SourcingAI

Sur ron light bee x

I have found results from1000+products and300+suppliers aboutSur ron light bee x

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Dirt Bike
Wattage: >500W
Battery Voltage: >60V
Battery Type: Lithium Battery
Wheel Size: 18"
Motor: Brushless
Frame Material: Aluminum Alloy
Certification: CE
Folded: Folded
Max Speed: >60km/h
Range per Power: >60km
Tire Size: 18inch
Power: >2000W
Voltage: 60V
Starting System: Electric Start
Engine: 4 Stroke
Cylinder Quantity: 1
Fuel: Electric
Seat High: 610MM
Condition: New
Displacement: 126-250CC
Wattage: 351-500W
Battery Voltage: 60V
Battery Voltage: 48V
Battery Type: Storage Battery
Wheel Size: 14"
Wheel Size: 20"
Frame Material: Carbon Steel
Frame Material: Steel
Certification: EEC
Certification: EN15194
Certification: ISO
Certification: CQC
Certification: EPA
Certification: COC
Certification: DOT
Folded: Unfolded
Max Speed: 20-40km/h
Max Speed: 41-60km/h
Range per Power: 31-60km
Tire Size: 10inch
Tire Size: 14inch
Power: 501-1000W
Power: 351-500W
Voltage: 72V
Voltage: 48V

Sourcing guidance for Sur Ron Light Bee X

What are the key technical specifications to verify when sourcing a Sur Ron Light Bee X for commercial resale?

Buyers must prioritize the 60V/32Ah or 60V/40Ah high-density lithium battery configurations to ensure competitive range. Verify the motor output is the authentic 5KW to 6KW peak power version with a Sine Wave Controller (X-Controller) for smooth torque delivery. Ensure the frame is constructed from 6061 T6 aluminum alloy with a weight not exceeding 50kg to maintain the model's signature power-to-weight ratio.

Which compliance standards are mandatory for importing electric off-road bikes into major markets?

For the US market, ensure the product meets UL 2271 for battery safety and CPSC requirements. For the EU, the bike must have CE certification, and if intended for road use, it requires L1e-B EEC/COC (Certificate of Conformity) documentation. Always request UN38.3 and MSDS reports for the lithium batteries to facilitate legal international shipping.

How can I distinguish between an authentic Sur Ron and 'white-label' clones during the sourcing process?

Check for the Intersect TR frame design patent and the specific KKE or Fastace suspension components. Authentic units feature a unique 17-digit VIN stamped on the head tube. Request a factory authorization letter or a distributor certificate from the supplier on Made-in-China.com to verify their relationship with the original manufacturer, Shanzhen Jiuzhou Technology.

What are the recommended maintenance and after-sales requirements for fleet buyers?

Ensure the supplier provides a 12-month warranty on core components (Motor, Controller, Battery). For B2B buyers, it is critical to negotiate a 1-2% spare parts kit (including brake pads, drive belts, and spokes) to be included with bulk orders. Confirm the availability of English-language service manuals and video technical support.

Cross-Border Procurement & Risk Management for Electric Motorcycles

What are the primary risks when shipping high-capacity lithium battery vehicles internationally?

The main risk is Class 9 Hazardous Goods classification, which leads to higher freight costs and stricter documentation. Ensure your forwarder is experienced in DG (Dangerous Goods) handling. Failure to provide a proper Battery Test Summary can result in customs seizures or heavy fines at the port of entry.

How should I negotiate pricing and MOQs with suppliers on Made-in-China.com?

Focus on tiered pricing; while a single sample may cost $3,500-$4,200, bulk orders of 10+ units should see a reduction of 15-20%. Use Secured Trading Services on the platform to hold payments in escrow until the Bill of Lading (B/L) is verified. Always clarify if the price is FOB (Free on Board) or DDP (Delivered Duty Paid), as duties on electric vehicles can be significant.

What is the most cost-effective shipping method for Sur Ron bikes to the US or Europe?

For orders of 5 units or more, LCL (Less than Container Load) sea freight is the most economical. For the US, utilize West Coast ports (LA/LB) to minimize transit time. For Europe, the China-Europe Railway Express offers a middle ground between expensive air freight and slow sea freight, typically delivering in 25-35 days.

How can I ensure transaction security and quality assurance before the final payment?

Hire a third-party inspection service (like SGS or Intertek) to perform a Pre-Shipment Inspection (PSI). They should verify the battery cycle count, frame integrity, and functional testing of the electronics. Only release the final 70% balance after receiving the inspection report and the copy of the Bill of Lading.

Related queries