Putzmeister
I have found results from10000+products and4000+suppliers aboutPutzmeister
273827007, 272318009, 222895006, 062277004, 223192009 Putzmeister Concrete Pump Filter Elements
Casting Steel DN100 Concrete Pump Pipe Clamp for Putzmeister Sany
Remanufactured 38m Putzmeister Used Second Hand Beton Veichel Concrete Boom Pump Truck
Remanufactures 38m Putzmeister Used Second Hand Concrete Boom Pump Truck
SMT Concrete Pump Spare Parts Factory Supply Zoomlion for Sanny Putzmeister Schwing
Used Putzmeister 36m 38m 42m 46m 49m 56m Mercedes Benz Euro 5 Concrete Boom Pump
Hydraulic Spare Parts for Sanny Zoomlion Cifa Xxcimg Schwing Putzmeister Concrete Pumps Remote Control
Putzmeister Schwing Cifa Twin Wall Concrete Pump Delivery Pipes
Putzmeister Concrete Pump S Valve Assembly Concrete Pump Spare Parts
Putzmeister Concrete Pump Liner DN230*2320 Cement Delivery (Convey) Component Cylinder Pipe
Concrete Pump Spectacle Wear Plate & Cutting Ring DN180/200/230, Fit Sanyi Putzmeister Schwing
China Zoomlion Cifa Sanyi Putzmeister Schwing Small Mini Mobile Truck Mounted Concrete Pump 20m to 68m Concrete Pump for Sale
Concrete Pump Truck Delivery Pipe End Shutoff Valve for Sany Zoomlion XCMG Putzmeister Schwing
Hamac Dhbt30 Concrete Machinery Putzmeister Stationary Trailer Diesel Cement Concrete Pump for Sale
Putzmeister Genuine Replacement Maintenance Parts Long Lasting Durable Components Concrete Pump
Construction Machinery Putzmeister 36m Benz Concrete Placing Boom Used Truck Mounted Concrete Pump Beton Pump Machine
Remanufactures 38m Putzmeister Used Second Hand Beton Pumping Veichel Concrete Boom Pump Truck
Used Construction Equipment Putzmeister 38m 46m Concrete Pump Truck
Used Refurbished Putzmeister 38m Concrete Pump Truck I*Uzu Chassis for Sale
Concrete Pump S Valve DN180 S Pipe for Zoomlion/ Putzmeister
New Putzmeister San Yi Remote Control for 71m 5-Axle China Trade Hydraulic Pump Truck Mounted Concrete Pump Truck
Used Putzmeister 37m Concrete Boom Pump Truck with 6×4 Heavy Duty Chassis
Sourcing guidance for Putzmeister
What are the key technical specifications to verify when sourcing Putzmeister-compatible concrete pumps?
When sourcing, you must prioritize Max. Theoretical Output (m³/h) and Max. Concrete Pressure (bar) to ensure the machine meets your project requirements. For truck-mounted pumps, verify the Boom Reach (meters) and the number of sections (e.g., 4-stage or 5-stage RZ fold). Ensure the engine is a reputable brand like Deutz or Cummins for global maintenance availability, and check that the S-Valve system is made of high-wear-resistant alloy to prolong service life.
How can I ensure the quality and compatibility of Putzmeister spare parts?
To guarantee compatibility, always provide the Part Number or Serial Number from the original Putzmeister manual. Focus on the Spectacle Plate and Cutting Ring, which should be made of Tungsten Carbide for maximum durability. For delivery cylinders, ensure they are hard-chromed to a thickness of at least 0.3mm. Requesting a Material Test Report (MTR) is essential to verify the hardness and composition of wear parts.
What international compliance standards should these heavy machines meet?
For European markets, the equipment must have CE Marking and comply with EN 12001 (safety requirements for conveying, spraying, and placing machines for concrete). For the US market, ensure compliance with ANSI A10.27. Additionally, verify that the pressure vessels (accumulators) have the necessary ASME or PED certifications to avoid legal and safety risks during operation.
What are the usage scenarios and maintenance requirements for Putzmeister equipment?
These pumps are designed for high-rise building construction, bridge piling, and long-distance tunneling. Maintenance is critical: the centralized lubrication system must be checked daily. The hydraulic oil should be replaced every 500 to 1,000 operating hours, and the delivery pipes should be rotated regularly to ensure even wear and prevent bursting under high pressure.
Cross-Border Procurement Strategy for Heavy Machinery
How can I mitigate the risk of receiving refurbished machinery instead of new equipment?
Engage a third-party inspection agency (such as SGS or BV) to conduct a pre-shipment inspection. They should verify the engine hours, chassis VIN, and hydraulic pump serial numbers. On Made-in-China.com, prioritize Audited Suppliers who provide comprehensive factory walk-through videos and clear photos of the nameplates and internal components.
What are the best practices for negotiating price and terms with heavy equipment suppliers?
Negotiate based on Total Cost of Ownership (TCO) rather than just the sticker price. Ask for a 'Wear Parts Package' (extra pistons, seals, and rings) to be included in the initial purchase, which can save 15-20% compared to buying them separately later. For payment, use Letter of Credit (L/C) or Escrow services to ensure funds are only released upon verification of shipping documents.
What logistics and shipping precautions are necessary for concrete pumps?
Due to the size and weight, these are typically shipped via Ro-Ro (Roll-on/Roll-off) or Flat Rack containers. Ensure the supplier applies a heavy-duty anti-corrosion wax coating to all exposed metal and pistons to prevent sea-salt erosion during transit. Confirm that the shipping insurance covers 'Loading and Unloading' risks, as most damage occurs during port handling.
How do I handle international trade policy and customs for this category?
Check the HS Code (typically 841340) for specific import duties in your country. Be aware of Anti-Dumping Duties that may apply to steel components or heavy vehicles from certain regions. Ensure the supplier provides a Certificate of Origin (CO) to take advantage of any Free Trade Agreements (FTA) that could reduce your tariff burden by 5-10%.





























