Powered by Made-in-China.com
Premium Mud Pump Valve Assembly - Essential for Mud Pump Repair
US$30.00-80.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
AvailableWarranty
One YearModel NO.
LianruiManufacturing Process
ForgingSurface Treatment
Spray-PaintOperation Pressure
Atmospheric PressureMaterial
AlloyValve Material
Mud Pump ValveProduct Name
Mud Pump Spare PartsAccessories
Valve AssemblyUsage
Mud Pump PartsType
Mud Pump Spare PartCharacteristic
Mud Pump PartDisplay Name
Oilfield Mud Pump ValveValve Characteristic
Drilling Pump ValveHeat Treatment
Carburizing Depth > 1.8 mmSurface Hardness
≥ HRC 60Sealing Material
PU / NBR / HNBRService Life
> 300 Hours (Under Harsh Conditions)Model No.
3-Wed, 4-Wed, Full OpenApplication
Fluid End PartsTransport Package
Wooden CaseSpecification
4# 5# 6#7# 8#Trademark
Dezhou LianruiOrigin
ChinaHS Code
841391Production Capacity
50000pieces/YearCompany profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.09h CertifiedTerms of Payment: LC, T/T, D/P, etc.
AI-Powered supplier vetting
SummaryThe supplier is a combined type company with limited overseas capabilities and no recent innovations or ODM services. Financially, the supplier shows zero operating revenue and profit over the past three years, indicating potential financial instability. It holds an ISO9001:2015 certification but lacks comprehensive after-sales service procedures. Customization capabilities are varied but do not include 3D software design services, and there is a lack of evidence for successful customer cases.
CertificationsThe supplier holds an ISO9001:2015 certificate, which is a recognized standard for quality management systems.
After-Sales capabilityThere are no written procedures or records for handling customer complaints and service capability, indicating a lack of structured after-sales service processes.
Financial creditThe supplier's financial records show zero operating revenue, profit, and a current ratio over the past three years, suggesting financial instability.
R&D capabilityThe supplier has no R&D in the past year and does not provide ODM services, indicating limited innovation capability.
Production capacityThe supplier has a range of facilities like CNC machines and offers various customization services, suggesting a certain level of production capability.
Send Inquiry
*To:
Dezhou Lianrui Technology Co., Ltd.
Dezhou Lianrui Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Premium Mud Pump Valve Assembly - Essential for Quality Mud Pump Parts
US$30.00-80.00
1 Piece(MOQ)
Premium Mud Pump Safety Relief Valve for Oilfield Drilling
US$30.00-80.00
1 Piece(MOQ)
Valve Assembly for Mud Pump API-5#API-6#API-7#API-8# 7V1
US$20.00-80.00
1 Piece(MOQ)
Mud Pump Part - Premium Valve for Effective Pump Performance
US$30.00-80.00
1 Piece(MOQ)
Premium Mud Pump Valve for Superior Pump Efficiency
US$30.00-80.00
1 Piece(MOQ)
API Valve Assembly 7V1 for 12p160 Mud Pump Spares
US$50.00
1 Piece(MOQ)
High-Performance Mud Pump Valve Body for Bomco Assemblies
US$5,500.00-6,000.00
2 pieces(MOQ)
The Valve Assembly for Mud Pump Mud Pump Spare Parts Valve and Full Open Seat
US$56.00-58.00
3 Pieces(MOQ)
API Mud Pump Valve Body for Bomco Discharge Cylinder Assembly
US$5,500.00-6,000.00
2 pieces(MOQ)
Valve Seat, Valve Body, Insert Rubber and Assembly for Mud Pump
US$60.00-62.00
3 Pieces(MOQ)
Mud Pump Spares API 8# Valve Assembly for 14p220
US$100.00
1 Piece(MOQ)
Valve Assembly, Valve Body and Valve Seat for API Standard Oil Drilling Mud Pump Parts
US$499.00-600.00
3 pieces(MOQ)
F1300 F1000 API Valve Assembly for Mud Pump
US$20.00-33.00
1 Piece(MOQ)
Petroleum Exploration Mud Pump Parts 7V1# Valve Assembly for F1600
US$36.00-59.00
10 Pieces(MOQ)
API Mud Pump Valve Body and Inserts Assembly and Repair Kits
US$10.00-80.00
2 Pieces(MOQ)
API Mud Pump Parts Valve Assembly for Oil Drilling Mud Pump Hydraulic End Accessories
US$46.00-50.00
5 Pieces(MOQ)
Full Open Seat Valve Assembly for Mud Pump Spare Parts
US$44.50-45.50
6 Pieces(MOQ)
High Pressure Mud Pump Valve Assembly for Oilfield Pumps F-500/800/1000/1300/1600
US$29.00-41.00
5 Pieces(MOQ)



















