SourcingAI

Small film blowing machine

I have found results from20000+products and10000+suppliers aboutSmall film blowing machine

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
PE Film Blowing Machine
PVC Film Blowing Machine
Dual Head Plastic Film Blowing Machine
PP Film Blowing Machine
Multi-Layer Co-extrusion Film Blowing Machine
Maximum Folding Width of Film: 1500mm
Automation: Automatic
Computerized: Computerized
Raw Material: PE
Screw Diameter: 45mm
Machine Weight: 4T
Certification: CE
Maximum Folding Width of Film: 600mm
Maximum Folding Width of Film: 1200mm
Maximum Folding Width of Film: 800mm
Maximum Folding Width of Film: 1000mm
Maximum Folding Width of Film: 3000mm
Automation: Non-Automatic
Computerized: Non-Computerized
Raw Material: HDPE
Raw Material: LDPE
Raw Material: PVC
Screw Diameter: 65mm
Screw Diameter: 50mm
Screw Diameter: 55mm
Screw Diameter: 120mm
Machine Weight: 10T
Machine Weight: 12T
Machine Weight: 8T
Certification: ISO9001:2008
Certification: QS
Certification: GMP

Sourcing guidance for Small Film Blowing Machine

What are the key technical specifications to consider when selecting a small film blowing machine?

When evaluating a small film blowing machine, you must prioritize the screw diameter (typically 30mm to 50mm) and the L/D ratio (Length-to-Diameter), which should ideally be 28:1 or 30:1 to ensure superior plasticization. Additionally, check the die head design; a spiral mandrel die head is preferred for uniform film thickness. Ensure the machine supports the specific materials you intend to use, such as LDPE, HDPE, or LLDPE, and verify the maximum folding width of the film to match your production requirements.

How can I ensure the machine meets international safety and quality standards?

For cross-border procurement, it is critical to verify that the equipment carries the CE Certification for the European market or meets UL standards for North America. You should request ISO 9001 certification from the manufacturer to ensure consistent quality management. Furthermore, ask for a factory acceptance test (FAT) report and video demonstrations of the machine running at full capacity to verify vibration stability and noise levels (should be <85dB).

What features contribute to the economic feasibility and energy efficiency of the machine?

To optimize operational costs, look for machines equipped with inverter-controlled motors (e.g., Delta or ABB brands), which can reduce energy consumption by 20-30%. High-efficiency ceramic heaters are also recommended for faster heating and better heat retention. Additionally, consider a machine with an automatic winding unit and surface friction rewinding, as these features reduce labor costs and minimize material waste during roll changes.

What are the common usage scenarios for a 'small' scale film blowing machine?

Small film blowing machines are ideal for laboratory testing, biodegradable film R&D, and small-batch production of packaging materials like vest bags, fruit bags, and garbage bags. They are particularly suited for startups or specialized manufacturers who require frequent color changes or material switching, as the smaller barrel size results in less purged waste compared to large-scale industrial lines.

Cross-Border Procurement Strategy & Risk Management

How should I handle the risks associated with shipping heavy machinery internationally?

Machinery is susceptible to rust and physical damage during sea freight. Insist that the supplier uses vacuum packaging and anti-rust oil coating for the screw and die head. The machine must be secured in a fumigated wooden case or a steel frame with reinforced tie-downs. For shipping to countries with specific voltage requirements, confirm the transformer and plug compatibility (e.g., 220V/380V, 50Hz/60Hz) before the machine leaves the factory.

What are the best practices for negotiating with Chinese machinery suppliers?

Focus your negotiations on the warranty period for core components (like the screw and gearbox) rather than just the unit price; aim for at least 12 to 24 months. Request a wearing parts kit (heaters, thermocouples, and filters) to be included in the initial price. For secure transactions, utilize Trade Resources on Made-in-China.com to verify the supplier's 'Audited Supplier' status and use secured payment terms like L/C (Letter of Credit) or escrow services.

How can I manage after-sales support and technical installation remotely?

Since on-site installation can be expensive, prioritize suppliers who provide detailed English manuals, step-by-step installation videos, and remote technical support via video call. Confirm if the supplier has local service partners in your region. It is also wise to negotiate a 7-day trial period post-installation where the supplier remains on standby for troubleshooting.

Related queries