SourcingAI

Wire cable take up machine

I have found results from20000+products and7000+suppliers aboutWire cable take up machine

Commonly Used:
US$
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Double Stranding Machine
Type: Pipe Extruder
Horizontal Metal Drawing Machine
Automatic Grade: Automatic
Driven Type: Electric
Warranty: 12 Months
Condition: New
Certification: ISO
Mould Life: >1,000,000 Shots
Screw: Single-Screw
Plastic Processed: PVC
Extrusion Molding Machine
Feeding Mode: Multiple Feed
Integral Type Extruder
Engagement System: Full Intermeshing
Screw Channel Structure: Deep Screw
Exhaust: Exhaust
Automation: Automatic
Computerized: Computerized
Voltage: 380V
Forming Species: Melt Molding
Packaging Material: Metal
Usage: Wire
Metal Material: Copper
Outlet Diameter: 0.4-3.5mm
Max.Inlet Wire Dia.: 8mm
Block Dia.: 350mm
Max. Number of Block: 12
Automatic Grade: Semi-automatic
Warranty: 1 Year
Warranty: 24 Months
Certification: CE
Certification: CCC
Certification: RoHS
Certification: PSE
Certification: FDA
Voltage: 220V
Usage: Rope Wire
Prestressed Steel Wire
Usage: Standard Parts
Metal Material: Steel
Outlet Diameter: 0.5-4.5mm
Max.Inlet Wire Dia.: 6.5mm
Max.Inlet Wire Dia.: 5mm
Block Dia.: 600mm
Block Dia.: 750mm
Max. Number of Block: 11

Sourcing guidance for Wire Cable Take Up Machine

How to choose the right Wire Cable Take Up Machine for industrial production?

Selecting a high-performance take-up machine requires matching the equipment to your specific production line speed and cable diameter. Key factors include spool compatibility (DIN standards), tension control precision, and traversing accuracy. For high-speed extrusion lines, prioritize machines with automatic dual-spool changeover to ensure non-stop production. Ensure the motor is equipped with a high-quality frequency inverter (VFD) for smooth acceleration and deceleration, which prevents wire stretching or breakage.

What are the essential technical specifications and compliance standards?

Buyers must verify that the machine complies with CE marking (Machinery Directive 2006/42/EC) for safety and ISO 9001 for manufacturing quality. Critical specs include the maximum line speed (m/min), load capacity of the lifting system, and wire diameter range (e.g., 0.5mm to 10mm). For electrical safety, ensure the control cabinet meets IP54 or higher protection ratings to withstand dusty factory environments.

How does tension control impact the quality of the final cable product?

Consistent tension is the most critical factor in cable winding. Look for machines utilizing dancer arm feedback systems or load cell sensors to maintain constant tension. This prevents insulation deformation in delicate communication cables and ensures uniform winding layers, which is vital for downstream processing. Advanced models feature PLC-controlled tension settings that can be adjusted via a touch screen for different materials like copper, aluminum, or fiber optics.

What maintenance is required to ensure long-term operational stability?

To maximize ROI, choose a design that allows for easy access to lubrication points on the traversing screw and lifting rails. Regular inspection of the electromagnetic brakes and pneumatic components is essential. Suppliers on Made-in-China.com often provide detailed O&M (Operation and Maintenance) manuals and should offer a spare parts kit including commonly worn items like limit switches, belts, and bearings.

Cross-Border Procurement Considerations for Heavy Machinery

What are the primary risks when importing heavy industrial machinery?

The main risks include damage during maritime transit, non-compliance with local electrical codes, and lack of on-site technical support. To mitigate these, insist on seaworthy vacuum packaging with anti-rust coating and moisture-absorbent silica gel. Always request a Pre-Shipment Inspection (PSI) or a video of the FAT (Factory Acceptance Test) to verify the machine operates at full load before final payment.

How should I negotiate with suppliers for large-scale equipment?

Focus on the Total Cost of Ownership (TCO) rather than just the sticker price. Negotiate for a comprehensive warranty (minimum 12-18 months) and the inclusion of critical wear parts. For high-value orders, propose a staged payment structure (e.g., 30% deposit, 60% after successful FAT, 10% after installation/commissioning) to ensure supplier accountability.

What are the best practices for shipping and logistics to international destinations?

Due to the weight and dimensions of take-up machines, FOB (Free On Board) or CIF (Cost, Insurance, and Freight) are standard. Ensure the supplier uses reinforced wooden crates (IPPC certified) and provides a detailed loading plan to prevent shifting inside the container. For complex lines, inquire if the supplier can provide remote commissioning support via AR or video link if engineers cannot travel due to visa or policy restrictions.

How can I ensure transaction security during the sourcing process?

Utilize the secured payment services provided by Made-in-China.com to protect your funds until delivery milestones are met. Always verify the supplier's Business License and Export Qualifications. Checking the Audit Reports conducted by third-party agencies like SGS or TÜV Rheinland on the platform is a highly effective way to vet the manufacturer's actual production capacity.

Related queries