, ensure the controller is compatible with VFD (Variable Frequency Drives) and SCADA systems for remote monitoring and stroke optimization.

Cross-Border Procurement & Risk Management for Heavy Machinery

How can I mitigate the risks of purchasing heavy industrial equipment from overseas?

Utilize Third-Party Inspections (TPI) such as SGS or Intertek to conduct a Pre-Shipment Inspection (PSI). They should verify the weld quality (NDT testing), gearbox noise levels, and overall dimensions against the technical data sheet. Always use Secure Payment Terms like a Letter of Credit (L/C) or trade assurance services provided by Made-in-China.com to ensure funds are only released upon proof of shipment.

What are the logistics and shipping considerations for oversized oilfield equipment?

Oil pump jacks are typically shipped as Breakbulk cargo or in Open Top/Flat Rack containers due to their weight and dimensions. Ensure the supplier provides a detailed Packing List and Crating Plan to prevent corrosion during sea transit. It is critical to clarify Incoterms; for such heavy equipment, CIF or DAP is often preferred by buyers to shift the complex logistics risk to the experienced exporter.

How should I negotiate with suppliers to ensure long-term operational reliability?

Negotiate for a comprehensive spare parts package (including seals, belts, and bearings) to be included in the initial purchase, covering at least 2 years of operation. Demand a minimum 12-18 month warranty that includes technical remote support. For large-scale projects, negotiate a retention payment (typically 5-10%) to be paid only after the successful installation and commissioning of the unit at the wellsite.

Related queries