Powered by Made-in-China.com
Pig Ear Coupler Scaffold Clamp for Steel Tube Fixing in Construction Sites
US$1.31-1.45
1,000 Pieces
Sample price:US$1000.00/piece.Request sample
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
GalvanizedModel NO.
Pig ear fastenerMaterial
SteelType
Scaffold CouplersMaterial
SteelType
MobileStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Floor Type ScaffoldingLapping Form
Full ScaffoldingErection Position
External ScaffoldingMove Method
Attached Lifting ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldAfter-Sales Service
24 Hours OnlineWarranty
1 YearRaw Material
Q235Colour
Silver, Copper, GreenUsage
Construction, Interior DecorationWeight
0.98kgSurface Treatment
GalvanizeTransport Package
Standard Seaworthy PackagingOrigin
ChinaHS Code
7308400000Production Capacity
50000PCS/MonthKey features
High-Strength Material: Made from premium Q235 steel with high-strength drop forging for durability.
Corrosion Resistance: Galvanized finish (hot-dip or electro) enhances rust and corrosion resistance.
Versatile Pipe Sizes: Supports various pipe diameters including 32mm, 48mm, 60mm, 80mm, 100mm, and 120mm.
Multiple Coupler Types: Includes Right Angle, Swivel, Pig Ear, Butt-Joint, and Cantilever fasteners.
OEM/ODM Support: Customization available from designs or samples with OEM and ODM services.
Quality Assurance: Manufactured to BS1139 standards with strict visual and function inspections.
Fast Delivery: Average lead time within 15 workdays for both peak and off-season periods.
Wide Application: Ideal for construction, industrial scaffolding, shipbuilding, and interior decoration.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Average Response Time: ≤0.87hTerms of Payment: T/T, LC, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CPT, CIP
AI-Powered supplier vetting
SummaryZhite Building Materials is a construction-material supplier founded in 2021 that integrates R&D, production, and sales, with a focus on building support systems and scaffolding. It reports OEM service for recognized brands, customization from designs or samples, two production lines, in-stock capability, and stated inspection and testing practices. The supplier cites compliance with national construction safety standards and ISO9001, ISO14001, and OHSAS18001 systems, but the information does not establish certificate validity or ownership. Key weaknesses include no documented quality assurance, traceability, corrective-action, or complaint-handling procedures; no valid manufacturing-capacity contract with affiliated subcontractors; no overseas warehouse or showroom; and less than one year of export experience. Financial figures are excluded, and the available year labels alone do not establish financial credibility.
Supplier typeFounded in 2021, Zhite Building Materials describes itself as a construction-material service provider integrating R&D, production, and sales, specializing in building support systems and scaffolding. It reports two production lines, wire and metal-processing equipment, and annual scaffolding output of 100,000 pieces, supporting classification as a manufacturer rather than only a trading intermediary.
R&D capabilityThe supplier reports an R&D and production integration model, partnerships with universities and research institutions, and a team of over 20 senior engineers and technical professionals. However, another record states total R&D engineer experience of 1 and no available SDK; these data do not establish a specific software-development capability and create uncertainty about the depth of the reported R&D resources.
Production capacityProduction evidence includes two lines, wire-processing and welding equipment, six to ten quality-control staff, in-stock capability, and stated off-peak lead time within 15 working days with peak fulfillment in one month. Production controls include dedicated inspection stations and sampling tests, but finished products are also reported as checked by packing staff, and there is no valid contract with affiliated subcontractors, so capacity and control documentation are only partially substantiated.
Customization capabilityThe supplier explicitly offers customization from customer designs, customization from samples, and minor customization. This directly demonstrates multiple forms of product adaptation capability.
Product Q&A
Q:What material are the scaffold couplers made of?
A:
They are made from premium Q235 steel, ensuring high strength and durability.
Q:What surface treatments are available?
A:
We offer galvanizing, hot-dip galvanizing, and spraying treatments to enhance corrosion resistance.
Q:What pipe diameters do these couplers fit?
A:
They fit various diameters including 32mm, 48mm, 60mm, 50mm, 80mm, 100mm, and 120mm depending on the type.
Q:Can I customize the product with my own design?
A:
Yes, we provide OEM and ODM services, allowing customization from designs or samples.
Q:What is the minimum order quantity (MOQ)?
A:
The minimum order quantity is 1000 pieces.
Send Inquiry
*To:
Cangzhou Zhite Building Materials Co., LTD
Cangzhou Zhite Building Materials Co., LTD*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy Duty Galvanized Scaffolding Fixed Pipe Clamp with Double Flat Welding Base for Construction Scaffold Tube
US$0.03-0.05
3,000 Pieces(MOQ)
Hot DIP Galvanized Board Retaining Clamp for Scaffold Plank Fixing
US$0.0065-0.0083
1,000 Pieces(MOQ)
Forging Tube Connector Steel Joint Coupler Scaffolding Swivel Clamp for Pipe Connection
US$0.10-2.00
500 Pieces(MOQ)
Galvanized Steel Scaffolding Ladder Hook Clamp, Adjustable Ladder Fixing Clamp for Construction Scaffold Tube
US$0.003-0.006
1,000 Pieces(MOQ)
Pressed Steel Scaffolding Oyster Coupler Clamp for Construction
US$0.50-3.50
10,000 Pieces(MOQ)
Heavy-Duty Floor Type Scaffold Board Fixing Clamp for Safety
US$1.31-1.45
1,000 Pieces(MOQ)
Q235 Steel Scaffold Swivel Clamp for Tube Joining with Zinc Finish
US$1.31-1.45
1,000 Pieces(MOQ)
Construction Galvanized J Type Hanging Hook Clamp, Stainless Steel Carbon Steel Threaded J Hook for Pipe Fixing
US$0.0008-0.001
100 Pieces(MOQ)
Steel Right Angle Coupler Scaffold Clamp for Secure and Durable Scaffolding Pipe Connections
US$1.31-1.45
1,000 Pieces(MOQ)
OEM Customizable Scaffold Scaffolding Right Angle Coupler Clamp for Steel Pipe Connection and Construction Use
US$1.31-1.45
1,000 Pieces(MOQ)
Double Clamp Scaffolding Coupler Fastener Swivel Scaffold Clamp for Scaffolding Material Construction
US$5.50-8.00
1,000 Pieces(MOQ)



















