Used preform mould
I have found results from80000+products and30000+suppliers aboutUsed preform mould
Plastic Pet Preform Injection Mold Hot Runner (Shut-Off Nozzle) (48 Cavities)
48cavity Injection Pet Mineral Water Preform Mould
32cavity Hot Runner Needle Valve Pet Oil Preform Mould
72cavity Hot Runner No Tail Gate Pet Preform Mould
50 Ml Pet Mould Pet Preform Used Mould Moulding Preforms Pet
Pet Preform Injection Molding Machine 38mm Preform Mold Used Preform Molds
Cheap Price Custom Pet Preform Mold Bottle Injection Mould with Pin Valve Gate Hot Runner
Professional Hot Runner Cartridge Bottle Preform Silicone Sealant Plastic Injection Mould/Mold
32cavity Hot Runner Air Sealing Pet Preform Plastic Injection Mould
Used Hot Runner Short Tail 20mm 7.5g Pet Preform Mould
Used 32cavity 20mm 11.5g Pet Preform Tail Plastic Injection Mould
Customized Multi-Cavity High Quality Pet Wide Mouth Preform Mold/Mould
Professional Wear-Resistant Durable Bottle Pet Can Preform Mold for Plastic Injection
Optimized Cooling Customized P20 Micron-Level Precision Pet Preform Mold
Leak-Free Optimized Cooling Seamless Compatibility Pet Preform Injection Mold
High-Speed Water Bottle Preform Mold for Maximum Production Output
High-Volume Production 8-144 Cavities Optimized Cooling Pet Preform Injection Mold
12 Cavity Pet Preform Mould Used Plastic Injection Mould Pet Pet Bottle Preform Injection Mould
Sourcing guidance for Used Preform Mould
How to evaluate the technical condition of a used preform mould?
When sourcing a used preform mould, the most critical factor is the integrity of the cavity and core. You must verify the surface finish for any scratches or corrosion, as these will directly affect the transparency of the PET preform. Check the cooling system for scale buildup or leaks, which can lead to uneven cooling and cycle time delays. It is highly recommended to request a mold trial video or a latest production report to ensure the flash and parting lines are within acceptable tolerances (typically <0.05mm).
What are the key compatibility requirements for integrating a used mould into an existing production line?
Compatibility is paramount to avoid costly modifications. You must confirm the mould dimensions (length, width, and thickness) match your injection molding machine's tie-bar spacing and maximum daylight. Additionally, verify the hot runner system type (e.g., Husky, Mold-Masters, or local brands) and ensure the electrical plug configurations for heaters and thermocouples are compatible with your machine's controller. Don't forget to check the neck finish standard (e.g., PCO 1881, 30/25, or 28mm) to ensure it meets your current bottling requirements.
How can I ensure the longevity and economic feasibility of a used mould?
To ensure economic feasibility, calculate the remaining shot life. High-quality moulds made from S136 or FS136 stainless steel can last for millions of cycles; ask the supplier for the estimated total shots taken to date. Evaluate the cycle time efficiency—if a used mould runs 2-3 seconds slower than a new one, the long-term electricity and labor costs may outweigh the initial savings. Prioritize suppliers on Made-in-China.com who provide maintenance logs and details on replaced spare parts like nozzles or valve pins.
What compliance and material standards should be verified?
Even for used equipment, the output must meet food-grade safety standards. Ensure the mould was previously used with virgin PET resin to avoid contamination risks. If you are exporting the final preforms to the US or EU, the mould design must allow for products that comply with FDA or REACH regulations. Request documentation confirming the steel grade used for the cavities to ensure it provides the necessary hardness (HRC 48-52) for durable production.
Cross-Border Purchasing Considerations for Used Industrial Equipment
What are the primary risks when buying used moulds internationally?
The biggest risk is hidden mechanical fatigue or 'invisible' cracks in the manifold. Unlike new products, used items often have no standard warranty. To mitigate this, use Secure Payment services on Made-in-China.com and insist on a third-party pre-shipment inspection (PSI) by agencies like SGS or BV to verify the mould's physical condition before final payment.
How should I negotiate with suppliers for used preform moulds?
Focus your negotiation on spare parts and refurbishment. Instead of just asking for a lower price, negotiate for a complete set of replacement O-rings, heaters, and spare cavities/cores. This adds significant value and reduces your future downtime. Also, clarify the Incoterms; for heavy machinery like moulds, FOB (Free On Board) is often preferred to give the buyer better control over international freight costs.
What are the shipping and customs precautions for used machinery?
Many countries have strict regulations on the import of 'Used Machinery'. You must ensure the supplier provides a Clean Report of Findings and clearly marks the goods as 'Used' to avoid customs fraud charges. Ensure the mould is treated with anti-rust oil and packed in a vacuum-sealed foil bag inside a sturdy, fumigated wooden crate to prevent sea-salt corrosion during transit.
How do I verify the credibility of a used equipment supplier?
Look for Audited Suppliers on Made-in-China.com who have a history of exporting industrial tooling. Check their business license scope to see if they are a professional liquidator or a manufacturer. A credible supplier should be able to provide technical drawings (CAD/DWG files) and a wiring diagram for the hot runner system; refusal to provide these is a major red flag.




























