Powered by Made-in-China.com
Scaffold Pipe Supplier Construction Scaffold Tube BS1139 Scaffolding Pipe
Negotiable
10 Tons
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1 YearsModel NO.
ADTO-TSMaterial
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingSurface Treatment
Hot DIP GalvanizedTransport Package
PalletOrigin
Tianjin, ChinaHS Code
73063090Production Capacity
1000tons/MonthKey features
Customizable Length: Can be cut at any length per client's request.
Versatile Jointing: Can be jointed together at any angle with proper couplers.
Wide Application: Suitable for both outdoor masonry construction and indoor concrete support.
Quality Assurance: Pre-production samples and final inspection before shipment.
Top Industry Ranking: Top 1 in China for scaffolding exports, supply capacity, and quality.
Comprehensive Product Range: Offers tubes, planks, couplers, systems, props, and formwork.
Flexible Payment Options: Accepts USD, EUR, T/T, L/C, PayPal, Western Union, and more.
Fast Lead Time: Peak and off-peak season lead time within 15 workdays.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs CertifiedExport Year: 18 years CertifiedNearest Port: Shanghai Port.Tianjing Port.Average Response Time: ≤4.20h
About Our Factory & Business Background
Address11f, 16f 18f, Mingcheng Intl Bldg, Yuhua District, Changsha, Hunan, China
Plant Area1000 square meters
Number of Employees187
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Supply Chain Partners20
Our Production Capability & Technical Expertise
Main ProductsScaffolding(Including Ringlock Scaffolding, Cuplock Scaffolding, Kwickstage Scaffolding, Frame Scaffolding, Scaffolding Tube, Scaffolding Coupler, Scaffolding Planks, Scaffolding Accessories etc)
Production Lines2
Production MachinesLaser tube cutting machine, Punching machine, Riveting machine
QA/QC inspectors8 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2005-01-26
Main MarketsNorth America, Southeast Asia/ Mideast, East Asia(Japan/ South Korea)
Repeat Buyers Choice50%~80%
Annual Export Revenue300,000,000 RMB
Number of Foreign Trading Staff130
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:How long is the warranty period?
A:
1 year
Q:How can you guarantee quality?
A:
Always a pre-production sample before mass production; Always final Inspection before shipment;
Q:What can you buy from us?
A:
Scaffolding tubes, scaffolding planks, scaffolding couplers, Ringlock scaffolding sysytem, Quickstage scaffolding system, scaffoling frames, Cuplock scaffolding system, Steel props, Steel Jack base and U head, aluminium scaffolding tower,aluminium board, scaffolding Tools, all types of formwork and etc.
Q:Why should you buy from us not from other suppliers?
A:
China's scaffolding exports --TOP 1 China's scaffolding supply capacity--TOP 1 China's scaffolding quality ranking--TOP 1 China's most influential scaffolding company, 30+--scaffolding designers, 300+--Experienced staff, 100+--online customer services
Q:What services can you provide?
A:
Accepted Delivery Terms: FOB,CFR,CIF,EXW,FAS,CIP,FCA,CPT,DEQ,DDP,DDU,Express Delivery,DAF; Accepted Payment Currency:USD,EUR,,AUD,GBP,CNY; Accepted Payment Type: T/T,L/C,MoneyGram,PayPal,Western Union,Cash,Escrow; Language Spoken:English,Chinese,Spanish,Japanese,Portuguese,German,Arabic,French,Russian,Korean,Hindi,Italian
Send Inquiry
*To:
CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.
CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
BS1139 En39 En10219 Steel Tube Hollow Section Round Pipe Scaffolding Galvanized Steel Pipe
US$400.00-720.00
1 Ton(MOQ)
Easy BS1139/En 74 Standard Q235/Q345 Scaffolding Pipe Supplier From China
US$11.50-13.50
1,000 Pieces(MOQ)
Hot DIP Galvanized Steel Tube Scaffolding Q235 Pipes Scaffold
US$9.00-15.00
100 Pieces(MOQ)
Scaffolding Tube British Steel Pipe 48.3mm for Construction
US$10.00-12.00
10 Pieces(MOQ)
Easy Southeast Asia Scaffolding 48.3mm Hot DIP Galvanized Gi Steel Pipe Tube
US$14.28-14.53
1,000 Pieces(MOQ)
Bythai Scaffolding Tubes 48.3mm 48.6mm Galvanized Steel Round Gi Pipe
US$4.50-8.50
1 Piece(MOQ)
Construction Scaffold BS1139 Scaffolding Galvanized Steel Pipe
US$9.80-14.80
800 Pieces(MOQ)
China Factory BS1139 Metal Black Tube Galvanized Pipe for Scaffolding
US$1,030.00
25 Tons(MOQ)
BS1139 Scaffolding Construction Galvanized Steel Square or Round Gi Pipe
US$1,030.00
25 Tons(MOQ)
China Factory Scaffolding Clamps and Scaffold Tube Scaffolding for Sale ERW Carbon Steel Pipe
US$650.00-1,000.00
1 Ton(MOQ)
Scaffolding Tubular System Black Steel Tube ERW Scaffold Pipe Q235
US$800.00
25 Tons(MOQ)
Scaffolding Tubes Galvanized Steel Pipe Carbon Pre-Galvanized En10219 Round Scaffold Tube ERW Steel Pipes
US$700.00-1,000.00
1 Ton(MOQ)
BS1139 Pipe Clamp Galvanized Scaffolding Connectors Fittings and Tubes
US$900.00-1,200.00
10 Tons(MOQ)
Easy Construction Building Scaffold Steel Pipe 48.3mm Round Tube
US$14.28-14.53
1,000 Pieces(MOQ)
Easy Scaffolding Galvanized 48.3mm Steel Tube BS1139 Scaffolding Pipe
US$9.60-12.87
1,000 Pieces(MOQ)
Easy Scaffolding HDG Gi 48.3mm Construction Scaffolding Pipe
US$9.60-10.00
500 Pieces(MOQ)
Easy Scaffold Black Steel En74 BS1139 En39 Tube Scaffolding Galvanized Pipe
US$12.00-14.50
500 Pieces(MOQ)



















