Steam-turbine
I have found results from50000+products and10000+suppliers aboutSteam-turbine
Energy-Saving 15MW Condensing Steam Turbine Generator Unit Model N15-4.9
High-Speed 1.5MW Back-Pressure Steam Turbine Generation for Industrial Applications B1.5-3.43/0.981
High-Efficiency 6MW Back-Pressure Steam Turbine Generator Sets for Industrial B6-3.43/0.785
30MW Back-Pressure Steam Turbine B30-4.9/0.98 High-Efficiency for Steel & Chemical Plants
10MW Extraction Back Pressure Steam Turbine for Industrial Steam System Retrofit CB10-8.83
Waste Heat Steam Turbine Generator/ Driving Turbine for Pump/Fans/Energy Saving
Back-Pressure Industrial Steam Turbine for Driving Pumps (T530)
High-Efficiency Back Pressure Steam Turbine Generator for Power Generation (T580)
Condensing Steam Turbine Generator for Waste Heat Power Generation (T710)
Back-Pressure Steam Turbine Generator for Waste Heat Power Generation (T540)
1MW Condensing Steam Turbine for Power Generation (T562-1)
Qingdao Jieneng 1~60MW Thermal Power Plant Steam Turbine and Generator
Palm Oil Mill Steam Turbine 10, 000 Kw Commercial Grade X22crmov Automatic Mode Heat Paint Surface Industrial OEM Available
Industrial Steam Turbine Generator with Best Price
Condensing Steam Turbine for Large Scale Power Station
Palm Oil Mill Steam Turbine 10, 000 Kw Commercial Grade X22crmov Automatic Mode Heat Paint Surface Industrial OEM Available
Small Steam Turbine for Small Industrial Boilers, Waste Heat Recovery Power Generation
Industrial Steam Turbine Generator with Best Price
Customized on Demand Stage Diaphragm of Steam Turbine
High Efficiency Long Time Use Low-Pressure Steam Turbine for Industrial Power Plants
Waste Heat Recovery Power Generation/ Steam Turbine for Power Plant
3MW-6MW Back High Efficiency Automatic Control Pressure Steam Turbine for Power Plant
Sourcing guidance for steam-turbine
What are the key technical specifications to evaluate when sourcing a steam turbine?
Buyers must prioritize rated power output (MW), inlet steam pressure, and inlet steam temperature to ensure compatibility with the boiler system. It is critical to verify the turbine type (e.g., Condensing, Back-pressure, or Extraction) based on whether the goal is pure power generation or combined heat and power (CHP). Additionally, check the heat rate and isentropic efficiency, as even a 1% difference can significantly impact long-term fuel costs.
Which international compliance standards are mandatory for steam turbines?
To ensure safety and operational reliability, turbines must adhere to IEC 60953 for thermal acceptance tests and ISO 10816 for mechanical vibration standards. For the North American market, ASME PTC 6 is the gold standard for performance testing. Ensure the supplier provides CE marking for European markets and holds ISO 9001 for manufacturing quality management and ISO 14001 for environmental management.
How should a buyer assess the material quality and durability of turbine blades?
Turbine blades are subject to extreme centrifugal force and high-temperature corrosion. Demand the use of high-grade stainless steel or nickel-based superalloys (such as Inconel) for the high-pressure stages. Request Non-Destructive Testing (NDT) reports, including Ultrasonic Testing (UT) and Magnetic Particle Inspection (MPI), to confirm the absence of internal fractures or casting defects.
What integration and control system requirements should be confirmed?
Modern steam turbines require a robust Digital Electro-Hydraulic (DEH) Control System for precise speed and load regulation. Ensure the system supports Modbus or Profibus protocols for seamless integration with the plant's Distributed Control System (DCS). Verify that the Emergency Trip System (ETS) is independent and fail-safe to prevent overspeed catastrophes.
Cross-Border Procurement Risks and Strategic Advice
How can buyers mitigate the risks of purchasing heavy industrial machinery cross-border?
Utilize third-party pre-shipment inspections (PSI) from reputable firms like SGS or Intertek to verify technical specs before the final payment. For secure transactions, use Letters of Credit (L/C) or the secure payment services provided by Made-in-China.com to ensure funds are only released upon meeting specific shipping milestones.
What are the logistics and shipping considerations for oversized steam turbines?
Steam turbines are heavy-lift cargo that often require Breakbulk shipping or Flat Rack containers. Ensure the supplier provides a detailed packing list with center-of-gravity markings and uses VCI (Volatile Corrosion Inhibitor) packaging to prevent sea-salt corrosion during transit. Confirm that the Incoterms are clearly defined, preferably CIF or DAP, to include insurance for high-value assets.
How should after-sales support and installation be negotiated with international suppliers?
Negotiate a contract that includes on-site installation supervision and commissioning by the supplier's engineers. Ensure the agreement specifies a warranty period of at least 12 to 24 months and guarantees the availability of critical spare parts (like bearings and seals) for at least 10 years. Request a localized service partner or a 24-hour technical response window.





























