SourcingAI
Try for free
Powered by Made-in-China.com
CIP & Cil Gold Ore Processing Plant for Gold Dressing
US$5,000.00
1 Set

Product profile

Customization

Available

Type

Gold Cil Plant

Voltage

Customize Based on Customers' Local Condition

Model NO.

FTL

Weight

Varies Based on Capacity

Material

Carbon Steel

Certification

ISO9001:2000, CE

Energy Saving

Energy Saving

Warranty

2 Years

Color

Customize Based on Customers' Local Condition

Customized

Customized

Condition

New

After-sales Service

We Can Send Engineer for Installation and Training

Processing Capacity

10-200m³/H Customized

Handling Mineral

Gold Ore

Voltage Standard

380V/415V Customized

Recovery Rate

92%-98%

Transport Package

Standard Container and Box

Specification

50~1000 TPD

Trademark

FTL

Origin

China

HS Code

8474209000

Key features

Customizable Voltage: Voltage is customized based on customers' local conditions.
Wide Capacity Range: Standard capacity ranges from 50 to 1000 TPD with models up to 5000 TPD.
Advanced CIL Technology: Features less process flow and timesaver leaching to reduce production expenditure.
High Efficiency Extraction: Advanced extraction technology improves gold extraction efficiency significantly.
ISO9001:2000 Certified: Manufacturing process meets international ISO9001:2000 quality standards.
Carbon Steel Construction: Durable carbon steel material ensures long-lasting performance in mining.
Fast Gold Plating: Gold plates onto stainless steel cathodes in approximately 3 minutes.
Closed-Loop Grinding: Two-step two-closed-loop grinding flow chart ensures optimal particle size.

Company profile

Henan Fantianliang Machinery And Equipment Co., Ltd.
Multi-language PioneerExhibition ExperienceImporters and Exporters
Business Type: Trading Company CertifiedR&D Capacity: ODM Service AvailableExport Year: 2018-09-10Nearest Port: QingdaoAverage Response Time: ≤1.61hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressZhengzhou, Henan, China
International Commercial Terms(Incoterms)FOB, EXW, CIF
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsGold CIP Plant, Mining Equipment, Ball Mill, Crusher Plant, Gold Cil Plant, Copper Flotation Plant, Mineral Process Plant, Flotation Machine, Gold Recovery Plant, Gold Desorption and Electrolysis Machine

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Our Certifications, Standards & Industry Recognition

Product CertificationCE

Product Q&A

Q:What is the recovery rate of the plant?
A:
The plant achieves a gold recovery rate between 92% and 98%.
Q:Can the voltage be customized?
A:
Yes, the voltage is customized based on 380V/415V to match customers' local conditions.
Q:What material is the plant made of?
A:
The plant is constructed from durable carbon steel.
Q:Is the plant certified?
A:
Yes, the plant holds ISO9001:2000 certification.
Q:How long does the gold plating process take?
A:
Gold quickly plates onto stainless steel cathodes in about 3 minutes during electrowinning.

Send Inquiry

*To:Henan Fantianliang Machinery And Equipment Co., Ltd.Henan Fantianliang Machinery And Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

120tpd Gold Extraction Cil/CIP Plant for Rock Ore
Made-in-China.com
Customized 500 Tpd Gold Cil Processing Plant for Mining
Made-in-China.com