SourcingAI

Tube bundle

I have found results from100000+products and40000+suppliers aboutTube bundle

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Semi-Trailer
High Pressure Storage & Transportation Equipment
Type: Seamless
Special Tank Container
Heat Pressure Vessel
Application: Liquid
Material: Stainless Steel
Pressure: 1.6MPa≤p<10.0MPa
Storage Medium: Moncombustible/Nontoxic
Medium Pressure (1.6MPa≤p<10.0MPa)
Condition: New
Certification: CE
Customized: Customized
Standard Component: Standard Component
Category: Cooler
Portable: Portable
Gas: SO2
Load Capacity: 25T
Wheel Base: 9000-10000mm
Tread: 2240mm
Grade: Heavy Duty
Shape: Flatbed
Self-dumping: Self-dumping
ABS Anti-lock Braking System
Storage Objects: Gas
Cooling Method: Counter Flow
Ventilation Mode: Natural Ventilation
Wet and Dry
Air Contact Way: Open
Tower Shape: Square
Noise Level: Ordinary
Application Fields: Industrial
Generator Type: Synchronous Generator
AC Three Phase
Standard: Standard
Technique: Cold Drawn
Surface Treatment: Oiled
Usage: Hydraulic/Automobile Pipe
Section Shape: Round
Style: Cast-In Type
40 feet (45,000-70,000 liters)
Insulation Type: Polyurethane Insulation
Lining Material: Epoxy Resin
Valve Type: Ball Valve
Mixing Heat Exchanger
Application: Cooler
Application: Heater
Application: Vaporizer
Application: Condenser
Material: Steel
Material: Metal
Material: Alloy Steel
Certification: ISO
Certification: RoHS
Certification: ISO/TS16949
Certification: CCC
Certification: ISO9001
Certification: TUV
Certification: TLC
Certification: ISO Tank
Load Capacity: 4T
Usage: Machinery Industry
Usage: Special Purpose
Style: Drum Type
Recuperative Heat Exchanger

Sourcing guidance for Tube Bundle

What are the key technical specifications to consider when selecting a tube bundle for heat exchangers?

When sourcing tube bundles, you must prioritize material compatibility and thermal efficiency. Key specifications include the tube diameter and wall thickness, which dictate pressure ratings, and the pitch layout (triangular or square), which affects fluid turbulence and cleaning ease. Ensure the materials, such as Stainless Steel (304/316L), Copper-Nickel, or Titanium, are selected based on the corrosiveness of the fluids. Additionally, verify the baffle spacing and type to ensure optimal heat transfer coefficients while minimizing pressure drop.

Which international compliance standards are mandatory for industrial tube bundles?

For high-pressure applications, compliance with the ASME Boiler and Pressure Vessel Code (Section VIII) is the global gold standard. In the European market, PED (Pressure Equipment Directive) 2014/68/EU certification is required. You should also ensure the manufacturer adheres to TEMA (Tubular Exchanger Manufacturers Association) standards, specifically Class R, C, or B, depending on the severity of the service environment. Always request MTRs (Material Test Reports) to verify chemical and physical properties.

How can I evaluate the manufacturing quality and durability of a tube bundle?

Quality validation should focus on the tube-to-tubesheet joints. Ask the supplier if they use strength welding, expansion (rolling), or a combination of both to prevent leaks. Request Non-Destructive Testing (NDT) reports, such as Hydrostatic Testing, Radiographic Testing (RT), or Ultrasonic Testing (UT). For longevity, check if the tubes are seamless or welded; seamless tubes are generally preferred for high-pressure or high-temperature cycles to avoid stress corrosion cracking at the seams.

What customization options should a professional supplier provide?

A top-tier supplier should offer custom finning (low-fin or high-fin) to increase surface area for gas-phase heat transfer. They should also provide U-bend or straight tube configurations based on your shell design. Ensure the supplier can work with CAD/BIM files and provide thermal calculations (using software like HTRI or Aspen Exchanger Design & Rating) to guarantee the bundle meets your specific heat load requirements.

Cross-Border Procurement & Risk Management for Tube Bundles

What are the primary risks when importing heavy industrial tube bundles?

The main risks include logistical damage and specification mismatch. Due to the weight and precision of the tubesheets, improper crating can lead to warping or surface scratches that compromise seals. To mitigate this, insist on vacuum packaging for carbon steel to prevent rust and heavy-duty steel-framed wooden crates for transport. Always use a third-party inspection agency (like SGS or Intertek) to verify dimensions and tube counts before the final balance payment is made.

How should I negotiate pricing and lead times with Chinese manufacturers?

Tube bundle pricing is highly sensitive to raw material market fluctuations (e.g., LME nickel/copper prices). Negotiate a formula-based pricing model if you have recurring orders. For lead times, which typically range from 30 to 60 days, request a detailed production schedule with milestones for material procurement, welding, and testing. For large-scale projects, sourcing via Made-in-China.com allows you to utilize Secured Trading services to protect your down payment until shipping documents are verified.

What shipping methods are recommended for international delivery?

For standard sizes, FCL (Full Container Load) is preferred to minimize handling. If the bundle exceeds standard container lengths (e.g., over 12 meters), you must arrange for Open Top containers or Flat Rack containers. Ensure the Incoterms are clearly defined; CIF (Cost, Insurance, and Freight) is often convenient for buyers, but FOB (Free On Board) gives you more control over the shipping route and costs if you have a reliable freight forwarder.

How can I ensure transaction security and supplier reliability?

Verify the supplier's Audit Reports on Made-in-China.com to confirm their factory scale and export experience. Prioritize Diamond or Gold members who have undergone on-site verification. Use Letters of Credit (L/C) for high-value transactions to ensure payment is only released upon presentation of compliant shipping and quality documents. Always clarify the warranty period (typically 12-18 months) and the supplier's policy on providing replacement tubes in case of premature failure.

Related queries