SourcingAI

Three-phase electric meter price

I have found results from200000+products and70000+suppliers aboutThree-phase electric meter price

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Energy Meter
Environmental Test Chamber
Type: Power Meter
Display: Digital
Usage: Watt-Hour Meter
Electric Equipment: Single-phase
Theory: Electronic Meter
Certification: CE
Material: Steel
Structure: Vertical
Warranty: 1 Year
Protection Level: IP55
Voltage: 220V
Rated Load: <500kg
Application: Industrial
Customized: Non-Customized
Surface Treatment: Chroming
Power Meter Connection: Terminal
Measured Signal: Continuous Wave
Installation: Direct Connected
Power Source: AC
DC Voltmeter Type: Electrostatic
AC Voltmeter Type: Electrostatic
Display: Indicator
Meter for Industry and Home Use
Standard Electric Energy Meter
Multi-Functional Energy Meter
Usage: Prepayment Meter
Reactive Energy Meter
Multi-rate Watt-hour Meters
Maximum Demand Meter
Electric Equipment: Three-phase Four-wire
Theory: Static Meter
Theory: Machine-electric Type
Certification: ISO
Certification: RoHS
Customized: Customized
Power Meter Connection: Feed-through Type
Measured Signal: Pulse Peak
General Installation Meter

Sourcing guidance for Three-phase Electric Meter Price

How to choose the right Three-phase Electric Meter based on technical specifications?

Selecting a three-phase meter requires matching the device to your electrical load and monitoring needs. Key factors include Current Rating (e.g., 5(60)A or 10(100)A), Accuracy Class (Class 0.5s or Class 1.0) according to IEC 62053 standards, and Connection Type (Direct or CT-operated). For industrial applications, ensure the meter supports Multi-tariff (TOU) billing and Bi-directional measurement if solar integration is involved.

What compliance and certification standards are essential for international trade?

To ensure safety and legal entry into markets, verify that the supplier holds MID (Measuring Instruments Directive) certification for Europe, UL listing for the US, or STS (Standard Transfer Specification) for prepaid systems. Additionally, the manufacturer should be ISO 9001 certified to guarantee consistent production quality and CE/RoHS compliant for environmental and safety safety.

What communication protocols should be prioritized for smart grid integration?

Modern procurement focuses on connectivity. Ensure the meters support standard protocols such as Modbus-RTU (RS485), DLMS/COSEM, or wireless options like LoRaWAN, NB-IoT, and Wi-Fi. These allow for Remote Meter Reading (AMR/AMI) and seamless integration into existing Building Management Systems (BMS) or utility platforms.

How does the housing and environmental rating affect the price and durability?

The installation environment dictates the cost. For outdoor use, an IP54 or IP65 ingress protection rating is mandatory to prevent dust and water damage. High-quality meters use Flame-retardant PC (Polycarbonate) casing and feature Anti-tamper designs (such as magnetic field detection and terminal cover sensors) to prevent electricity theft, which may increase the initial price but reduces long-term losses.

Cross-Border Procurement Strategy & Risk Management

How can I mitigate the risk of receiving substandard electrical components?

Always request a Pre-shipment Inspection (PSI) by a third-party agency like SGS or Intertek. Specifically, ask for a Calibration Report for each batch. When sourcing via Made-in-China.com, prioritize Audited Suppliers who have undergone on-site factory verifications to ensure their production capacity matches your order volume.

What are the best practices for negotiating price with meter manufacturers?

Price is heavily influenced by the Internal Component Quality (e.g., the brand of the Shunt or Microchip). Instead of just asking for a lower price, negotiate based on Volume Tiers or Long-term Supply Agreements. Mention that you require a 2-5 year warranty, as this forces the supplier to use higher-grade components to avoid future replacement costs.

What should be considered regarding international shipping and customs for electronic meters?

Electric meters are sensitive electronic instruments. Ensure the packaging includes Anti-static shielding and shock-proof foam. For customs, verify the correct HS Code (typically 902830) to determine accurate import duties. If the meters contain Lithium Batteries for clock backup, ensure the supplier provides a UN38.3 Test Report for air or sea freight compliance.

How to ensure transaction security in high-value B2B electrical orders?

Utilize Secured Payment Terms such as Letter of Credit (L/C) for large volumes or Escrow services provided by reputable platforms. Avoid 100% upfront payments; a standard 30% deposit and 70% balance against the Bill of Lading (B/L) is the industry norm. Ensure all technical specifications are attached as a Technical Annex to the formal purchase contract.

Related queries