SourcingAI

Transformer tank making machine

I have found results from9000+products and2000+suppliers aboutTransformer tank making machine

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Production Scope: Product Line
Automatic Grade: Full-Automatic
Warranty: 1 Year
Power Source: Electric
With Timing Device
Voltage: 220V
Customized: Customized
Metal Material: Steel
Outlet Diameter: 0.5-6.0mm
Max.Inlet Wire Dia.: 16mm
Block Dia.: 560mm
Max. Number of Block: 11
Certification: ISO
Condition: New
Application: Power
Core: Core-type Transformer
Cooling Method: Dry-type Transformer
Separated Winding Transformer
Usage: Single-phase Transformer
Frequency Characteristics: Power Frequency
Shape of Core: OD
Demoulding: Automatic
Installation: Desktop
Driven Type: Electric
Mould Life: >1,000,000 Shots
Phase: Three
Automatic Grade: Automatic
Warranty: 24 Months
Warranty: 12 Months
Certification: ISO9001-2000
Certification: ISO9001
Certification: CCC
Certification: CE
Application: Electronic
Application: Instrument
Application: Lighting
Application: Rectifier
Application: Audio
Usage: Rectifier Transformer
Usage: Combined Transformer
Usage: Power Transformer
Usage: Distribution Transformer
Installation: Vertical
Mould Life: 300,000-1,000,000 Shots

Sourcing guidance for Transformer Tank Making Machine

What are the key technical specifications to consider when selecting a Transformer Tank Making Machine?

When procuring a transformer tank making machine, buyers must focus on automation levels and material compatibility. Key specs include the maximum plate thickness (typically 1.0mm to 1.5mm for corrugated fins) and the width of the steel strip (up to 1600mm). Ensure the machine features a PLC control system (such as Siemens or Mitsubishi) for precision folding and welding. High-quality machines should offer a folding height of 50mm to 400mm and a fin pitch of ≥40mm to accommodate various transformer capacities.

How do I ensure the machine meets international quality and safety standards?

Compliance is critical for industrial machinery. You must verify that the equipment carries the CE Marking for the European market or meets UL standards for North America. Look for suppliers with ISO 9001:2015 certification to ensure consistent manufacturing processes. Additionally, the machine should include emergency stop mechanisms, safety light curtains, and overload protection to comply with international occupational safety regulations.

What are the primary usage scenarios and functional requirements for this equipment?

These machines are primarily used in the power distribution industry to manufacture corrugated oil tanks for hermetically sealed transformers. The functional requirements include automatic decoiling, folding, and spot welding. A high-performance line should integrate hydraulic pressure stations that provide stable power for deep folding, ensuring the fins have excellent heat dissipation properties and structural rigidity to withstand internal oil pressure.

How can I evaluate the economic feasibility and ROI of an automated tank production line?

Calculate the Total Cost of Ownership (TCO) by factoring in the initial purchase price, energy consumption (kW/h), and labor savings. An automated line can reduce manual labor by up to 70%, significantly lowering the cost per unit. Compare the production speed (e.g., 3-4 fins per minute) against your annual output requirements. Investing in a machine with low maintenance requirements and modular spare parts will ensure a faster return on investment over a 10-15 year lifespan.

Cross-Border Procurement Considerations for Industrial Machinery

What are the common risks when importing heavy machinery from overseas?

The primary risks include damage during maritime transit and technical non-conformity. To mitigate these, require the supplier to use vacuum packaging and anti-rust coating for all precision components. Always conduct a Pre-Shipment Inspection (PSI) via a third-party agency like SGS or Intertek to verify that the machine's performance matches the technical data sheet before final payment.

How should I negotiate with suppliers on Made-in-China.com for the best terms?

Focus on Incoterms and after-sales service rather than just the sticker price. Negotiate for FOB or CIF terms to clarify insurance responsibilities. Demand a 12 to 24-month warranty period and insist on the inclusion of a wearing parts kit (e.g., seals, sensors, and welding electrodes) for the first two years of operation. For large-scale equipment, suggest a staged payment plan (30/60/10) linked to production milestones and successful commissioning.

What are the logistics and installation requirements for shipping to a specific country?

Due to the size and weight, these machines usually require 40ft Open Top or Flat Rack containers. Ensure the supplier provides a detailed foundation drawing at least 30 days before delivery so you can prepare the factory floor. Confirm if the supplier offers remote video installation guidance or if they can dispatch engineers for on-site commissioning, keeping in mind that the buyer typically covers travel and visa expenses.

How can I ensure transaction security during the purchasing process?

Utilize the secured payment services provided by Made-in-China.com to protect your funds. Avoid direct transfers to private bank accounts; always use corporate accounts verified by the platform. Ensure the Sales Contract explicitly defines the technical parameters, delivery timeline, and penalties for delays to provide legal recourse in case of disputes.

Related queries