SourcingAI

sourcing

I have found results from200000+products and60000+suppliers aboutsourcing

Commonly used:
US$
Customization Available
Sample Available
Manufacturer First
Product attributes:
Type: Interpretation
International Aviation Service
Type: Sea-Air
Type: Sodium Silicate
Type: Pull-Line Fitting
Type: LSAW Pipe
Type: Inert Solvent
Type: Sodium Sulfate
Destination: Poland
Languages: English
Standard: DIN
Connection: Female
Surface Treatment: Galvanized Sheet
Head Type: Allotype
Transit Time: 12 Days
FCL and LCL
Cargo Type: General Cargo
Departure: Shenzhen
Total Supply: 8000-10000 kg
Departure Day: Daily
Unipolar Integrated Circuit
Integration: VLSI
Thick Film IC
Purity: ≥99%
Appearance: Liquid
Grade Standard: Industrial Grade
Transit Port: Alataw Pass
Route: International
Certification: GMP
State: Solid
Volatile: Not Volatile
Usage: Substation Fittings
Application: Automotive Industry
Length: 50 feet
316 Stainless Steel
Outer Diameter: 2 inch
Wall Thickness: Schedule 40
Composition: Organic
Processing Material: Agronomic Products
Customized: Customized
Power Source: Electric
Automatic Grade: Semi-Automatic
Destination: Switzerland
Destination: Finland
Destination: Denmark
Destination: New Zealand
Destination: Malaysia
Destination: Taiwan
Destination: Vietnam
Destination: India
Destination: Philippines
United States of America
Destination: Canada
Destination: Brazil
Destination: Peru
Destination: Mexico
The United Kingdom
Destination: France
Destination: Germany
Destination: Spain
Destination: Portugal
Destination: Italy
Destination: Norway
Destination: Sweden
Destination: Russia
Destination: Thailand
Destination: Indonesia
Destination: Japan
Destination: South Korea
Destination: South Africa
Destination: Australia
Destination: Egypt
Destination: Turkmenistan
Destination: Uzbekistan
Destination: Tajikistan
Destination: Kyrgyzstan
Destination: Kazakhstan
Destination: Myanmar
Destination: Netherlands
Destination: Ukraine
Destination: Mongolia
Destination: Shanghai
Destination: Beijing
Destination: Tianjin
Destination: Dalian
Transit Time: 15-30 Days
Transit Time: 30-40 Days
Transit Time: 10 Days
Cargo Type: Special Cargo
Departure Day: Sunday
Technics: Welding
Appearance: Powder
Appearance: Flake
Grade Standard: Medicine Grade
Certification: FDA
Certification: CE
Certification: ISO9001
Certification: CCIC
Certification: CIQ
Certification: RoHS
Certification: ISO
Usage: Line Fittings
Application: Chemical Industry
Application: Food Industry
Oil and Gas Industry
Application: Pharmaceutical Industry
Sourcing
Satisfies 1 requirementMade-in-China.com

Sourcing

US$4.00-4.20
1 Piece(MOQ)

Sourcing guidance for Sourcing

What technical specifications are critical when selecting an Industrial Solar ESS?

Buyers must prioritize Battery Chemistry, with Lithium Iron Phosphate (LiFePO4) being the industry standard for safety and a cycle life of 6,000+ cycles. Key metrics include Depth of Discharge (DoD) of 90% or higher, Round-trip Efficiency (>95%), and C-rate (charging/discharging speed). Ensure the system includes a robust Battery Management System (BMS) to monitor cell voltage, temperature, and state of charge (SoC) in real-time.

Which international compliance standards should I verify for solar storage products?

To ensure safety and legal entry into global markets, verify certifications such as UL 1973 (for stationary batteries), UL 9540 (for the complete system), and IEC 62619. For European markets, CE marking and UN38.3 (for safe transport of lithium batteries) are mandatory. Always request Material Safety Data Sheets (MSDS) and Flash Point reports from the supplier.

How do I evaluate the economic feasibility and ROI of a high-capacity ESS?

Calculate the Levelized Cost of Storage (LCOS) rather than just the initial purchase price. Consider the warranty period (typically 10 years) and the degradation rate (ensure at least 70-80% capacity retention at the end of the warranty). Factor in installation costs, maintenance requirements, and potential government subsidies or tax credits available in your specific region.

What are the key usage scenarios for industrial-grade solar storage?

Common applications include Peak Shaving (reducing electricity costs by using stored energy during peak tariff hours), Emergency Backup/UPS for critical infrastructure, and Off-grid Power Supply for remote mining or construction sites. For large-scale projects, ensure the system supports Parallel Scaling to increase capacity as energy demands grow.

Cross-Border Procurement Risks and Logistics Strategies

What are the primary risks in cross-border purchasing of lithium-based energy systems?

The most significant risks include Logistics Hazards (lithium batteries are Class 9 Dangerous Goods) and Quality Variance. To mitigate these, use Third-party Inspections (such as SGS or Intertek) before the final payment. Ensure the transaction is protected by Trade Terms on Made-in-China.com to secure your funds until the goods meet the agreed-upon specifications.

How should I negotiate with suppliers for large-scale solar projects?

Focus on Tiered Pricing based on total Megawatt-hour (MWh) capacity. Negotiate for Spare Parts (1-2% of total order) to be included at no extra cost. Demand a Performance Guarantee clause in the contract that specifies penalties if the system fails to meet the rated efficiency or capacity during the first year of operation.

What are the best practices for shipping heavy industrial batteries to specific countries?

Due to the weight and hazardous nature, Sea Freight is the only viable option for bulk orders. Use Incoterms like DDP (Delivered Duty Paid) if you want the supplier to handle customs clearance and 'last-mile' delivery, or FOB (Free On Board) if you have a specialized forwarder experienced in Dangerous Goods (DG) containers. Ensure the packaging meets UN-certified standards to prevent movement and thermal runaway during transit.

How can I ensure transaction security when dealing with overseas manufacturers?

Always verify the supplier's Business License and Factory Audit Reports on Made-in-China.com. Use Escrow-based payment methods and avoid direct wire transfers to private accounts. For high-value industrial equipment, it is standard practice to use a 30% deposit and 70% balance payment after the presentation of the Bill of Lading (B/L) and successful inspection reports.

Related queries