Overshot price
I have found results from2000+products and800+suppliers aboutOvershot price
High Performance Overshot for Wireline Drill Rod Operations
7-1 Fishing Tools Releasing and Circulating Overshot for Drilling
Drilling Fishing Tools Releasing and Circulating Overshot 150 Series
Downhole Drilling Dlt-T Type Releasing and Reversing Overshot Fishing Tool
Vsp-OS 150 Series Downhole Overshot for Oil Well Drilling Fishing Tools
China API Downhole Fishing Tools Releasing and Circulating Overshot Manufacturer
Mining Diamond Drilling Tool, Bq Nq Hq Pq Wireline Core Barrel/Overshots
Diamond Drilling Tools/Hq Core Barrel Wireline Overshot
Nq Wireline Overshot for Geological Drilling Core Accessories
Pq Wireline Overshot for Geological Drilling Core Barrel
Overshot Assembly Wireline Drilling for Geological Exploration Bq Nq Hq Pq
API Standard Good Price Releasing and Circulating Overshot for Downhole Tools
High-Performance Wireline Core Barrel Head Assembly with Diamond Overshot
Reliable Pq Core Drilling Overshot for Global Distributors
Wuxi Forged Carbon Steel Fishing Tap Overshot for Mining Applications
China Factory Crown Geotec Core Barrel Overshot for Wireline Drilling Tool
Hq Corebarrel Overshot for Double Tube Surface Diamond Drilling
Professional Bwl Nwl Hwl Pwl Core Recovery Overshot for Wireline Coring
API Standard Fishing Tool Series 70 Short Catch Overshot
Bowen Equivalent Fishing Tool Dlt-T Releasing and Reversing Fishing Overshot Bowen Equivalent
API Fishing Tool Lifting-Lower and Releasing Overshot
Sourcing guidance for Overshot Price
What are the key technical specifications to consider when sourcing an overshot?
When purchasing an overshot, you must prioritize API 7-1 certification to ensure the tool meets international oilfield standards. Key technical parameters include the Maximum Catch Size, Outer Diameter (OD) to ensure it fits within the wellbore casing, and the Tensile Strength required to pull the stuck fish. You should also specify the type of grapple needed—Basket Grapples for smaller diameter fish or Spiral Grapples for larger diameters—and ensure the Top Sub connection matches your existing drill string threads (e.g., API Regular or IF).
How do I ensure the overshot is suitable for specific well conditions?
For high-pressure, high-temperature (HPHT) environments, verify that the sealing elements (Pack-off rubbers) are made of high-grade elastomers like Viton or Nitrile to prevent leakage. If the well contains corrosive elements like H2S, you must request NACE MR0175/ISO 15156 compliance to ensure the steel is resistant to sulfide stress cracking. Additionally, confirm if the tool is a Releasing Type, which allows for disengagement if the fish cannot be pulled.
What quality control measures should be requested from the manufacturer?
Demand a Material Test Report (MTR) to verify the chemical composition and heat treatment of the alloy steel (typically 4140 or 4340). You should also require Non-Destructive Testing (NDT), specifically Magnetic Particle Inspection (MPI) or Ultrasonic Testing (UT), to check for surface and internal cracks in the bowl and grapples. A Load Test Report is also recommended to confirm the tool can handle its rated pulling capacity.
Cross-Border Procurement & Risk Management for Oilfield Tools
How can I mitigate the risk of receiving sub-standard industrial equipment?
Utilize Third-Party Inspection (TPI) services such as SGS, BV, or Intertek to conduct a pre-shipment inspection at the factory. For secure transactions, use the Secured Trading services on Made-in-China.com, which ensure that payment is only released to the supplier once you confirm the shipping documents or inspection reports meet your requirements.
What are the logistics considerations for shipping heavy steel tools internationally?
Overshots are heavy and dense; therefore, Sea Freight (LCL or FCL) is the most economical method. Ensure the supplier uses seaworthy export packaging, such as reinforced wooden crates with anti-rust oil coating and VCI (Volatile Corrosion Inhibitor) plastic wrapping to prevent saltwater corrosion during transit. Clearly define Incoterms (e.g., FOB or CIF) to establish who is responsible for insurance and local port charges.
How should I negotiate pricing and lead times for bulk orders?
For orders exceeding 5-10 units, aim for a volume discount of 10-15%. Since these tools often require precision machining, lead times can range from 20 to 45 days. Negotiate a staggered payment term (e.g., 30% deposit, 70% against Bill of Lading) and include a liquidated damages clause in the contract for significant delivery delays to protect your project timeline.





























