Powered by Made-in-China.com
Complete Valve Assembly for Mud Pump Hydraulic Systems
US$30.00-80.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
AvailableModel NO.
LianruiManufacturing Process
ForgingSurface Treatment
Spray-PaintOperation Pressure
Atmospheric PressureMaterial
AlloyApplication
Mud Pump Hydraulic EndProduct Name
Valve AssemblyProduct Name2
Valves and SeatsUsage
Mud Pump PartAccesories
ValveValve Material
AlloyHeat Treatment
Carburizing Depth > 1.8 mmSurface Hardness
≥ HRC 60Type
a Critical Component of The Mud Pump Hydraulic EndSealing Material
PU / NBR / HNBRService Life
> 300 Hours (Under Harsh Conditions)Model No.
3-Wed, 4-Wed, Full OpenApplication1
Fluid End PartsCharacteristic
Pump PartValve Characteristic
Mud Pump ValveTransport Package
Wooden Bag and Sea ShipmentSpecification
4# 5# 6#7# 8#Trademark
Dezhou LianruiOrigin
ChinaHS Code
841391Production Capacity
50000pieces/YearKey features
Premium Alloy Material: Forged from 20CrMnTi alloy steel for exceptional strength and toughness.
Advanced Heat Treatment: Carburization depth exceeds 1.8mm with surface hardness reaching HRC60.
High Wear Resistance: PU, NBR, or HNBR sealing elements ensure over 300 hours of service life.
Diverse Structural Options: Available in full open, 3-web, and 4-web designs for various mud pumps.
Wide Compatibility: Compatible with major brands including American Block, Bomco, and Weatherford.
OEM and ODM Support: Full customization available from samples or customer designs.
Strict Quality Control: Three-step inspection process ensures high quality before delivery.
Fast Delivery: Standard production time is 10 to 30 days after receiving payment.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.20h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryThe supplier is a combined type company with limited overseas capabilities and no recent innovations or ODM services. Financially, the supplier shows zero operating revenue and profit over the past three years, indicating potential financial instability. It holds an ISO9001:2015 certification but lacks comprehensive after-sales service procedures. Customization capabilities are varied but do not include 3D software design services, and there is a lack of evidence for successful customer cases.
CertificationsThe supplier holds an ISO9001:2015 certificate, which is a recognized standard for quality management systems.
After-Sales capabilityThere are no written procedures or records for handling customer complaints and service capability, indicating a lack of structured after-sales service processes.
Financial creditThe supplier's financial records show zero operating revenue, profit, and a current ratio over the past three years, suggesting financial instability.
R&D capabilityThe supplier has no R&D in the past year and does not provide ODM services, indicating limited innovation capability.
Production capacityThe supplier has a range of facilities like CNC machines and offers various customization services, suggesting a certain level of production capability.
Product Q&A
Q:What is your terms of packing?
A:
Generally, we pack our goods in Wooden Bag ,you could choose the carton box or woven bags.
Q:What is your terms of payment?
A:
T/T ,30% In Advanced, and 70% Before delivery,Or L/C. The pictures of products detials and packages will be sent before you pay the balance.
Q:What is your terms of delivery?
A:
FOB, CFR, CIF.
Q:How about your delivery time?
A:
Generally, it will take within 10 to 30 days as receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q:What is your sample policy?
A:
We can supply the sample if we have ready parts in stock, but the customers have to pay the courier cost.But the delivery charges will be deducted from the customer's future order.
Send Inquiry
*To:
Dezhou Lianrui Technology Co., Ltd.
Dezhou Lianrui Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Valve Assembly for Mud Pumps in Oil Extraction
US$30.00-80.00
1 Piece(MOQ)
Premium Mud Pump Valve Assembly for Enhanced Fluid Control
US$30.00-80.00
1 Piece(MOQ)
API Mud Pump Parts Valve Assembly for Oil Drilling Mud Pump Hydraulic End Accessories
US$46.00-50.00
5 Pieces(MOQ)
Mud Pump Valve Assembly for Optimal Performance in Harsh Conditions
US$30.00-80.00
1 Piece(MOQ)
Mud Pump Part - Robust Valve Assembly for Reliable Pump Operation
US$30.00-80.00
1 Piece(MOQ)
Valve Assembly for Gardner Denver Pz-7 Triplex Drilling Mud Pump
US$68.00-98.00
1 Piece(MOQ)
Mud Pump Parts Fluid Valve Assembly for Ht400 Mud Pump
US$50.00-55.00
5 Pieces(MOQ)
High Pressure Fully Open Valve for Oilfield Mud Pump Systems
US$40.00-50.00
200 Pieces(MOQ)
Fully Open Mud Pump Valve for High Pressure Drilling Fluid Systems
US$40.00-50.00
200 Pieces(MOQ)
High Standard Hydraulic Flange Welding Type Mud Pump Gate Valve for Oilfield Drilling Rig Wellhead Demco
US$100.00-500.00
2 Pieces(MOQ)
OEM Bomco F1600/F1300 Mud Pump Valve Assembly for Drilling Rig Mud Pump Spares#Ah0000020300#Gh3161-05.11.00
US$34.00-38.00
2 Pieces(MOQ)
Fully Open Mud Pump Valve for Drilling Rig Fluid Control Systems
US$40.00-50.00
200 Pieces(MOQ)
API Mud Pump Valve Body for Bomco Discharge Cylinder Assembly
US$5,500.00-6,000.00
2 pieces(MOQ)
Petroleum Exploration Mud Pump Parts 7V1# Valve Assembly for F1600
US$36.00-59.00
10 Pieces(MOQ)
Valve Assembly, Valve Body and Valve Seat for API Standard Oil Drilling Mud Pump Parts
US$499.00-600.00
3 pieces(MOQ)
Ja-3 Safety Relief Valve Designed for 7K Mud Pump Systems
US$180.00-315.00
1 Set(MOQ)
F1300 F1000 API Valve Assembly for Mud Pump
US$20.00-33.00
1 Piece(MOQ)
Fully Open Mud Pump Valve for Drilling Fluid Management Systems
US$40.00-50.00
200 Pieces(MOQ)



















