Powered by Made-in-China.com
Mud Pump Valve - Key Element in Mud Pump Parts Assembly
US$30.00-80.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
One YearModel NO.
LianruiManufacturing Process
ForgingSurface Treatment
Spray-PaintOperation Pressure
Atmospheric PressureMaterial
AlloyValve Material
Mud Pump ValveProduct Name
Pump ValveUsage
Mud Pump PartsDisplay Name
Valve AssemblyItem
Drilling Pump ValveApplication
Mud Pump Spare PartType
Mud Pump ValveCharacteristic
Mud Pump PartAccesories
Oilfield Mud Pump ValveValve Characteristic
Mud Pump Spare PartsHeat Treatment
Carburizing Depth > 1.8 mmSurface Hardness
≥ HRC 60Sealing Material
PU / NBR / HNBRService Life
> 300 Hours (Under Harsh Conditions)Model No.
3-Wed, 4-Wed, Full OpenTransport Package
Wooden CaseSpecification
4# 5# 6#7# 8#Trademark
Dezhou LianruiOrigin
ChinaHS Code
841391Production Capacity
50000pieces/YearCompany profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.02h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryThe supplier is a combined type company with limited overseas capabilities and no recent innovations or ODM services. Financially, the supplier shows zero operating revenue and profit over the past three years, indicating potential financial instability. It holds an ISO9001:2015 certification but lacks comprehensive after-sales service procedures. Customization capabilities are varied but do not include 3D software design services, and there is a lack of evidence for successful customer cases.
CertificationsThe supplier holds an ISO9001:2015 certificate, which is a recognized standard for quality management systems.
After-Sales capabilityThere are no written procedures or records for handling customer complaints and service capability, indicating a lack of structured after-sales service processes.
Financial creditThe supplier's financial records show zero operating revenue, profit, and a current ratio over the past three years, suggesting financial instability.
R&D capabilityThe supplier has no R&D in the past year and does not provide ODM services, indicating limited innovation capability.
Production capacityThe supplier has a range of facilities like CNC machines and offers various customization services, suggesting a certain level of production capability.
Send Inquiry
*To:
Dezhou Lianrui Technology Co., Ltd.
Dezhou Lianrui Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced Mud Pump Valve for Superior Performance in Mud Pump Parts
US$30.00-80.00
1 Piece(MOQ)
Premium Mud Pump Valve for Enhanced Functionality in Mud Pump Parts
US$30.00-80.00
1 Piece(MOQ)
Drilling Spare Parts Mud Pump Valve Assembly Alloy Steel Material
Negotiable
1 Piece(MOQ)
Mud Pump Valve: Essential for Consistent Performance in Mud Pump Parts
US$30.00-80.00
1 Piece(MOQ)
Mud Pump Valve: Designed for Durability in Mud Pump Parts Applications
US$30.00-80.00
1 Piece(MOQ)
API 7K Mud Pump Parts Through-Hole Full Open Valve Assembly
US$20.00-50.00
5 Pieces(MOQ)
Triplex Mud Pump Parts /Valve Assembly/ Valve Seat / Valve Body
US$10.00-80.00
2 Pieces(MOQ)
Full Open Seat Valve Assembly for Mud Pump Spare Parts
US$44.50-45.50
6 Pieces(MOQ)
API 8# Valve Assembly Pn 1560963 for 14p220 Mud Pump Spare Parts
US$100.00
1 Piece(MOQ)
Petroleum Exploration Mud Pump Parts 7V1# Valve Assembly for F1600
US$36.00-59.00
10 Pieces(MOQ)
Mud Pump Valve Assembly Oil Drilling Mud Pump Parts/ Full Open Seat Mud Pump Valve
US$20.00-25.00
5 Pieces(MOQ)
Drilling Valve Assembly API Mud Pump Spare Parts Valve Body and Valve Seat
US$499.00-600.00
3 pieces(MOQ)
API Mud Pump Parts Valve Assembly for Oil Drilling Mud Pump Hydraulic End Accessories
US$46.00-50.00
5 Pieces(MOQ)
Bomco F1600 Mud Pump Spare Parts Valve Assembly/Valve Body
US$41.00-42.00
6 Pieces(MOQ)
Mud Pump Replacement Parts Mud Pump Valve Assembly List of Mud Pump Parts
US$50.00-53.00
3 Pieces(MOQ)
Drilling Mud Pump Replacement Parts Upper Lower Guide Valve Rod Guide Valve Assembly/ Valve Seat
US$550.00-600.00
2 pieces(MOQ)
Valve Assembly, Valve Body and Valve Seat for API Standard Oil Drilling Mud Pump Parts
US$499.00-600.00
3 pieces(MOQ)



















