Powered by Made-in-China.com
Low Temperature Ductile Iron Rotor Hub Castings Utility-Scale Wind Turbine Hub
US$2,600.00
1-2 Tons
US$2,370.00
3+ Tons
Product profile
Customization
AvailableType
Chemical Hardening SandCasting Method
Thermal Gravity CastingModel NO.
WT-R06Sand Core Type
Resin Sand CoreApplication
MW Wind TurbinesMachining
CNC MachiningMaterial
IronSurface Treatment
CustomizedSurface Roughness
Based on Customer RequirementsStandard
ASMECertification
CE, RoHS, ISO 9001:2000, ISO 9001:2008, ISO9001:2015,ISO 14001,ISO 45001:2018One-Stop Supply
Casting + MachiningNDT Method
Ut,MtMin. Temp
-40°C Impact TestedMax Capacity
60,000 Tons/YearNodularity Rate
≥90%Machining Accuracy
±0.01 mmSystem Position
Wind Turbine Rotor SystemProduct Name
Machined Rotor Hub CastingTurbine Type
Onshore & Offshore Wind TurbinesOEM Service
Built to DrawingTransport Package
CustomizedSpecification
customizableTrademark
HNHJOrigin
ChinaHS Code
7308900000Production Capacity
60000 Tons/YearKey features
Customized Surface Treatment: Surface treatment and roughness are fully customized based on specific customer requirements.
Built to Drawing: Manufactured strictly according to customer drawings and technical specifications without standard molds.
One-Stop Supply: Integrated production covering casting, heat treatment, CNC machining, and inspection in one facility.
Comprehensive NDT: Ultrasonic Testing (UT) and Magnetic Particle Testing (MT) available upon request.
Customized Packaging: Seaworthy packaging with wooden crates and steel frames tailored for oversized components.
Flexible Customization: Offers full, minor, and flexible customization options from samples or designs.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 18 years CertifiedNearest Port: lianyungang portAverage Response Time: ≤0.12h
About Our Factory & Business Background
AddressXiawo Town, Shangjie District , Zhengzhou, Henan, China
Plant Area30857.93 square meters
Number of Employees200
Registered Capital70,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months, 3-6 months, 6-12 months Off Season Lead Time: 1-3 months, 3-6 months, 6-12 months
Minimum Order Quantity1 set
Supply Chain Partners30
Our Production Capability & Technical Expertise
Main ProductsAbsorption Tower, Distillation Column,Wind power equipment components
Production Lines1
Production MachinesMedium Frequency Furnace, Luosha Machine, Shot Blasting Machine, Vertical Lathe, Boring Machine, CNC Gantry, Horizontal Lathe
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers6 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment1996-08-18
Main MarketsEurope, Southeast Asia/ Mideast
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff1
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015, ISO45001:2018, ISO14001
Cooperated with Fortune 500No
Product Q&A
Q:Why is machining allowance important for a wind turbine hub?
A:
Insufficient machining allowance may prevent critical surfaces from reaching the required tolerances, while excessive allowance increases machining time and cost. Proper casting process planning helps balance manufacturing efficiency and dimensional accuracy.
Q:Why do some wind projects require low-temperature ductile iron?
A:
For turbines operating in cold climates or offshore environments, low-temperature ductile iron provides better impact toughness, helping maintain structural reliability under demanding service conditions.
Q:What usually determines the manufacturing lead time?
A:
Lead time mainly depends on casting size, tooling requirements, machining scope, inspection standards, and production scheduling rather than casting alone. Confirming technical details early helps avoid delays during production.
Send Inquiry
*To:
HENAN PROVINCE CHEMICAL MACHINERY MANUFACTURING CO., LTD.
HENAN PROVINCE CHEMICAL MACHINERY MANUFACTURING CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Grey Iron Ductile Iron Hubs Tractor/Agricultural/Construction/Industrial Machinery Casting and Parts Customized
US$0.60-150.00
100 Pieces(MOQ)
Hubs for Auto Parts Grey/Ductile Iron Casting Foundry OEM Machinery Parts
US$0.60-150.00
100 Pieces(MOQ)
Sand Casting 5MW+ Wind Turbine Hub Ductile Iron Wind Turbine Casting
US$2,397.00-2,555.00
1 Ton(MOQ)
Grey Iron Ductile Iron Hub Casting and Parts for Agricultural and Construction Machinery Manufacturer Customized
US$0.60-150.00
100 Pieces(MOQ)
OEM Sand Casting Services Premium Spheroidal Ductile Iron Resin Wheel Hub
US$7.58-8.89
2 Pieces(MOQ)
Megawatt-Scale Wind Turbine Hub Casting Supplier Custom Sg Iron Rotor Hub
US$2,449.00-2,690.00
1 Ton(MOQ)
CNC Machined High Quality Ductile/Gray Cast Iron Casting Sand Casting Factory Wheel Hub
US$2.00-5.00
300 Pieces(MOQ)
Offshore Wind Rotor Hub Casting Megawatt Wind Turbine Hub Built to Drawing
US$3,640.00-3,860.00
1 Ton(MOQ)
Custom Closed Blade Sand Casting Fan Rotor Hub for Ventilation
US$70.00-95.00
50 Pieces(MOQ)
Wheel Bearing Hub Made From Ductile Cast Iron
US$1.10-3.50
200 kg(MOQ)
Agriculture Machinery Part Ductile Cast Iron Main Shaft Shell Wheel Hub
US$2.34
100 Pieces(MOQ)
Ductile Iron Casting Parts, Wheel Edges, Bearing Seats, Wheel Hub
US$50.00
20 Pieces(MOQ)
OEM Ductile Iron Forklift Wheel Hub for Bt by Sand Cast Process
US$0.10-10.00
100 Pieces(MOQ)
OEM Gray Cast Iron Trailer Front Wheel Hub Assembley
US$1,000.00-1,200.00
1 Ton(MOQ)
High-Performance CNC Machined Ductile Iron Wheel Hub for Agriculture
US$10.00
5 Pieces(MOQ)
Ductile Iron Qt500-7 Trailer Axle Hub with Stud Holes
US$400.00-500.00
1 Ton(MOQ)
Cast Iron Hub
US$0.80-2.50
100 KG(MOQ)



















