SourcingAI

Prepayment electricity meter

I have found results from8000+products and2000+suppliers aboutPrepayment electricity meter

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Energy Meter
Type: High-voltage
Display: Digital
Installation: Direct Connected
Usage: Watt-Hour Meter
Electric Equipment: Single-phase
Theory: Electronic Meter
Power Meter Connection: Terminal
Measured Signal: Pulse Peak
Certification: CE
Customized: Non-Customized
Structure: Three-column Disconnector
Operation: Hydraulic
Grounding Mode: Grounding
Horizontal Rotary Type
Number of Poles: Three Pole
Grounding: Single Ground
Series: Three
Turn the Horizontal
Switching Mode: Double-Throw Type
Common Model: DR
Structure of Operating: Electric
Display: Indicator
Installation: Indirect Connected
Multi-Functional Energy Meter
Meter for Industry and Home Use
Standard Electric Energy Meter
Usage: Prepayment Meter
Reactive Energy Meter
Multi-rate Watt-hour Meters
Maximum Demand Meter
Electric Equipment: Three-phase Four-wire
Theory: Static Meter
Theory: Induction Meter
Power Meter Connection: Feed-through Type
Measured Signal: Continuous Wave
Certification: ISO
Certification: GS
Certification: RoHS
Certification: IS9001
Certification: ISO9001
Certification: ISO9002
Certification: ISO2000
Customized: Customized

Sourcing guidance for Prepayment Electricity Meter

What are the key technical specifications to consider when selecting a prepayment electricity meter?

Buyers must prioritize STS (Standard Transfer Specification) compliance to ensure global interoperability for token-based systems. Key metrics include Accuracy Class (typically Class 1.0 or 0.5s), Current Rating (e.g., 5(60)A or 10(100)A), and Ingress Protection (IP54 or higher) for environmental durability. Additionally, verify if the meter supports split-type installation (UIU - User Interface Unit) to prevent tampering by placing the measurement unit in a secure pole-top box.

Which communication protocols are essential for modern AMI (Advanced Metering Infrastructure) integration?

For remote monitoring and top-ups, ensure the meters support DLMS/COSEM protocols. Hardware-wise, look for modular designs that allow for GPRS/4G, NB-IoT, LoRaWAN, or PLC (Power Line Carrier) communication modules. This flexibility ensures the meter can integrate with your existing Vending Systems and Head-End Systems (HES) without requiring a full hardware overhaul.

What compliance standards and certifications are mandatory for international trade?

The product must adhere to IEC 62053-21/22 for electricity metering equipment. For European markets, MID (Measuring Instruments Directive) certification is mandatory. Furthermore, ensure the supplier provides STS Association certification to guarantee that the encryption for credit tokens is secure and standardized.

How can anti-tampering features protect utility revenue?

Professional-grade meters should include magnetic field detection, terminal cover open detection, and bypass circuitry alerts. The meter should be programmed to automatically disconnect the load upon detection of unauthorized access and log the event in the non-volatile memory for audit purposes.

Cross-Border Procurement & Risk Management for Smart Meters

How can I mitigate the risk of software incompatibility with local vending systems?

Request a SDK (Software Development Kit) or API documentation from the supplier before purchasing. It is highly recommended to order a sample set (Meter + Customer Interface Unit + Vending Software) to conduct a pilot test. Ensure the supplier on Made-in-China.com offers technical support for system integration to avoid purchasing 'blind' hardware that cannot be topped up locally.

What are the best practices for negotiating warranty and after-sales support for electronic components?

Given the 10-15 year expected lifespan of meters, negotiate a minimum 2-3 year replacement warranty. Insist on a 0.5% - 1% spare parts allowance (buffer stock) included in bulk shipments. For large-scale utility projects, verify if the supplier can provide remote technical training for your local engineers on meter calibration and troubleshooting.

What shipping precautions should be taken for sensitive electronic measuring instruments?

Meters contain sensitive LCDs and relays; ensure the packaging meets ISTA 3A standards for drop and vibration protection. Specify the use of anti-static packaging and moisture-absorbent silica gel packets. For sea freight, confirm that the containers are hermetically sealed to prevent salt-air corrosion of internal copper terminals.

How do I ensure transaction security when dealing with high-value industrial orders?

Utilize Secured Trading services provided by platforms like Made-in-China.com to ensure payment is only released upon verified shipment. For large contracts, consider using a Letter of Credit (L/C) and hiring a third-party inspection agency (like SGS or Intertek) to perform a Pre-Shipment Inspection (PSI) to verify the firmware version and calibration constants match your requirements.

Related queries