Powered by Made-in-China.com
Mud Pump Part - Essential Valve Assembly for Reliable Operation
US$30.00-80.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
AvailableModel NO.
LianruiManufacturing Process
ForgingSurface Treatment
Spray-PaintOperation Pressure
Atmospheric PressureMaterial
AlloyValve Characteristic
Mud Pump ValveDisplay Name
Pump ValveProduct Name
Valve AssemblyUsage
Mud Pump PartsCharacteristic
Oilfield Mud Pump ValveApplication
Mud Pump Spare PartAccessories
Mud Pump PartItem
Drilling Pump ValveHeat Treatment
Carburizing Depth > 1.8 mmSurface Hardness
≥ HRC 60Sealing Material
PU / NBR / HNBRValve Material
AlloyService Life
> 300 Hours (Under Harsh Conditions)Model No.
3-Wed, 4-Wed, Full OpenType
a Critical Component of The Mud Pump Hydraulic EndTransport Package
Wooden CaseSpecification
4# 5# 6#7# 8#Trademark
Dezhou LianruiOrigin
ChinaHS Code
841391Production Capacity
50000pieces/YearCompany profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.02h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryThe supplier is a combined type company with limited overseas capabilities and no recent innovations or ODM services. Financially, the supplier shows zero operating revenue and profit over the past three years, indicating potential financial instability. It holds an ISO9001:2015 certification but lacks comprehensive after-sales service procedures. Customization capabilities are varied but do not include 3D software design services, and there is a lack of evidence for successful customer cases.
CertificationsThe supplier holds an ISO9001:2015 certificate, which is a recognized standard for quality management systems.
After-Sales capabilityThere are no written procedures or records for handling customer complaints and service capability, indicating a lack of structured after-sales service processes.
Financial creditThe supplier's financial records show zero operating revenue, profit, and a current ratio over the past three years, suggesting financial instability.
R&D capabilityThe supplier has no R&D in the past year and does not provide ODM services, indicating limited innovation capability.
Production capacityThe supplier has a range of facilities like CNC machines and offers various customization services, suggesting a certain level of production capability.
Send Inquiry
*To:
Dezhou Lianrui Technology Co., Ltd.
Dezhou Lianrui Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Valve Assembly, Valve Body and Valve Seat for API Standard Oil Drilling Mud Pump Parts
US$47.00-50.00
5 Pieces(MOQ)
F1300 F1000 API Valve Assembly for Mud Pump
US$20.00-33.00
1 Piece(MOQ)
Mud Pump Valve Assembly - Superior Valve Material for Long-Lasting Use
US$30.00-80.00
1 Piece(MOQ)
Premium Mud Pump Valve for Enhanced Functionality in Mud Pump Parts
US$30.00-80.00
1 Piece(MOQ)
Reliable Fully Open Mud Pump Valve for Natural Gas Drilling Operations
US$40.00-50.00
200 Pieces(MOQ)
Mud Pump Valve: Essential for Efficient Mud Pump Functioning
US$30.00-80.00
1 Piece(MOQ)
Mud Pump Spare Part - Premium Valve Assembly for Mud Pump Reliability
US$30.00-80.00
1 Piece(MOQ)
API 7K Valve Assembly for Mud Pump Spares Parts Valves
US$29.00-79.00
6 Pieces(MOQ)
Mud Pump Spare Parts 14p220 Valve Assembly 1560963 for Drilling Rig Parts
US$100.00
1 Piece(MOQ)
Valve Assembly, Valve Body and Valve Seat for API Standard Oil Drilling Mud Pump Parts
US$499.00-600.00
3 pieces(MOQ)
Mud Pump Parts Fluid Valve Assembly for Ht400 Mud Pump
US$41.00-42.00
6 Pieces(MOQ)
API 7V1 Valve Assembly for 12p160 Mud Pump Spares Parts
US$40.00
1 Piece(MOQ)
Mud Pump Parts Fluid Valve Assembly for Ht400 Mud Pump
US$50.00-55.00
5 Pieces(MOQ)
Leak-Proof Reliable Operation Fully Open Mud Pump Parts Valve
US$40.00-50.00
200 Pieces(MOQ)
The Valve Assembly for Mud Pump Mud Pump Spare Parts Valve and Full Open Seat
US$56.00-58.00
3 Pieces(MOQ)
API Standard Mud Pump Spare Parts Mud Pump Valve Assembly for Oil Drilling
US$20.00-50.00
5 Pieces(MOQ)
API Mud Pump Parts Valve Assembly for Oil Drilling
US$300.00-400.00
1 Piece(MOQ)
Full Open Valve Seat for Oilfield Drilling Mud Pump Essential Spare Parts
US$40.00-50.00
200 Pieces(MOQ)



















